PDF Operating Instructions Cat Bucyrus RH 120E Hydraulic Excavator - 2 MB

This manual contains the official operating instructions for the Cat Bucyrus RH 120E Hydraulic Excavator.

It is designed to help operators understand the machine's controls, systems, and safety features.

Adherence to these instructions ensures efficient and safe operation in demanding mining environments.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram βœ‰Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
OPERATING INSTRUCTIONS RH 120E


                             Hydraulic Excavator
                             RH 120E            No.
                             Bucyrus HEX GmbH


BA RH120E(3 663 730.00)-EN

--- Page 3 ---
OPERATING INSTRUCTIONS RH 120 E
Introduction


1 INTRODUCTION
                                                                                        2804051


                   Operating instructions                    Target group

Part 1 INTRODUCTION                         Operating personnel
                                                  +
           FUNDAMENTAL                      Inspection and
                                            servicing personnel
           SAFETY INSTRUCTIONS                    +
                                            Repair personnel
Part 2 OPERATION                            Operating personnel
                                            The operating personnel must have know-
                                            how relevant to the operation and the appli-
                                            cation of this or comparable machines.

Part 3 INSPECTION AND                       Inspection and servicing personnel

           SERVICING                        The inspection and servicing personnel must
                                            have know-how relevant to the inspection
                                            and servicing of this or comparable ma-
                                            chines.

Part 4 REPAIR WORK                          Repair personnel
                                            The repair personnel must have know-how
                                            and experience relevant to the repair of this
                                            or comparable machines.

Part 5 ANNEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel
Part 6 INDEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel


BA RH120E(3 663 730.00)-EN                                                                  1-1

--- Page 4 ---
OPERATING INSTRUCTIONS RH 120 E
Introduction


Gas, dust, steam and smoke                           Noise
Always start and operate the engine in a well-       During operation, all sound baffles of the machine
vented area;                                         must be closed.

If in an enclosed area, vent the exhaust to the      Always wear the prescribed ear protectors.
outside;
                                                     Oil, grease and other chemical
Do not modify or tamper with the exhaust system
                                                     substances
Diesel engine exhaust and some of its constitu-
ents are known to cause cancer, birth defects, and   When handling oil, grease or other chemical sub-
other reproductive harm                              stances, observe the product-related safety regu-
                                                     lations (see safety specifications).
Operate fuel-operated heating systems only on
adequately ventilated premises. Before starting      Be careful when handling hot consumables (risk of
the machine on enclosed premises, make sure          burning or scalding).
that there is sufficient ventilation.
                                                     Transporting and recommission-
Observe the regulations in force at the respective
site.                                                ing
Carry out welding, flame-cutting and grinding work   The machine must be loaded and transported only
on the machine only if this has been expressly       in accordance with the operating instructions.
authorized, as there may be a risk of explosion
and fire.                                            Use only appropriate means of transport and lifting
                                                     gear of adequate capacity.
Before carrying out welding, flame-cutting and
grinding operations, clean the machine and its       The recommisioning procedure must be strictly in
surroundings from dust and other inflammable         accordance with the operating instructions.
substances and make sure that the premises are
adequately ventilated (risk of explosion).

Hydraulic equipment
Check all lines, hoses and screwed connections
regularly for leaks and obvious damage. Repair
damage immediately. Splashed oil may cause
injury and fire.

Depressurize all system sections and pressure
pipes (hydraulic system) to be removed in accor-
dance with the specific instructions for the unit
concerned before carrying out any repair work.

Hydraulic lines must be laid and fitted properly.
Ensure that no connections are interchanged. The
fittings, lengths and quality of the hoses must
comply with the technical requirements.


BA RH120E(3 663 730.00)-EN                                                                         1-11

--- Page 5 ---
OPERATING INSTRUCTIONS RH 120 E
Operation


Excavator layout                                35 – Fire-extinguisher
                                                36 – Control cabinet with battery main switch
Fig. 2-1:
                                                37 - Batteries
Undercarriage                                   38 - Service-station, (tanklift)
1 - Track drive                                 39 - Ladder
2 – Idler                                       40 - Ladder
3 - Track roller                                41 - Grease container for central lubrica
4 - support roller                                   ting system
5 - Crawler track                               42 - Tool cabinet (optional)
6 - Track tensioner                             43 - Counterweight
7 - Slewing ring                                44 - On-board crane (optional)
8 - Ladder                                      45 - Drive unit (onboard crane, optional)
                                                Loading bucket
Superstructure
                                                51 – Boom
10 - Engine
                                                52 - TriPower linkage
11 - Radiator (engine cooling liquid)
                                                53 – Stick
11 - Reservoir (cooling liquid)
                                                54 - Bottom-dump bucket
13 - Air-intake system
                                                55 - Boom cylinder
14 - Exhaust system
                                                56 - Stick cylinder
15 - Fuel tank
                                                57 - Tipping cylinder
16 - Hydraulic oil reservoir
                                                58 - Bottom-dump cylinder
17 - Hydraulic oil cooler
                                                64 - Control valves
18 - Engine oil reservoir (optional)
                                                65 - Quick-action valve
19 - Pump transfer gearbox
20 - Working pump                               Backhoe bucket
21 - Cooling oil pump                           53 - Stick
22 - Servo system pump 35 bars                  55 - Boom cylinder
23 - Servo system pump 60 bars                  56 - Stick cylinder
24 - Gearbox circulating pump                   59 - Monoblock boom
25 - Slewing pump                               60 - Backhoe bucket
26 - Fan drive pump (cooler, hydraulic oil)     61 - Backhoe cylinder
27 - Fan drive pump (radiator, engine cooling   62 - Toggle link
    liquid)                                     63 - Toggle lever
28 - Air compressor drive (air conditioning     64 - Control valves
    system)                                     65 - Quick-action valve
29 – Slewing gear
30 – Travel block and rotor
31 – Driver`cab
32 – Control stand with BCS
33 – Control cabinet
34 – Air conditioner (optional)


BA RH120E(3 663 730.00)-EN                                                                      2-7

--- Page 6 ---
OPERATING INSTRUCTIONS RH 120 E
 Operation


Fire extinguisher                                       Extinguishing agent

The excavator is equipped with two fire extin-          Each fire-extinguisher is filled with 12 kg Glutex.
guishers (arrow Fig. 2-19:)                             This extinguishing agent is used for fighting fires
                                                        of classes A, B and C. Fires are extinguished fast,
                                                        perfectly and without residues.

                                                        Handling


Fig. 2-19:

The excavator driver and the maintenance per-
sonnel must informthemselves about how to han-
dle the fire-extinguisher in order to be able to act
                                                        Fig. 2-21:
fast and efficiently in case of beginning fires. Such
instruction should be given by a qualified instruc-     " Pull out securing pin (2, Fig. 2-21:).
tor.
                                                        " Strike knob (3) hard, then release again.
Fire extinguisher (option)                              " Operate the extinguishing gun.
The fire extinguishers can be installed, for in-
stance, at the places indicated by the arrows (Fig.     Inspection
2-20:).
                                                        Have the extinguisher inspected at regular inter-
The excavator driver and the maintenance per-           vals by an expert. This is required by local authori-
sonnel must inform themselves about how to han-         ties and insurance companies and is in the inter-
dle the fire-extinguisher in order to be able to act    est of your own safety.
fast and efficiently in case of beginning fires. Such
instruction should be given by a qualified instruc-                  Have the fire-extinguisher checked
tor.                                                                 at the prescribed intervals by
                                                                     authorized testing agencies


Fig. 2-20:


BA RH120E(3 663 730.00)-EN                                                                              2-17

--- Page 7 ---
OPERATING INSTRUCTIONS RH 120 E
Operation

Fig. 2-28:

No.    Element                             Function                                          Symbol

  41   Warning lamp     CELECT warning     Lamp is lit up in the event of an Celect fault.
                        (left engine 1)    The lamp moreover indicates the fault code.
                                           Contact Terex Germany after-sales ser-
                                           vice or engine manufacturer.
                                           (see switches 55 and 57)

  42   Warning lamp     CELECT warning     Lamp is lit up in the event of an Celect fault.
                        (left engine 1)    The lamp moreover indicates the fault code.
                                           Shut off the engine
                                           Stop working
                                           Contact Terex Germany after-sales ser-
                                           vice or engine manufacturer.
                                           (see switches 55 and 57)

  43   Warning lamp     CELECT warning     Lamp is lit up (e.g.):
                        (left engine 1)    - when the engine oil pressure is too low
                                           - when the cooling water temperature is too
                                             high
                                           Shut off the engine

  44   Warning lamp     CELECT warning     Lamp is lit up in the event of an Celect fault.
                        (right engine 2)   The lamp moreover indicates the fault code.
                                           Contact Terex Germany after-sales ser-
                                           vice or engine manufacturer.
                                           (see switches 65 and 67)

  45   Warning lamp     CELECT warning     Lamp is lit up in the event of an Celect fault.
                        (right engine 2)   The lamp moreover indicates the fault code.
                                           Shut off the engine
                                           Stop working
                                           Contact Terex Germany after-sales ser-
                                           vice or engine manufacturer.
                                           (see switches 65 and 67)

  46   Warning lamp     CELECT warning     Lamp is lit up (e.g.):
                        (right engine 2)   - when the engine oil pressure is too low
                                           - when the cooling water temperature is too
                                             high
                                           Shut off the engine

  47   Indicator lamp   Boom/stick angle   Lamp is lit up when the boom/stick angle is
                        (optional)         in normal working range.

  48   Indicator lamp   Boom/stick angle   Lamp is lit up when the boom/stick angle is
                        (optional)         in hazard range.
                                           (the tracks may be demaged by the working
                                           equipment)
                                           Increase the angle.
                                           The buzzer (34) sounds until the angle has
                                           resumed the normal working range.


BA RH120E(3 663 730.00)-EN                                                                       2-27

--- Page 8 ---
OPERATING INSTRUCTIONS RH 120 E
Operation

Fig. 2-33:

No.   Element                                  Function                                       Symbol

 91   Switch           Emergency Operati- Lowers the boom and stick when actuated in
                       on Boom/Stick      an emergency.

 92   Button           Counting dumper         RESET

 93   Switch           Stick        cylinder
                       switch-off    bypass
                       (optional)

 94   Switch           Fuel     pre-heating Switches on the the pre-heating system for
                       (optional)           the fuel

 95   Switch           Lighting                Switches on the lighting for servicing work.


 96   Switch           Lighting                Switches the cab lighting on and off.


 97   Switch           Windscreen   wiper Activates permanent wiping
                       rear window (optio-
                       nal)

 98   Switch           Beacon (optional)       Switches the beacon on and off.


BA RH120E(3 663 730.00)-EN                                                                        2-37

--- Page 9 ---
OPERATING INSTRUCTIONS RH 120 E
Operation

Fig. 2-38: (optional)


No.   Element                                    Function                                         Symbol

165 Warning lamp        Slewing motor         1 Lights up when the slewing motor is conta-
                        contaminated            minated with metal particles.

166 Warning lamp        Slewing motor         2 Lights up when the slewing motor is conta-
                        contaminated            minated with metal particles.

167 Warning lamp                                 free for optional

168 Warning lamp        Hydraulic oil filter Lights up when the flow resistance in the
                        contaminated         filter is too high. Replace filter elements if the
                                             warning lamp fails to go out when the oil is at
                                             operating temperature.

169 Warning lamp        Min. hydraulic       oil Lights up when the hydraulic oil level in the
                        level                    hydraulic tank is too low.

170 Warning lamp        Electronic excavator Lights up when the electronic excavator con-
                        control ON           trol is switched on.

171 Indicator light     Hydraulic oil tank       Lights up when one of the shut-off valves of
                                                 the hydraulic oil tank is closed
                                                          When the left valve is closed, the
                                                          LH engine cannot be started.

                                                          When the right valve is closed,
                                                          the RH engine cannot be started.

                                                          When the center valve is closed
                                                          none of the two engines can be
                                                          started.

                                                          When a shutoff valve is closed
                                                          with the engines running, the re-
                                                          spective engine or both engines
                                                          are stopped.

172 Thermometer         Hydraulic oil            Indicates hydraulic oil temperature in hydrau-
                                                 lic tank

181 Control unit        Air conditioner
                        (optional)

182 Control unit        Heating (optional)


BA RH120E(3 663 730.00)-EN                                                                            2-47

--- Page 10 ---
OPERATING INSTRUCTIONS RH 120 E
 Operation


 Assemblies resp.    Measuring device               Remarks
 reservoirs
 Cooling system      Level indicator (4, Fig. 2-53:) Stop filling when the level indicator indicates maximum
 reservoir                                           filling level. (cf. chapter "Cooling system - Cooling li-
                                                     quid").

 Grease container – BCS display (Fig. 2-54:)        Stop filling when the BCS indicates β€žβ€œgrease container is
 cental lubricating                                 fullβ€œ.
 system                                             Switch on the display system (optional) with the toggle
                                                    switch (33, Fig. 2-55:).
                                                    Stop filling when the grease container is full.
                                                    The indicator lamp (34) lights up.
                                                    On completion of filling, switch the display system off
                                                    again with the toggle switch (33).


Fig. 2-53:
                                                          Fig. 2-55:


Fig. 2-54:


BA RH120E(3 663 730.00)-EN                                                                                2-57

--- Page 11 ---
OPERATING INSTRUCTIONS RH 120 E
 Operation


TRAVELLING                                               Travelling forwards/backwards
                                               2804916
                                                         Travelling forwards:
Superstructure basic position
                                                         depress pedals (112 and 113) forwards.
Travel direction and sense of actuation of pedals
(112 and 113, Fig. 2-73:) are identical only when        The excavator travels in the direction of the idler
the excavator is in its BASIC POSITION (Fig.             (2, Fig. 2-72:).
2-72:).
                                                         Travelling backwards:

                                                         depress pedals (112 and 113, Fig. 2-73:) back-
                                                         wards.

                                                         The excavator travels in the direction of the drive
                                                         sprocket (4,Fig. 2-72:).


Fig. 2-72:

             If the superstructure is slewed out
             of its basic position by more than
             90Β° (Fig. 2-74:), the excavator mo-
             ves in a direction opposite to that
             expected when pedals (112 and
             113, Fig. 2-73:) are depressed.             Fig. 2-74:

                                                         The pedals return automatically to their "0" positi-
                                                         ons when released.

                                                         Reverse the excavator only over short distances
                                                         and with the assistance of marshallers because of
                                                         restricted rear-view conditions.

                                                         Do not travel across slopes.

                                                                      When travelling uphill or downhill,
                                                                      the travel drive must always be at
                                                                      the rear. Travel only in the basic
                                                                      position of the excavator and only
                                                                      forwards.
Fig. 2-73:                                                            Be extremely careful on slippery
                                                                      and greasy ground.
If the operator is not completely sure of the positi-
on of the superstructure with regard to the under-
carriage, pedals (112 and 113) should be de-
                                                         All instructions with regard to travelling speed re-
pressed slightly in order to find out which way the
                                                         gulation and travel direction control are applicable
excavator moves before initiating the full travelling
                                                         only as long as the crawler tracks have sufficient
movement.
                                                         grip and do not slip.


BA RH120E(3 663 730.00)-EN                                                                                  2-67

--- Page 12 ---
OPERATING INSTRUCTIONS RH 120 E
 Operation


WORKING OPERATION                                          Slewing and braking the super-
                                                 2804917   structure
Before starting work                                       The superstructure can only be slewed if the su-
                                                           perstructure holding brake is released.

                                                           To slew the superstructure to the right:
                                                           shift control lever (115) to the right.
             Prior to initial commissioning and
             after repairs on the central lubrica-         To slew the superstructure to the left:
             ting system or the hydraulic cylin-           shift control lever (115) to the left.
             ders, move the unloaded equip-
             ment for abt. 5 minutes.                      After releasing, the control lever returns automati-
                                                           cally to position "0".

This is required to ensure an adequate supply of           Braking the superstructure
grease to the cylinder bearings when the work
starts.                                                    The superstructure is braked only by setting con-
                                                           trol lever (115) into the opposite direction (counte-
Warming up                                                 ring).

At low outside temperatures it is necessary to run                      In an emergency apply parking
the hydraulic system up to operating temperature.                       brake with switch (82, Fig. 2-92:)
The temperatures at which warming up is neces-
sary depend on the type of hydraulic oil used; cf.
also "Oils for hydraulic systems".

To warm up the system: Run the diesel engines at
ca. 2/3 full speed and start to perform no-load
working movements for abt. 10 minutes with the
excavator.


Fig. 2-91:                                                 Fig. 2-92:

Switching on the electronic excavator
control
The electronic excavator control is switched on
and off with switch (105, Fig. 2-91:).

Electronic excavator control activated - operator is
sitting on his seat.

Electronic excavator control deactivated - driver's
seat is empty.


BA RH120E(3 663 730.00)-EN                                                                                   2-77

--- Page 13 ---
OPERATING INSTRUCTIONS RH 120 E
Inspection and servicing


3 INSPECTION AND SERVICING


                                                                                     2804053

                   Operating instructions                    Target group

Part 1 INTRODUCTION                         Operating personnel
                                                  +
           FUNDAMENTAL                      Inspection and
                                            servicing personnel
           SAFETY INSTRUCTIONS                    +
                                            Repair personnel
Part 2 OPERATION                            Operating personnel
                                            The operating personnel must have know-
                                            how relevant to the operation and the appli-
                                            cation of this or comparable machines.


Part 3 INSPECTION AND                       Inspection and servicing personnel

           SERVICING                        The inspection and servicing personnel must
                                            have know-how relevant to the inspection
                                            and servicing of this or comparable ma-
                                            chines.


Part 4 REPAIR WORK                          Repair personnel
                                            The repair personnel must have know-how
                                            and experience relevant to the repair of this
                                            or comparable machines.

Part 5 ANNEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel
Part 6 INDEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel


BA RH120E(3 663 730.00)-EN                                                                  3-1

--- Page 14 ---
OPERATING INSTRUCTIONS RH 120 E
Inspection and servicing


INSPECTION AND SERVICING                               indicates. Replace the filter elements after one
                                                       year at the latest.
PLANS - INSTRUCTIONS
                                                       Oils / Greases
                                                       For the specification of oils and greases to be
Intervals                                              used refer to the "Lubricants" section.
The inspection and Servicing plan lists all jobs
                                                       The numerals mentioned in the "Oil / Grease"
which have to be done on the machine at regular
                                                       column in the inspection and sServicing plans
intervals.
                                                       have the following meaning:
The individual inspection and Servicing plans are
marked with letters providing a link between the           I     Oils for combustion engines and com-
operating hours (OH) recorded by the hours-run                   pressors
meter of the machine and the inspection and                II    Oils for hydraulic systems
sServicing plans.
                                                          III    Oils for gearboxes
                                                           V     Greases for bearings and slewing
                                                                 rings
    Plan    Do all jobs ....
      V     ...once prior to initial commissioning.
      N     ...after initial commissioning and du-     Cleaning jobs
               ring the running-in period.
                                                       Cleaning jobs, especially on cooling systems,
      T     ...every 10 OH or every working shift 1)   must be done at shorter intervals if the machine is
                                       2               exposed to severe dust build-up.
      W     ...every 60 OH or weekly .
      A     ...after every 250 OH.
                                                       Components
      B     ...after every 500 OH.
      C     ...after every 1000 OH.                    The maintenance intervals for components, e.g.
                                                       engine and gearbox, are listed in the following
      D     ...after every 5000 OH.                    Terex Germany maintenance schedules.
      E     ...after every 10000 OH.
                                                       It is possible that the manufacturer's documentati-
OH = Bh = Operating hours                              on for these components states intervals deviating
                                                       from the above-mentioned intervals.

Change of engine oil l                                 In such case, only the maintenance intervals
                                                       specified by Terex Germany shall apply.
The intervals stated for changing the engine oil
apply to fuels with a sulphur content of ≀ 0.5% and
a permanent ambient temperature down to –10Β°
C.

In case of higher sulphur content and/or a perma-
nent ambient temperature of below –10Β° C, shor-
ter intervals are required.

If the engine oil change intervals are not reached
within 6 months, the oil must be changed at least
after 6 months.

Air-intake system
The air filter must be serviced only if the BCS so


2
    Whichever comes first.


BA RH120E(3 663 730.00)-EN                                                                           3-11

--- Page 16 ---
OPERATING INSTRUCTIONS RH 120 E
Inspection and servicing

Plan A - after every 250 OH                                     Plan B - after every 500 OH
(at 250, 750, 1250 ... OH)                                      (at 500, 1500, 2500 ... OH)
Plan C - after every 1000 OH                                    Plan D - after every 5000 OH
(at 1000, 2000, 3000, 4000 ... OH)                              (at 5000, 15000, 25000 ... OH)
Plan E - after every 10000 OH
(at 10000, 20000, 30000, ... OH)
                                                                                                      Page 3 von 8

Location                               Servicing work                     Menge /    Plan Plan Plan Plan Plan
                                                                            No.       A    B    C    D    E
Engine with centrifuge and             Carry out oil analysis                2        #    #    #    #    #
engine oil reservoir (optio-
nal)
                                                                                 7
                                       Change oil                            2                #   #    #     #
                                       Clean                                                      #    #     #
- Bearing
  - Fastening screws                   Check tightness                                            #    #     #
  - Rubber bearing                     Check condition                                            #    #     #
Oil filter                             Replace                             2x2        #       #   #    #     #
                                                                              7
Engine oil reservoir                   Change oil                           2                 #   #    #     #
                                       Clean                                                      #    #     #
V-belt                                 Check tension                                  #       #   #    #     #
                                       Check condition                                #       #   #    #     #
Centrifuge                             Clean                               2x1                #   #    #     #
- Rotor seal                           Replace                             2x1                    #    #     #
- Casing seal                          Check /replace                      2x1                    #    #     #
Inspection and servicing               (cf. Operating and mainte-           2         #       #   #    #     #
                                       nance manual for engine)


7
    cf. β€œRefilling quantities – Oilβ€œ table


BA RH120E(3 663 730.00)-EN                                                                                   3-21

--- Page 17 ---
OPERATING INSTRUCTIONS RH 120 E
Inspection and servicing


Lubricating chart – Grease / Backhoe bucket (legend)


 No. Greasing point                                       Number            Lubricant         Grease every
                                                                            properties   .... operating hours
     1    Central lubricating system – grease container     1                      18            10
                                                                                 V
     3    Ramp-type ladder (optional)                                            V 18
          - Deflecting roller                               3                                   1000
          - Locking bolt                                    1                    I 18           1000

View the complete manual on HeyDownloads β†’