PDF Installation Instructions Manual CNH CX350C CX380C Excavator Valve Kit - 2 MB

This manual provides detailed installation instructions for the CNH multi-purpose plus three-way valve kit on CX350C and CX380C crawler excavators.

It offers clear, step-by-step guidance to ensure the kit is fitted correctly and safely.

The instructions are provided in multiple languages for wide accessibility.

Proper installation is critical for the correct function of your excavator's hydraulic attachments.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
INSTALLATION INSTRUCTIONS


               KG0SP871-00
MULTI-PURPOSE PLUS THREE-WAY VALVE KIT


APPROXIMATE INSTALLATION TIME: 32.0 hours


                                                   San - 47906052
                                            Issue date August 2015
                                                                EN

--- Page 3 ---
3 - ASSEMBLY


3 - ASSEMBLY
MULTI-PURPOSE PLUS THREE-WAY VALVE KIT

Boom line installation


                                                   SMIL15CEX9808FB   1


Line Assemblies (6) (7)
1. Set the line assembly (left) (7) on the boom.


                                                                         SMIL15CEXXX28AB    2


                                                          3-1
                                                                                           EN

--- Page 4 ---
3 - ASSEMBLY


9. Install the elbow (8) on the hydraulic oil reservoir (*5) re-
   turn and oil cooler line (*6), then connect the hydraulic
   hose (9).


                                                                      SMIL15CEXXX40BB   11

10. Install the elbow (12) on the three-direction valve (15)
    B port.
11. Set the O-ring (7) on the elbow (12) and connect the
    hydraulic hose (13).


                                                                      SMIL15CEXXX41BB   12


                                                             3-11
                                                                                        EN

--- Page 5 ---
3 - ASSEMBLY


12. Install the hose adapter (1) on the remote control valve
    (*2) B port.


                                                                  SMIL15CEXXX57AB   11

13. Install the stud (27) on the control valve (*3) pa2 port
    and connect the elbow (4).
    (A): left side of the vehicle
14. Connect the assembly hose (14) (Y1) to the remote
    control valve (*2) B port and control valve (*3) pa2
    port.


                                                                  SMIL15CEXXX58BB   12

15. Install the elbow (4) on the remote control valve (*2)
    C1 port.


                                                                  SMIL15CEXXX59AB   13


                                                         3-21
                                                                                    EN

--- Page 6 ---
3 - ASSEMBLY


Port relief valve installation
1. Remove the plug, and then install the 2 port relief
   valves (1) on the control valve (*1).
   (A): left side of the vehicle
   Tightening torque: 78.4 - 88.3 N·m (57.8 - 65.1 lb ft)
2. After installing the port relief valves (1) , adjust the relief
   pressure to match the end attachment used.(See the
   Service Manual.)


                                                                        SMIL15CEXXX74AB    1


                                                               3-31
                                                                                          EN

--- Page 7 ---
内容

1 套件所含物品
 套件所含物品. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1


2 预装配
  准备装配
       准备. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1


3 装配
  多功能增强版三通阀套件
              安装臂杆管路. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
              安装上部主管路 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6
              安装保养阀(远程控制阀) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15
              先导管路安装. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17
              线束安装. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-28
              安装端口卸压阀 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-31
              安装储箱指示器传感器(过滤器堵塞警告) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-32
              地板垫的额外处理 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-34
              粘贴驾驶室内的铭牌 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-35


                                                                                                                                                                                  ZH

--- Page 8 ---
3 - 装配


2. 用两个管道夹具 (3) 在两个位置夹住管路总成(右)
   (6),然后用两颗 sems 螺栓 (*1) 在每个位置进行紧固。
  • 从 管 路 总 成 ( 右 ) (6) 的 末 端 在 位 置 382 mm
    (15.039 in) 紧固管道夹具 (3)。


                                               SMIL15CEX9814AB    7

3. 将两个塞子 (8) 安装到管路总成(左) (6) 上。


                                               SMIL15CEX9815AB    8

4. 用两个管道夹具 (2) 夹住管路总成(右) (6),然后用
   两颗 sems 螺栓 (*2) 进行紧固。 从管路总成(左) (7)
   的末端在位置 300 mm (11.811 in) 紧固管道夹具 (2)。


                                               SMIL15CEX9816AB    9


                                        3-3
                                                                 ZH

--- Page 9 ---
3 - 装配


15. 在控制阀 (*3) P4 端口上单向阀 (32)。
16. 将 O 形密封圈 (34) 固定在单向阀 (32) 上,并连接液
    压软管 (33)。
    拧紧扭矩: 157 - 193 N·m (115.8 - 142.3 lb ft)
17. 在控制阀 (*3) P3 端口上安装专用套筒 (31),并连接
    弯管 (30)。
18. 将 O 形密封圈 (34) 固定在弯管 (30) 上,并连接液压
    软管 (33)
    。拧紧扭矩: 157 - 193 N·m (115.8 - 142.3 lb ft)


                                                   SMIL15CEXXX44BB   15

19. 在关断阀 (26) T 端口上安装软管接头 (14)。
20. 在 3 向阀 (15) T2 端口上安装软管接头 (14)。
21. 将关断阀 (26) T 端口和三向阀 (15) T2 端口与液压软
    管 (18) 连接。


                                                   SMIL15CEXXX45BB   16


                                            3-13
                                                                     ZH

--- Page 10 ---
3 - 装配


21. 将电磁阀 (17) B1 端口和歧管 (*4) P5 端口与装配软
    管 (7) (P5) 连接。


                                            SMIL15CEXXX64AB   18

22. 在电磁阀 (17) A2 端口上安装软管接头 (1)。
    (A):车辆左侧


                                            SMIL15CEXXX65AB   19

23. 在控制阀 (*3) pcc 端口上安装长弯管 (13)。
    (A):车辆左侧
24. 将电磁阀 (17) A2 端口和控制阀 (*3) pcc 端口与装配
    软管 (7) (Y5) 连接。


                                            SMIL15CEXXX66BB   20


                                    3-23
                                                              ZH

View the complete manual on HeyDownloads →