PDF Workshop Manual New Holland E265BJ Hino Engine - 7 MB

This workshop manual provides complete service and overhaul information for the Hino engine used in the New Holland E265BJ excavator.

It is a comprehensive guide for technicians, covering everything from diagnostics to complete engine rebuilds.

The manual includes detailed specifications, torque values, and step-by-step procedures.

Keep the heart of your excavator running strong with this factory service manual.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 3 ---
1. OUTLINE

(6) Engine key off before touching terminals of starter             (2) Flexible hose (F hose)
    and alternator.                                                     •   Even if the connector and length of hose are the
(7) Remove battery grounding terminal before begin-                         same, the parts differ according to the with-
    ning work close to battery and battery relay with                       standing pressure. Use proper parts.
    tools.                                                              •   Tighten it to the specified torque, and check that
(8) Wash machine with care so as not to splash water                        it is free from twist, over tension, interference,
    on electrical equipment and connector.                                  and oil leak.
(9) When water has entered in the waterproofed con-
                                                                    1.1.6      WELD REPAIR
    nector, the removing of water is not easy. So check
                                                                    (1) The weld repair should be carried out by qualified
    the removed waterproofed connector with care to
                                                                        personnel in the specified procedure after discon-
    protect it from entry of water. If moisture adheres on
                                                                        necting the grounding cable of battery. If the
    it, dry it completely before connecting.
                                                                        grounding cable is not disconnected, the electrical
                                                                        equipment may be damaged.
                                                                    (2) Remove parts which may cause fire due to the en-
Battery fluid is dangerous.                                             try of spark beforehand.
The battery fluid is dilute sulfuric acid, and causes               (3) Repair attachments which are damaged, giving
scald and loss of eyesight by adhering on eyes,                         particular attention to the plated section of piston
skin and clothes. When the fluid has adhered on                         rod to protect it from sparks, and don’t fail to cover
them, take an emergency measure immediately and                         the section with flame-proof clothes.
see a doctor for medical advice.
                                                                    1.1.7      ENVIRONMENTAL ISSUES
•   When it has adhered on skin ;
    Wash with soap and water.                                       (1) Engine should be started and operated in the place
                                                                        where air can be sufficiently ventilated.
•   When it has got in eyes ;
    Wash in water for 10 minutes or more immedi-                    (2) Waste disposal
    ately.                                                              The following parts follows the regulation.
                                                                        Waste oil, waste container and battery
•   When it has spilled out in large quantity ;
    Use sodium bicarbonate to neutralize, or wash                   (3) Precautions for handling hydraulic oil
    away with water.                                                    Hydraulic oil may cause inflammation of eyes.
                                                                        Wear goggles to protect eyes on handling it.
•   When it was swallowed ;
    Drink milk or water.                                                •   When it has got in eyes ;
                                                                            Wash eyes with water until the stimulus is gone.
•   When it has adhered on clothes ;
    Wash it immediately.                                                •   When it was swallowed ;
                                                                            Don’t force him to vomit it, but immediately re-
1.1.5        HYDRAULIC PARTS                                                ceive medical treatment.
                                                                        •   When it has adhered on skin ;
                                                                            Wash with soap and water.
                                                                    (4) Others
(1) O-ring                                                              For spare parts, grease and oil, use KOBELCO
    •   Check that O-ring is free from flaw and has                     genuine ones.
        elasticity before fitting.
    •   Even if the size of O-ring is equal, the usage dif-
        fers, for example in dynamic and static sec-
        tions, the rubber hardness also differs
        according to the pressure force, and also the
        quality differs depending on the materials to be
        seated. So, choose proper O-ring.
    •   Fit O-ring so as to be free from distortion and
        bend.
    •   Floating seal should be put in pairs.


                                                              1-5

--- Page 4 ---
2. SPECIFICATIONS

2.4          TRANSPOTATION
2.4.1        OVERALL DIMENSIONS OF MACHINE ON A TRAILER
(1) 6.02m (19ft-9in) Boom+2.98m (9ft-9in) Arm+1.00m3 (1.3cu•yd) Bucket

                                 Model
                                                            E265B                           E265BLC
Item
Width 600mm (23.6in) shoes                          2,990 (9ft-10in)                  3,190 (10ft-6in)
Weight                                          24,700kg (54,460 lbs)              25,200kg (55,570 lbs)

                                                                                                     Unit : mm (ft-in)


                                           10,120 (33'2")                                   2,300 (7'7")
                                                                                          [ 2,450 (8'1")]


                                                                                                                              3,200 (10'6")
                                                                                      38(1.5")


                                                                                                                          3,800 (12'6")
                             A


                                                                                                                600 1,080 (3'7")
220


                                                                                                              (23.6")
(8.66")
[ 370
  (14.6")]                   A
                                                                              ")
                                                                  3.     94
                                                               0(
                                                             10
                                                                  330 (13")


                                                        SECTION A-A


     * marks indicate LC specifications.


                                                              2-8

--- Page 5 ---
3. ATTACHMENT DIMENSIONS

3.1          BOOM
3.1.1        BOOM DIMENSIONAL DRAWING


                                        Fig. 3-1 Boom dimensional drawing

                                                                                                    Unit : mm (ft-in)
                                                                            STD                       —
                       6.02M (19ft-9in) BOOM
                                                                       LQ02B00251F1                   —
        No                             NAME                                             DIMENSION
        A      Boom length                                              6,020 (19'9")                 —
        B      Boom foot width                                           752 (29.6")                  —
        C      Boom end inner width                                      380 (15.0")                  —
        D      Boom end outer width                                      528 (20.8")                  —
        E      Height of boom cylinder rod pin                           1,063 (3'6")                 —
        F      Height of arm cylinder (head side) pin                    1,305 (4'3")                 —
        G      Distance between pins of boss                           R2,437 (7'12")                 —
        H      Distance between pins of bracket                        R3,009.5 (9'10")               —
        I      Arm cylinder (head side) inner width                      136 (5.35")                  —
        J      Outer width of bracket on the arm cylinder (rod side)     522 (20.6")                  —
               mounting
        d1     Boom foot pin dia.                                       ø 100 (3.94")                 —
        d2     Boom cylinder (rod side) pin dia.                         ø 90(3.54")                  —
        d3     Pin dia. of boom end.                                     ø 90 (3.54")                 —
        d4     Arm cylinder (head side) pin dia.                         ø 90(3.54")                  —


                                                          3-3

--- Page 6 ---
11. TOOLS


      Issue         Date of Issue             Applicable Machines               Remarks
                                     SK250-8: LQ12-06001~           S5LQ1114E01
   First edition    October, 2006                                                                 K
                                     SK260LC–8 : LL12-05001~        (ASIA, OCE)
                                                                                 n
        n            May, 2007                        n                                           K
                                                                    ASIA (HS Engine)
                                     E265B : LQ12-06001~                         n
        n             July, 2007                                                                  K
                                     E265BLC : LL12-05001~          (NHK Russia)
                                                                                 n
        n                 n                           n                                           K
                                                                    (NHK Middle East)
                                                                                 n
        n          September, 2007                    n                                           K
                                                                    NHK Russia (HS Engine)
                                                                                 n
        n                 n                           n                                           K
                                                                    NHK Middle East (HS Engine)


                                                  11-2

--- Page 7 ---
11. TOOLS

                                          Table11-4

                                                         M8 Eye bolt

                                    M8 X 18
        Plug                        Additional
                    YN01H01001P1
                                    threading
      Nominal
7     1-14UNS                                                   HEX 27         Flare hose

       Eye bolt      ZS91C00800
                                                               1-14UNS


                                                         M8 Eye bolt
                                    M8 X 18
                                    Additional
        Plug        YN01H01002P1    threading
       Nominal
8    1 3/16-12UN                                                  HEX 36       Flare hose

       Eye bolt      ZS91C00800
                                                               1 3/16-12UN


                                                        M12 Eye nut


         Plug       ZE25F08000
        PF1/2                                                                For slinging the
9                                                       Weld
                      Coupling                                                 swivel joint
                        half                               Coupling half


                                                      PF 1/2


     TORX driver                       5.49
     (with tamper
                                                                              For instrument
10       proof)          —         Point shape
                                                                             panel cover (RH)
          T30
       (For M6)


                                            11-13

--- Page 8 ---
12. STANDARD MAINTENANCE TIME TABLE

12.1        STANDARD WORKING TIME TABLE FOR THE MAINTENANCE OF EXCAVA-
            TOR
(1) Standard maintenance time table
    1) Units of working time : 6 minutes = 0.1 hour
    2) Calculating method of standard maintenance time :
       Maintenance time=Working timeuNumber of workers
       (Working time=Maintenance timeyNumber of workers)
    3) When more than one operation is going on :
       Add each standard service time. A pure time (readily started) is given except covers easily removed by hand.
       Assy works include the following works marked with black dot •.
    4) O/H : The removing and attaching time is not included.
    5) Abbreviations in the table.

          A/C      : Air conditioner             C/V       : Control valve              O/H        : Over haul
          ASSY     : Assembly                    Cyl       : Cylinder                   SOL        : Solenoid
          ATT      : Attachment                  E/G       : Engine                     SW         : Switch
          BRG      : Bearing                     F hose    : Flexible hose              V          : Valve

(2) Classification of working code

    No.              Group                                                   Remarks
    01      Attachment                 Indicates installing, removing, replacement and overhaul.
    02      Cab & Guard
    03      Swing frame
    04      Travel system
            Electric                   Indicates the installing, removing and replacement of single items.
    06
            equipments
    09      E/G relation               Indicates overhaul of the single engine.
                                       (Materials prepared by manufacturer )

(3) Conditions for standard service time of the engine
    1) Tools designated by E/G maker are used
    2) Genuine parts are changed
    3) Correct working procedures are observed.
•   The time required for works specified in this Chapter shows the total time for maintenance.


                                                          12-4

--- Page 9 ---
12. STANDARD MAINTENANCE TIME TABLE

12.2       ENGINE MAINTENANCE SERVICE STANDARD TIME LIST
           (TEMPORARY EDITION)
Preface
This standard working time is based on the work time required for service of engine like disassembly, check, adjust-
ment and assembly and so on under a following condition.
This standard working time is provided under the following conditions.

12.2.1     MEASURING METHOD
(1) The time from the worker beginning working at the regular position of machine to the returning to the regular
    position after completion of the work is counted as working time.
(2) The measuring unit is in 0.1 minute, and then round up the fractions.
(3) The work is carried out by a couple of workmen as a general rule, and the man-hour of two workers is counted
    as the working time. But light work which can be carried out easily by a person and the efficient is higher is count-
    ed as a workman.

12.2.2     WORKING CONDITION

12.2.2.1     TOOLS, INSTRUMENT
(1) Hand tool ;
    Tools which are commercially available and each workman usually carries
(2) Common tool ;
    Tools which are commercially available and each workman do not usually carry but the storing place is specified
(3) Special tool ;
    Tools especially prepared by HINO Motor’s Ltd. and the storing place is specified
(4) Machine tool ;
    When measuring equipment and instrument are used, the time required to move parts to the specified place is
    included but the time waiting for tool is not included as a general rule

12.2.2.2     WORKING PROCEDURE
The disassembly and assembly should be carried out according to working procedure prepared by HINO Motor’s
Ltd. Service Technical Dept. Training Group.

12.2.2.3     STANDARD WORKMAN QUALIFICATION
Workmen shall basically acquire 2~3 years of maintenance experience of HINO

12.2.3     STANDARD TIME CONSTITUENT

12.2.3.1     STANDARD WORKING TIME = NET WORKING TIME + STANDARD TIME + STANDARD ALLOW-
             ANCE TIME
(1) Net working time
    The time workman works actually and the time required for measurement, cleaning, and so on is included, but
    the time required for troubleshooting is not included
(2) Standard time
    Time required for preparation to the beginning of work, preparation of special tool, measuring equipment, parts
    and so on, and for the work site clean-up.
(3) Standard allowance time
    Calculate the allowance time directly required for workmen from the following equation.
    Net standard time u HINO allowance rate
    Allowance rate varies within the range of 0.15 ~ 0.75 according to the work difficulty, contents, working position
    and so on.


                                                        12-15

--- Page 10 ---
13. MAINTENANCE STANDARD AND TEST PROCEDURE


     Issue         Date of Issue             Applicable Machines               Remarks
                                    SK250-8: LQ12-06001~           S5LQ1314E01
  First edition    October, 2006                                                                 K
                                    SK260LC–8 : LL12-05001~        (ASIA, OCE)
                                                                                n
       n            May, 2007                        n                                           K
                                                                   ASIA (HS Engine)
                                    E265B : LQ12-06001~                         n
       n             July, 2007                                                                  K
                                    E265BLC : LL12-05001~          (NHK Russia)
                                                                                n
       n                 n                           n                                           K
                                                                   (NHK Middle East)
                                                                                n
       n          September, 2007                    n                                           K
                                                                   NHK Russia (HS Engine)
                                                                                n
       n                 n                           n                                           K
                                                                   NHK Middle East (HS Engine)


                                                13-2

--- Page 11 ---
13. MAINTENANCE STANDARD AND TEST PROCEDURE

(3) Preparation
    1) Straight course more than 30m (108ft)
    2) Travel position in which the bottom of the bucket
       is lifted by about 30cm (1ft).                                                                           A
(4) Measurement                                                                                           20m (66ft)
    1) Measure the max. deviation distance of the cir-
       cular arc in the 20m (66ft) length, excluding the
                                                                                Fig. 13-15 Measuring method
       preliminary run of 3~5m (10~16ft).
    2) Operate the travel lever at the same time.                  Travel deviation                      Unit : mm (in) / 20m (66ft)
                                                                    Measuring                         Reference value
                                                                     position      Standard value       for remedy    Service limit
                                                                        A        240 (9.45) or less    480 (18.9)      720 (28.4)

13.5.3    PERFORMANCES OF PARKING BRAKE
(1) Purpose
    Confirm that the parking brake holds a stopped
    condition of the machine in a no-load travel position
    and on a 15 degree slope.
(2) Condition
    A slope with (Approx. 15 deg) gradient and a
    stopped condition in a no-load travel position
(3) Preparation
    Place an angle meter on the shoe plate and confirm
    that it makes an angle more than 15 degree.
    Hang a perpendicular in parallel with the guide
    frame rib on the track frame and put a mark (match-              Fig. 13-16 Parking brake operating position
    ing mark) on the shoe plate.
(4) Measurement
    Five minutes after the engine stops, measure the
    movement distance of the matching mark.


                                                                                                                       C
                                                                                   GUIDE FRAME
                                                                            Fig. 13-17 Method of measurement

                                                                   Parking brake                                Unit : mm(in)/5min
                                                                     Measuring                     Reference value
                                                                      position      Standard value   for remedy    Service limit
                                                                         C                0             1 (0.04)        2 (0.08)


                                                           13-13

--- Page 12 ---
13. MAINTENANCE STANDARD AND TEST PROCEDURE

(2) Adjustment of pump ("B" adjustment)
    Procedure
   1) The adjustment automatically shifts from engine to pump, the speed shifts
      from LOW idling to HIGH idling. And "MEMORY PUMP" is displayed. And the
      unloading proportional valve and pump proportional valve actuate, accordingly
      the loading of pump is increased.
      The "ENGINE SPEED", P1, P2 "PUMP PRESSURE" and P1, P2 pump "PRO-
      PO-VALVE" current (command value) are indicated.
   2) After detection of the engine rated speed, the adjustment of pump is automat-
                                                                                           FINISH PUMP
      ically completed. And "FINISH PUMP" is displayed.                                  ENGINE SPEED
                                                                                           2000rpm
      (Press the buzzer stop switch on gauge cluster while this display is appeared      PUMP PRESSURE
                                                                                           C-1 35.0M C-2   35.0M
                                                                                         PROPO-VALVE
      and the adjustment is completed. The unloading adjustment required later is          E-1 300mA E-2   300mA

      not performed, and default value is written.)

(3) Adjustment of unloading valve ("C" adjustment)
    Procedure
   1) The adjustment shifts from pump to unloading, and the unloading valve actu-
                                                                                         MEMORY UNLOAD
      ates, accordingly the pump pressure is detected. And "MEMORY UNLOAD" is            ENGINE SPEED
                                                                                           2000rpm
      displayed.                                                                         PUMP PRESSURE
                                                                                           C-1 2.0M C-2 2.0M
                                                                                         PROPO-VALVE
      The "ENGINE SPEED", P1, P2 "PUMP PRESSURE" and P1, P2 "PROPO-                        D-1 300mA D-2 300mA

      VALVE" voltage (command value) are indicated.

   2) When the unloading valve operates to the specified value, the adjustment of
      unloading proportional valve is automatically terminated. And "FINISH UN-
      LOAD" is displayed.
      The speed is shifted to the speed corresponding to acceleration potentiometer.
      The adjusting current value is indicated on the display of current of P1, P2 un-
      loading proportional valves. The adjusting range is usually 520~635mA.

      Stop the engine. (The adjusted data is automatically stored.)


(4) Corrective actions taken when the adjustment can not be performed;
   1) In cases where the adjustment of engine can not be performed; And ERROR
      ENG" is displayed.
      Judging condition: The read engine speed is 50rpm lower than the last value.

      It is conceived that the error is caused by the speed read error, pump load ap-
      plied to the engine and unusual acceleration command voltage applied to the
      engine controller in the course of adjustment.
      a. Checking speed sensor: Check that it is free from wrong reading of speed
         due to engine vibration.
      b. Checking load applied to pump: Check that it is free from abnormal in-
         crease of pump pressure during adjustment of engine through adjustment
         screen.
      c. Checking acceleration command voltage: Measure the acceleration com-
         mand voltage output from mechatro controller to engine controller. Check
         that signal is regularly input to the engine controller by actual measure-
         ment of voltage or with failure diagnosis tool of engine controller.


                                                      13-24

--- Page 13 ---
21. MECHATRO CONTROL SYSTEM

21.1.3     POSITIVE CONTROL & P-Q CONTROL


                                                                               BOOM UP CONFLUX


                                                                                                                        P1 UNLOAD


                                                                                                                                               TRAVEL RIGHT
                                                       ARM 1 SPEED


                                                                                                                                                                                 ARM 2 SPEED
                                                                                                 TRAVEL LEFT
                           N&B
                           SELECTOR


                                                                                                                                                                        BUCKET
                                              OPTION
                           VALVE


                                                                      SWING


                                                                                                                                                              BOOM
                                                                                                                           STRAIGHT
                                SOLENOID


                                                                               P2 UNLOAD


                                                                                                                           TRAVEL
                  OPTIONAL
                  PILOT VALVE
                                                                                                                           P2          P1


                                                                                                               SE-23                        SE-22


                  SE-11


  (LEFT)    (RIGHT)             PILOT       PILOT
                                VALVE       VALVE

    PILOT VALVE
    FOR TRAVEL


                            LOW      LOW
                            PRESSURE PRESSURE
SE-10      SE-9             SENSOR   SENSOR
                            SE-1~4         SE-5,7,8


                                                                     pi
                                                                                                    PILOT SIGNAL
                                                                                                    PROCESS                         P2 PUMP                          P2 PUMP
                                                                                                                                    PROPORTIONAL                     PROPORTIONAL
                                                                                                                                    VALVE COMMAND                    VALVE PSV-P2


                                                                          PILOT SECONDARY PRESSURE


                                                                     pi


                                                                      pi

                                                                                                                                    P1 PUMP                          P1 PUMP
                                                                                                                                    PROPORTIONAL                     PROPORTIONAL
                                                                                                    PILOT SIGNAL                    VALVE COMMAND                    VALVE PSV-P1
                                                                                                    PROCESS
                                                                          PILOT SECONDARY PRESSURE                                     MECHATRO
                                                                                                                                       CONTROLLER pi : PROPORTIONAL VALVE
                                                                                                                                                                     SECONDARY PRESSURE


                                                                              21-7

--- Page 14 ---
21. MECHATRO CONTROL SYSTEM

21.1.11      TRAVEL STRAIGHT CONTROL


                                                                                      BOOM UP CONFLUX


                                                                                                                         P1 UNLOAD


                                                                                                                                            TRAVEL RIGHT
                  OPTIONAL


                                                               ARM 1 SPEED


                                                                                                                                                                           ARM 2 SPEED
                                                                                                           TRAVEL LEFT
                  PILOT VALVE        N&B
                                     SELECTOR


                                                                                                                                                                  BUCKET
                                                      OPTION
                                     VALVE


                                                                             SWING


                                                                                                                                                           BOOM
                                                                                                                           STRAIGHT
                                                                                     P2 UNLOAD
                                           SOLENOID


                                                                                                                           TRAVEL
  (LEFT)    (RIGHT)             PILOT        PILOT
                                VALVE        VALVE                                                                        P2           P1
  PILOT VALVE
  FOR TRAVEL


                  SE-11         LOW
SE-10      SE-9
                                PRESSURE
                                SENSOR


                                               TRAVEL STRAIGHT SIGNAL


                                                                      pi
                                                                                                        PILOT SIGNAL     TRAVEL STRAIGHT
                                                                                                        PROCESS          PROPORTIONAL
                                                                                                                         VALVE PSV-C


                                                               PILOT SECONDARY PRESSURE
                                                                    pi
                                                                                                        PILOT SIGNAL
                                                                                                        PROCESS          P2 PUMP
                                                                                                                         PROPORTIONAL
                                                                                                                         VALVE PSV-P2


                                                               PILOT SECONDARY PRESSURE
                                                                 pi

View the complete manual on HeyDownloads →