PDF Repair Manual Manitou MHT Series Telehandler (OM 904 LA) - 1 MB

This is the official repair manual for the heavy-duty Manitou MHT series telehandlers, including models 7140, 10160, and 10210 equipped with the OM 904 LA engine.

The guide provides professional, step-by-step instructions for maintenance, troubleshooting, and major repairs.

It's an invaluable resource for keeping your powerful telehandler in peak operating condition.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
REPAIR MANUAL
MANUEL DE RÉPARATION
 REPARATURANLEITUNG
MANUAL DE REPARACIÓN
MANUALE RIPARAZIONE

  This document has been printed from my e doc


                MANITOU BF
         Head office: 430, Rue de l’Aubinière
             44150 Ancenis - FRANCE
          Share capital: 39,548,949 euros
             857 802 508 RCS Nantes
              Tel: +33 (0)2 40 09 10 11
                www.manitou.com

--- Page 4 ---
TRANSMISSION OPERATION (REGULATION)

--- Page 5 ---
MHT 7140-10160-10210L MS
                       Series                                                              3 EN


                             “DA” CONTROL CARTRIDGE
                                    OPERATION

The pilot pressure is drawn via the control cartridge slide valve into the booster circuit. At
maximum IC engine speed, the pilot pressure is a few bars lower than the booster pressure.

On idling (850 rpm) the booster flow which passes through the calibrated opening in the
control cartridge slide valve is sufficient to create a drop in pressure capable of displacing
the slide valve 1 against the force of the spring 2. The pilot pressure is therefore nil.

When the operator accelerates in order to move forward (to approximately 1050 rpm), the
booster flow increases; the drop in pressure before the calibrated opening is now sufficient
to move the slide valve to the left, against the spring, thus revealing the pilot opening.

When the pilot pressure reaches approximately 6 to 7 bar, the servocontrol cylinder begins
to move, tilting the plate of the variable capacity pump. The pump begins to discharge (start
of control). The greater the engine speed, the more the booster flow increases thus increas-
es thus leading to a rise in the pilot pressure and therefore increased influence on the pump
and greater machine speed.

To halt this process, the operator stops accelerating, the booster flow drops, the pressure
drop is reduced and the spring 2 pushes back the slide valve 1 thus closing the booster
passage to the pilot conduit. The residual pilot pressure is discharged towrads the housing.


                                                                                                 11

--- Page 6 ---
MHT 7140-10160-10210L MS
                       Series                                                           3 EN


3B    CHECK AND ADJUST END OF REGULATION:


                                              End of regulation
CHECK:

- The truck is supported on blocks, inching valve by passed, brakes applied (foot and park).
- Drive reverser in forward drive.
- Select forward drive.
- Engine at low idle-check rpm.
- Gradually increase the engine speed (1600÷1800rpm) until the forward HP reading is 465
  bar. At this point check engine speed and compare with specifications.

END OF REGULATION:
The adjustment of the pump end of regulation is obtained using an eccentric screw which
restricts the pump flow creating back pressure against the swash plate.


                This adjustment can only be set using a test bench.
 It cannot be modified in any way without prior authorization from the manufacturer.


  The slot in the eccentric screw should point towards the boost pump(opposite to
 A4VG pump where slot pointed to drive shaft). The adjustment must not go beyond
              90 to the left or right-Do not exceed or damage may occur.
As for the HP adjustment, this adjustment has to be done with the DR valve overcali-
                                          brated.


                                                                                          21

--- Page 8 ---
AS 372 KR
                                                                        1

1.2 - Identification data

Exact reference to the "Model", the "Serial number"
and the "Year of Manufacture" of the axle is required
when requests for assistance under guarantee are
needed or when spare parts are ordered.

These data are written in the plate (fig.1.2), located
as shown in fig.1.3. Always refer to the axle data
whenever you contact the after-sales service.
This will enable immediate replies, while eliminating
the risk of misunderstanding and uncertainties in
                                                             Fig. 1.2
the solution of your problem.

As memorandum we suggest to write down all the
axle data.

1.3 - Packing and movement


1.3.1 - Packing

Before delivery the axle is accurately inspected.
Except for special request or particualr shipment as
naval transport, the axle is shipped without packing.

1.3.2 - Movement

Axle lifting and transport must be done using suitable
means. The axle type AS 372 KR weighs about
1450 kg.
                                                             Fig. 1.3


                   CAUTION !!!

  Lift the axle with appropriate means and check
  the stability. For safety move the axle and its
  components keeping the load as low as possible.
  If you use a lift truck the forks must be in the
  widest position and positioned in the center of
  axle. Nobody must be near the axle during
  handling.


                                                         7

--- Page 9 ---
3


3 - MAINTENANCE

  3.1 - Foreword

  3.2 - Tests conducted by the Manufacturer

  3.3 - Routine inspections

  3.4 - Checking and changing of the oil

  3.5 - Recommended oils

  3.6 - Recommended greases

  3.7 - Greasing points

--- Page 10 ---
5


5 - CLEANING AND INSPECTIONS

  5.1 - Cleaning

  5.2 - Bearings

  5.3 - Brake disks

  5.4 - Seals, oil retaining rings and thrust washer

  5.5 - Gears

  5.6 - Assemblies

  5.7 - Use of thread-locking adhesive (Loctite®) and
          paste seals (silicone)

--- Page 12 ---
AS 372 KR
                                                                            6

6.10 - Assembly of the wheel hub gear

- Check that the three planet gears pos.4 fig.6.20
  are perfectly clean. Spread their central holes
  with a film of hard grease. Use grease type FINA
  MARSON EPL 3, NLGI:3 degree.
- Position the needles pos.3 inside the gears pos.4
  so that it's fully filled, placing a spacer ring pos.6
  between each row of needles.
- Position the two external thrust washers pos.5 and
  insert the planet gear into the spider, carefully
  centering the plug hole. For this purpose use tool
  OMCI No.2 of chapter 7.
- Having perfectly centered the planet gear, remove
  the centering tool and mount pin shaft pos.2, taking
  care to position it so that the milling points towards
  the circlip pos.1.                                            Fig. 6.20
- Mount the remaining planetary gears in the same
  way.
- Having correctly installed the three planet gears
  and relative pins, position the circlip pos.1 and
  check if it’s correctly installed.
- Apply a continuos thread of silicone to the coupling
  surface between the wheel hub and the planet
  spider.
- Mount the axle shaft, inserting it into the central
  hole of the spindle. Keep it pushed downwards in
  order to lift the other hand and slightly turn it to
  center the teeth of the grooved profile. The axle
  shaft has to enter the hole smoothly and without
  resistance. If not the case, demount the axle shaft
  and check for any dents on the grooved profile.
- Apply a drop of Loctite 262 onto the screws pos.1
  fig.6.21 and tighten them to specified torque (see
                                                                Fig. 6.21
  chapter 7).
- Fill with oil every part that needs it and lubricate
  the greasing points. See chapter 3 for further
  information.
  For quality and quantity see paragraphs 3.5 and
  3.6.

6.11 - Assembly of the brake cylinders

For assembly and installation of the brake cylinders
see the manual O.M.C.I. cod.031027 CCD.372110.


                                                           37

--- Page 13 ---
RDE 92500-02-R/03.01

Schnittbild           Reparaturanleitung A11VO
Sectional view         Repair Instructions A11VO


A11VO...LRDS


                            LR


                 S


                 D


                            LR


                     Brueninghaus Hydromatik   3

--- Page 14 ---
RDE 92500-02-R/03.01

Anschlußplatte, Regler demontieren                                     Reparaturanleitung A11VO
Remove port plate, regulator                                            Repair Instructions A11VO


                                     Reglergehäuse abbauen.
                                     Bei Regler mit Meßfeder z.B. DRL, EP, LRDH -
                                     zuerst Steuerbuchse mit Meßfeder ausbauen,
                                     dann Reglergehäuse abbauen.

                                     Remove regulator housing.
                                     For control with measuring spring for instance: DRL, EP,
                                     LRDH - at first remove control bush with measuring spring,
                                     than remove regulator housing.


                                     O-Ringe, Meßkolben mit Büchse und
                                     Feder ausbauen.

                                     Remove O-ring, measuring piston
                                     with bush and spring.


                                     Ausführung mit Impeller!
                                     Zuerst Impeller ausbauen.


                                     Design with impeller!
                                     At first remove impeller.


                                     Lage der Anschlußplatte markieren.
                                     Anschlußplattenbefestigung lösen.

                                     Mark position of the connection plate.
                                     Loosen connection plate fixation.


                                                                   Brueninghaus Hydromatik     13

--- Page 15 ---
RDE 92500-02-R/03.01

Überprüfungshinweise                                                         Reparaturanleitung A11VO
Inspection hints                                                              Repair Instructions A11VO


                                         Kontrolle!
                                         Kugelköpfe
                                         Geschliffene Seite zur Wiege einbauen!


                                         Inspection!
                                         Fixing segments

                                         Assemble the grinded side to the cradle!


                                         Kontrolle!
                                         Rückstellkolben (*)
                                         Abstimmumg über Rückstellstange.

 Rückstellkolben                         Inspection!
 ohne Qmin-Stop                          Piston (*)
                                         Adjustment ..
                       Rückstellkolben
                       mit Qmin-Stop


                                         Kontrolle!
                                         Stellkolben (1),
                            2      1     Bohrung - Stellbüchse (2).

                                         Inspection!
                   1                     Positioning piston (1),
                                         Boring - control bush (2).


                                         Kontrolle!
                                         Bohrung (*),
                                         Auflagefläche - Steuerplatte (1).

                                         Inspection!
                                         Boring (*),
                                         Contact area control plate (1).


                                                                           Brueninghaus Hydromatik   23

--- Page 16 ---
RDE 92500-02-R/03.01

Prüfanweisung A11VO 40 - 130 LRDS                                                       Reparaturanleitung A11VO
Test instruction A11VO 40 - 130 LRDS                                                     Repair Instructions A11VO


 1.       Vorbereiten Funktionsprüfung                            1.   Preparation for functional testing

 1.1 Leistungsdiagramm anfordern                                  1.1 Requisition of power curve diagram
 1.2 Einbauen, befestigen und Gehäuse füllen                      1.2 Install, fix and fill the housing
 1.3 Drehrichtung festlegen                                       1.3 Check the direction of rotation

 Anschlüsse / ports
 A11VO 40 ... 130 LRDS
                                                                                 M:  Meßstelle, Arbeitsanschluß /
                                                                                     Test ports, pressure port
                                                                                 M1: Meßstelle, Stellkammer /
                                                                                     Test port
                                                                                 LR: Leistungsregler /
                                                                                     HP-control
                                                                                 DR: Druckabschneidung /
                                                                                     Pressure cut-off
                                                                                 X: Anschluß für ∆P-Regler /
                                                                                     Port for ∆P-control
                                                                                 G: Anschluß für Stelldruck /
                                                                                     Port for positioning pressure
                                                                                 S: Load-Sensing-regler /
                                                                                     Load-sensing control


 A11VO 40 ... 130 LRDH
                                                                                 M:   Meßstelle, Arbeitsanschluß
                       Y                                                              Test point, pressure port
      D                                                                          M1: Meßstelle, Stellkammer
                                               LR                                     Test point, adjustment
 H2/6                                                                                 chamber
                                                                                 G: Anschluß für Stelldruck
                                                                                      Port for adjustment pressure
                                                                                 LR: Leistungdregler
                                                                                      HP-control
                                                                                 D: Druckabschneidung
                                                                                      Pressure cut-off
                                                                                 H2/6: Hydraulische Hubbe-
                                         M G                               M1          grenzung Vg min - Vg max
             Qmin - stop                            Qmax - stop                        Hydraulic stroke limiter


 2.       Einstellvorgang

 2.1 Auf Prüftemperatur fahren                             2.     Setting process
 2.2 Antriebsdrehzahl
 2.3 Qmin- Anschlag ausschrauben                           2.1 Drive to temperature
                                                           2.2 Input speed
                                                           2.3 Screw-out Qmin- stop


                                                                                      Brueninghaus Hydromatik   33

--- Page 17 ---
RDE 92500-02-R/03.01

Prüfanweisung A11VO 40 - 130 LRDS / LRDH                                                         Reparaturanleitung A11VO
Test instruction A11VO 40 - 130 LRDS / LRDH                                                       Repair Instructions A11VO


      D

 2.13 Einstellen Druckregler                                           2.13 Setting of constant pressure

 2.14 Mit Belastungsventil Druckregler nach                            2.14 Setting with help of the charge valve
      Leistungsdiagramm einstellen.                                         the constant pressure control as to
                                                                            HP diagram.


      Beispiel 4
      Druckreglereinstellung = 310 bar
                                              p[bar]
                                                       400
      Betriebsdruck mit Belastungsventil
      auf ~ 350 bar erhöhen.
      Blockierten Druckregler vorsichtig
                                                       310
      herausdrehen bis 310 bar erreicht                300
      wird.
      Einstellschraube kontern.

                                                       200
      Example 4
      Setting of constant pressure
      control = 310 bar
      Increase operation pressure with                 100
      help of charge valve ~ to 350 bar.
      Unscrew carefully blocked                        ppr

      constant pressure control up                                                       Q = 343 l/min
                                                                                         bei ppr = 50 bar
      to 310 bar.
                                                             0   100            200            300
      Jam setting screw.                                                                             Q[l/min]


                                                                                            Brueninghaus Hydromatik          43

--- Page 18 ---
I30     9 Stop pressure switch                   M7     15 Front windscreen washer pump         R36     14 4 inputs and 4 outputs circuit
    I31    11 Back-up lights switch                  M8     15 Rear wiper motor                     S1      20 1200 rpm solenoid valve
    I32    21 Emergency pump switch                  M9     13 Rear aeration solenoid valve         S2       8 Forward movement solenoid valve
    I33    17 Manoeuvres manipulator                 M10    13 Air conditioner compressor           S3       8 Reverse solenoid valve
    I34    10 Levelling switch                       M11    13 Cab aeration fan motor               S4      10 LH levelling solenoid valve
    I38    11 Air filter pressure switch             M13    21 Pneumatic seat                       S5       9 Anti-tilting solenoid valve
    IP      6 Ceiling light switch                   M14    15 Top wiper motor                      S6      10 RH levelling solenoid valve
    L1     11 Battery optical indicator              P3      7 Identification plate light           S7       9 Fast movement solenoid valve
    L2     11 Turn indicators optical indicator      P17     6 Cab light                            S8       9 Slow movement solenoid valve
    L3     11 Position lights optical indicator      PPA    10 Provision for front axle alignment   S9       5 Differential block solenoid valve
    L4     11 High beam lights optical indicator               proximity switch                     S10     17 Boom extension solenoid valve
    L5     11 Low beam lights optical indicator      PPP    10 Provision for rear axle alignment    S11     17 Boom retract solenoid valve
    L6     11 Air filter clogged optical indicator             proximity switch                     S12     18 Optional 1 solenoid valve
    L7     11 Oil pressure optical indicator         R1a     4 Start-up enable relay                S13     18 Optional 2 solenoid valve
    L8     11 Oil level optical indicator            R1b    19 Work lights power supply relay       S14     15 Crab steering solenoid valve
    L9     11 Water temperature optical indica-      R2b    19 Forward movement relay               S15     15 Concentric steering solenoid
                                                                                                                                                   MHT 7140-10160-10210 L MSeries


              tor                                    R3a     8 Reverse relay                        S16     17 Optional double solenoid valve
    L10    11 Control unit fault optical indicator   R4a     4 Machine locked with key power        S19     21 Mixer bucket solenoid valve
    L11    11 Parking brake optical indicator                  supply relay                         S20     17 Optional triple solenoid valve
    L12    11 Brakes oil level optical indicator     R4b     4 Machine locked with key power        ST1     12 Hour meter and rev counter
    L13     9 Slow speed optical indicator                     supply relay                         ST2     12 Water temperature instrument
    L14     9 Fast speed optical indicator           R5a     7 Low beam lights relay                ST3     12 Fuel level instrument
    L15    15 Crab steering optical indicator        R5b    14 Oil cooling fan relay                ST4      9 Anti-tilting control unit
    L16    15 Concentric steering optical indica-    R6a     7 High beam lights relay               ST5      9 Load cell
              tor                                    R6b    14 Oil cooling fan relay                ST6      9 Load cell
    L17    17 Boom top second outlet optical         R7a    11 Parking optical indicator relay      ST7      9 Anti-tilting control unit
              indicator                              R7b    14 Oil cooling fan relay                T1      19 Float
    L18    17 Control unit fault indicator           R8a    20 1200 rpm solenoid valve relay        TR      21 Thermo-starter
    L19    18 Control unit fault indicator           R8b    10 Levelling relay                      X2      16 Mercedes adm control unit
    L20     9 Anti-tilting exclusion optical indi-   R9a     9 Anti-tilting relay                   X17     16 Diagnostics connector
              cator                                  R9b     5 Differential block relay             X21/A   17 RC2-2/20 Rexroth 1st control unit
    L20b    9 Anti-tilting exclusion optical indi-   R10a    6 Relay intermittence relay            X21/B   18 RC2-2/20 Rexroth 2nd control unit
              cator                                  R10b    5 Horn relay                           X30     16 Mercedes motor control unit
    L21    17 Boom top 3rd outlet optical indica-    R11b    5 Buzzer and reversal lights relay     X31     16 Accelerator pedal connector
              tor                                    R12a    5 Brake lights relay                   X35     20 Antitheft connector
    L22    15 Normal steering optical indicator      R12b   14 Oil cooling relay                    X36     20 Car radio connector
    M1      4 Starter motor                          R13     6 Intermittence                        X61     21 Basket connector
    M2     14 Hydraulic oil cooling fan              R14a   21 Air heater relay
    M3     14 Hydraulic oil cooling fan              R16b    8 Starter motor relay
    M4     14 Hydraulic oil cooling fan              R33     9 Slow-fast bistatic relay


5
    M5     14 Hydraulic oil cooling fan              R34    17 Optional double relay
                                                                                                                                                   4


    M6     15 Front wiper motor                      R35    17 Boom top outputs set-reset relay

--- Page 19 ---
MHT 7140-10160-10210 L MSeries


     MHT 990-7140-10160 M SERIES DISTRIBUTORE REXROTH (09-2003) / MHT 990-7140-10160 M SERIES DISTRIBUTOR REXROTH (09-2003)   TAVOLA
     Denominazione
                                                                                                                               TABLE
                                  MANIP. LIVELLAMENTO E LAMPADA ROTANTE


15
     Name:                             LEVELLING AND WORKING LAMP                                                              10
                                                                                                                                       4

--- Page 20 ---
MHT 7140-10160-10210 L MSeries


     MHT 990-7140-10160 M SERIES DISTRIBUTORE REXROTH (09-2003) / MHT 990-7140-10160 M SERIES DISTRIBUTOR REXROTH (09-2003)   TAVOLA
     Denominazione
                                                                                                                               TABLE
                                                    ANTIFURTO, AUTORADIO


25
     Name:                                            ANTI-THIEFT, RADIO                                                       20
                                                                                                                                       4

View the complete manual on HeyDownloads →