PDF Workshop Manual Yale ERC ERP 15 18 18X TCE - 2 MB

This workshop manual is the complete service and repair guide for Yale ERC/ERP 15, 18, and 18X TCE series electric forklifts.

It contains detailed instructions for diagnostics, repair, and maintenance procedures.

Professional technicians will find this manual essential for performing accurate and efficient service, ensuring the forklifts remain productive and safe.

It covers all aspects of the truck's systems.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
Publication Number
                                                                 258725124


Workshop Manual


ERC/ERP 15/18/18X TCE
(ERWERP 030/035/040TCE)


Yale Materials Handling Limited
Flagship House
Reading Road North
Fleet, Hampshire GU13 8HR
United Kingdom
Tel: 0044 1252 770777
Fax: 0044 1252 770780


Copies of this and other publications for this range of lift trucks are available.
For details contact Your Local Dealer

--- Page 3 ---
4.5   OVERHAUL                                             5.5.   BRUSH HOLDERS & COMMUTATOR END
                                                                     BRACKETS
   4.5.1 ELECTRIC MOTOR PRECAUTIONS
                                                                     Check the insulation resistance between the
   1.    ALWAYS disconnect the battery at the connector              brush holders and the commutator end bracket,
         before commencing work on the truck. DO NOT                 using a 100 volt insulation tester. Minimum
         pull the cables attached to the connectors.                 acceptable value 1 megaohm.

   2.    ALWAYS refer to the applicable procedures when       5.6.   BRUSH SPRINGS
         undertaking maintenance and overhaul
         operations.                                                 Check the brush spring force. It will be necessary
                                                                     to remove the motors from the installed position
   3.    NEVER guess or assume polarity or connections               on the truck to check all brushes on each of the
         of the truck wiring. NEVER use 'trial and error'            three motors. However, it is possible to arrive at
         techniques.                                                 a satisfactory conclusion through sample testing
                                                                     of the accessible brushes without removal of the
   4.    ALWAYS refer to the truck wiring diagram (See               motors as visual confirmation is possible through
         Electrical Section).                                        comparison with the readings obtained as above.
                                                                     Renew the springs if the force is below the value
   5.    MOTOR MAINTENANCE                                           stated in the SPECIFICATIONS. (See Fig. 1).

   5.1   CLEANING                                                    I                            7
         Remove loose dust using a regulated supply of
         clean compressed air. Degrease components
         using a suitable solvent applied with a lint free
         cloth or soft bristle brush. Allow the components
         to dry before inspection.

   5.2   ARMATURE

   (a)   Examine the armature core for indications of local
         overheating (caused by shorted circuits) and
         signs of chafing against the field windings
         (indicating armature shaft distortion or excessive
         wearing of bearings).

   (b)   Inspect the commutator for scoring, pitting,
         wearing of the brush track and thrown solder.
         Excessive pitting or blackening indicates a
         winding defect.

   5.3   FIELD WINDINGS
                                                                     I
         Inspect the windings for indications of chafing or
         damaged insulation (Indicates a distorted                                       Fig.1.
         armature or worn bearings). Renew if defective.
                                                              5.7.   BRUSHES     - RENEWAL (Motor Removed From
   N0TE:lf required, the field windings can be given an              Truck)
        extra coating of insulating varnish. Red glycol
        can be used if a class H polyurethane varnish is             TO REMOVE
        not available. Ensure the varnish does not
        contact the brush gear, pole shoe faces and end       1.     Clean the motor externally, using a lint free cloth
        head sets.                                                   dampened in a cleaning solvent (Yale Part No
                                                                     296318300).
   5.4   BEARINGS
                                                              2.     Remove the brush gear cover to gain access to
         Examine the armature bearings for excessive                 the brushes.
         wear, pitting, discolouration and rough running.
         Renew if defective.                                  3.     Remove the screws securing the brush leads.
                                                                     Lift the brush springs and withdraw the brushes
                                                                     from their holders.


B. 02

--- Page 4 ---
NOTE: Excessive deformation during the above                NOTE: In the case of Transmission 'V" (different tyres)
              procedure can lead to the needle bearing inner              washer (4) must also be put into position.
              ring becoming deformed.
                                                                           Assemble them together using the washer,
         (e)   Using tool "K" press on the inner ring of the               threaded bolt and hexagon bolt from tool "L"
               tapered roller bearing (See Figure 7.ltem 5).               adjust until the bearing play 0.
                                                                                                        I


                                                                           Pre-stress bearing to 500 Nm.
                                                                           Using a torque spanner pre-stress the gear shaft
                                                                           and the satellite carrier with the aid of tool "L".

                                                                           TIGHTENING TORQUE 10 Nm 10%      -
                                                                           Rotate the gear shaft in both directions several
                                                        .-
                   / / I       \ \                                         times, ca. 10 to 20 revolutions, so that the rollers
                  00000                                                    of the tapered roller bearing become aligned.

                                                                           Check that the tightening torque is still 10 Nm + 1-
                                                                           10%.
         6.4.2.2 PRE-ASSEMBLE GEAR SHAFT (See Fig.8.)                       Determine shim thickness "X".
               Smear the edges of the 5 wheel studs (10) witt              Place the dial indicator gauge on the end face of
               Loctite 242 and press them into the gear shaf               the satellite carrier and set to "0".
               flange.
                                                                            Unscrew tool "L" and remove.
               Push the nilos ring (9) up the stop position on the
               shaft.                                                       Position the required thickness "X" of shims (2).
               Using tool "K" press on the inner ring of the                Smear the pinch bolt with Loctite 242 and put it in
               tapered roller bearing.                                      position using tool "N".
               Coat the hollow spaces on the bearing inner ring             TIGHTENINGTORQUE MA P 80 Nm
               between the rollers and the cage with grease. Do
               the same to the sealing edge of the nilos ring.
               Use Shell Alvania R3.

               REMARK:

               Other grease of the same specification may also
               be used.

         6.4.2.3 PRE-ASSEMBLE BEARING HOUSING (See
                Fig.8.)

         (a)   Smear the outside diameter of the shaft oil seal
               (6) with Loctite 574 and using too0 "F" plate it in
               the correct position i.e. the open side of the ring
               facing towards the transmission.

         (b)   Place both outer rings of tapered roller bearings
               (5 and 7)in the housing.

         (c)   Smear the seating faces of the gamma ring (8)
               with Loctite 242 and press it onto the bearing
               housing.

         6.4.2.4 ASSEMBLE GEAR SHAFT AND SATELLITE
                           -
                CARRIER PRE-STRESSBEARING (See Fig.8.)

         (a)   Place the pre-assembled gear shaft into the                                    Fig.8.
               bearing housing.

         (b)   Place the pre-assembled satellite carrier (3) onto
               the gear shaft.


C. 0 8

--- Page 5 ---
(d)       Install steer axle assembly into truck frame           4.7   INTERUPTOR WELDMENT AND WHEEL
          (Installation is the reversal of removal                     DETECTION BOARD - INSTALLATION
          procedure).
                                                                       For seauence of assemblv see fia.2.
                                                                                                        I


NOTE: Ensure that correct torque is applied to flange
     bolts.                                                            SETTING PROCEDURE

NOTE: Grease nipple must be aligned in a horizontal              (a)   Turn steer wheel to straight ahead position.
     plane with reference to truck centre line.
                                                                 (b)   Install interruptor and wheel detection board,
          Tightening torque   86 Nm 63 Ibs ft                          ensure interruptor cam plate is central to steer
                                                                       tyre, and that the detection board is perfectly
(e)       INSTALL TRAIL WHEEL                                          flat.

NOTE: Ensure that correct torque is applied to wheel             NOTE: Torque securing bolt should operate steer wheel
     bolts.                                                           from LH/RH locks, and in each position, check
                                                                      that the optical interruptor switches are blanked
          Tightening torque   140 Nm 103 Ibs ft                       off.

(f)       TORQUE ARM WELDMENT                                    (c)    Install main interface board.

          Install drive key and torque arm.                      NOTE: Before connecting the interface plugs (three in
                                                                      number) and after subsequent disconnection, the
NOTE: Ensure that correct torque is applied to slotted                pins must be sprayed with electrolube 2 GAX
     nut, back off to nearest split pin hole.                         contact treatment grease, Yale Part No
                                                                      258345000.
          Tightening torque   68 Nm 50 Ibs ft Max.
                                                                 (d)   Connect battery and check interruptor switches
(9)       INSTALLATIONOF BELLCRANK                                     for correct operation.

          Shim to achieve a clean entry into interlink.          (e)    install remaining covers.

NOTE: Tighten nyloc locknut sufficiently to remove any
     vertical movement in bellcrank.

(h)       INSTALLATION OF INTERLINK

NOTE: Tighten nyloc locknut sufficiently to remove any
     vertical movement.

4.6       POWER STEER ROD END - INSTALLATION

NOTE: Torque nyloc locknut to 210 Nm 155 Ibs ft.

4.6.1 SETTING PROCEDURE FOR STEERING
      ANGLES

(a)       Turn steer wh,eel to full lock position. Power steer
          cylinder will be in closed position.

(b)       Adjust piston rod end to obtain a dimension of 74
          mm. See Fig 3.


      I                                                   I
                               Fig.3.


                                                                                                                          E. 03

--- Page 6 ---
1.   ELECTRICAL SYSTEM

            The truck power source is a 36 volt lead acid traction battery, this provides power for
            the drive, hoist and power steer functions.

       2.   TRACTION SYSTEM

            The truck is driven by two reversible electric motors driving independent
            transmission units. The motors are controlled by a General Electric EV100 Traction
            ControIler.

            The controller provides smooth speed control combined with electrical plug braking.

       2.1 THE MAJOR COMPONENTS OF THE SYSTEM

       1.   GE-EV100 Power unit and logic PCB.
       2.   Sevcon Accelerator unit.
       3.   Yale Interface printed circuit board.
       4.   Yale Steer angle detection Board.
       5.   Direction, Bypass and plugging equalisation Contacts.

       2.1.1 EV100 CONTROLLER

            The EV100 controller contains all the power components for the for the pulse
            control system and the fail safe system.

       2.1.2 ACCELERATOR UNIT

            The Sevcon accelerator unit is of a sealed construction and no maintenance is
            required.

       2.1.3 INTERFACE PCB

            THE interface PCB containis all switching devices for the direction power steer by
            pass and armature cross contacts. Stabilized supply devices. Relays for the key
            switch pulse reduction and handbrake. Warning buzzer, also connected by a
            ribbon type cable is the steer angle detection PCB.

       2.1.4 STEER ANGLE DETECTION PCB

            The steer angle detection board contains 4 infa red OPT0 interruptors set at 60
            degrees and 90 degrees to detect steer wheel angle. The detection board is
            mounted above the steer axle, mounted on the steer axle is a steel cam plate which
            interrupts the infa red lighlt, when the steer angle attains 60 degrees. This is
            detected by the interface board and turns off one drive motor, when the steering is
            turned to full lock, Le. 90 degrees this reverses the previously stopped motor. At 60
            degrees of lock the by-pass contactor is inhibited to prevent full speed operation at
            90 degrees by-pass is inhibited and the pulse is reduced. The switching of the
            motors gives a differential effect when the truck is being steered between 60
            degrees and 90 degrees, when the truck is being steered between 0 degrees - 60
            degrees by-pass is enabled and pulse reduction is inhibited to give full speed. The
            control is operative on right and left hand steer locks and in forward and reverse
            direction.


G.02

--- Page 7 ---
COMPONENT LOCATION

         POWER UNIT
         CONTACTOR PANEL
         INTERFACE PCB


G.12

--- Page 8 ---
PEPLACEMENT OF EV-100 CO MPONENTS

       When replacing stud semiconductors such as 3REC and 4REC it is not
       necessary to torque these devices to a specific value.

           The use of a heat-transfer grease (part number 295359000) is
           recommended.

       When replacing module semiconductors such as 1REC, 2REC or 5REC

            (1) Remove all module connections. (As required).
            (2)Remove module by backing out the two screws at the top device
               sides.
           (3) Clean the insulator surface with a clean rag and isopropyl alcohol.
           (4) Inspect the insulator surface for tears or cracks. If defective,
               replace. Wipe a light layer of machine oil on the base and smooth
               the insulator into position.
           NOTE: Insulator not required for 2REC and SREC.
           (5) Coat insulator with a light coat of heat-transfer grease.
           (6) Set new module on insulator and start screws back into base. Be
               sure to use the original screws and washers. Run screws into
               base "finger tight".
               Check that the bottom of the module is flat against the insulator or
               base.
               Alternately tighten the two screws by 1/4 turn until firm.
           (7) Replace all conniections removed in step 1.
       Capacitor

           (1)     Remove nuts from capacitor connections and remove wires.
           (2)     Remove hold down brackets and lift out.
           (3)     Reverse procedure to replace capacitor.
       22REC, 23REC and 25REC

           (1)     Remove mounting screws and lift out.

           NOTE: When replacing these devices, use the original hardware in the
           same holes, as the inserts are used for electrical connections.

       Reactor/Choke

           (1)     Disconnect all leads to the reactor.
           (2)     Remove the two mounting bolts and lift out.
           (3)     Set new reactor on SCR base and start screws back into base. Be
                   sure to use the original screws and washers, run screws into base
                   "f inger t ight '.

                   Check that the bottom of the reactor is flat against the base.
                   Alternately tighten the two screws by 114 turn until firm.
           (4)     Replace all connections removed in step 1.


G.22

--- Page 10 ---
1                                                        I   REPLACE INTERFACE
                                                                                     LOGIG PCB.

                                       TEST METER REGISTER

                                                                              CHECK FOR BATTERY VOLTAGE
                                                                              AT THE FOLLOWING'TERMINALS
                                                      YES
                                                                              1 CONTACTOR K6 BYPASS.
                                    SELECT A DIRECTION, DEPRESS               2 SWITCH S4 SEATSWITCH
                                 THE ACCELERATOR. CHECK VOLTAGE
                                 AT TERMINIALS TB5 OR TB6 (SEE NOTE 1
                                                                              3 TB 3 EVlOO LOGIC CARD.          .-1
                                                                              4 OUTPUT FROM PIN X4R.                  I


                                                 I                            5 PIN 8 SPEED CONTROL UNIT.             I
                                                                                                                      I
                                                                              6 PIN 7 SPEED CONTROL UNIT.
                                                 II
                                                                                                                      I

                                  I
                I
                                                                              7 INPUTTO TB 2 EV100 LOGIC.             I
    NOTE.                                                                                                             I

    WHEN CHECKING VOLTAGE                                                 I                                           I
                                                                                                                      I
    AT TERMINALS TB4 OR TB6                                                                                           I
    VOLTAGE WILL ONLY BE                                                                                              I
    PRESENTON THE SELECTED                            REPLACE INTERFACE              VOLTAGES                         I
                                                                                                                      I
    CONTACTOR THE NON SELECTED
    WILL REGISTER ZERO VOLTS.
                                                                                                                      I
                                                                              CHECK INPUT VOLTAGES AT                 I
                                                                              THE FOLLOWING TERMINAL                  I
                                                                    NO                                                I
                                                                              1 X4/5ORX4/7
                                         BATERY VOLTS AT                       CHECK OUTPUT VOLTAGE
                                                                              TO TB PLUG FROM TERMINALS               I
                                                                              X4l4 OR X4l6.                           I
                                                                                                                      I


                                                                                                                      I
                                      CHECK VOLTAGE AT POSITIVE               IF NO VOLTAGES ARE PRESENT              I
                                                                              AT X4l4 OR X4/6 REPLACE M E
                                      TERMINAL OF ALL DIRECTION
                                                                              INTERFACE LOGIC PCB.                    I
                                      CONTACTOR COILS.                                                                I
                                                                                                                      I


                                           /
                                                 I                                                                    I
                                                                                                                      I

                                                                   NO                                                 I
                                                                                                                      I
                                                                              CHECK SWITHES AND WIRING                I
                                                                                         I
                                                                                                                      I


                                                                          I REPEAT THE ABOVE CHECKS. I - -
                                                 I

                                   1 CHECK IDIRECTDN CONTACTOR 1
                                   II
                                                                                                                      1


                                      COILS FOR CORRECT OHMIC
                                      VALUE


                                                                          1                                 1
                                                            NO
                                                                                 REPLACE FAULTY COILS
               I                              150 OHMS


   NOTE THE DIRECTION                 SET TEST METER ON DC VOLTS
    CONTACTOR COILS ARE               SCALE, CONNECTTEST METER
    POLARITY SENSITIVE AND            ATTERMINAL X3R (INTERFACE
    MUST BE CHECKED IN BOTH           LOGIC CARD.)
   DIRECTIONS. A READING OF
   32 OHMS SHOULD BE READ
   IN 1 DIRECTION AND 150 OHMS
   IN THE OPPOSING DIRECTION.
   TESTS TO BE CARRIED OUT
   WITH AN ANALOGUE METER.


G. 32

--- Page 11 ---
-
        FAULT FUNDING SPLIT VOLTAGE


G. 42

--- Page 12 ---
I                                   I
             CONTACTORS DO NOT ALTENATE
             FOR SLOW SPEED OPERATION.
             FULL SPEED OPERATION.


                          I
        CHECK OUTPUT VOLTAGE AT TERMINALS
        X5/4 &X5/5 WHILE OPERATING THE HOIST
        LEVER ( LEVER TO BE OPERATED ALTERNATLY)


                        DOES
                 VOLTAGE ALTENATE
               ON TERMINALS X514 & X5/5            REPLACE HOIST / TILT PCB.
                WHEN THE HOIST LEVER
                    IS OPERATED


G. 52

--- Page 13 ---
SECTION H

HYDRAULIC SYSTEM                                                                          PAGE


1.Description ..........................................................................         01

2.Specifications .....................................................................           01

3. Maintenance .......................................................................           01
3.1     Daily Inspection .....................................................................   01
3.2     Every 50 Hours or 1 Week ........................................................        01
3.3     Every 2000 Hours or 12 Months.................................................           01

4.0verhaul and Maintenance..............................................                         02
4.1   Hydraulic System Precautions ..................................................         02
4.2   Hoist Pump Assembly .Remove and Install ...............................               ..O 2.
4.3   Hydraulic Oil Tank ..................................................................   02
4.4   Control Valve - Remove and Install .............................................        02
4.5   Tilt Cylinder - Remove and Install...............................................        03
4.6   Tilt Cylinder - Overhaul ............................................................ 03
4.7 . Tilt Speed Setting...................................................................    04

5.Fault Diagnosis .Hoist System .......................................                          05

6 Fault Diagnosis .Tilt System ...........................................                       06

--- Page 14 ---
SECTION I


MAST CONNECTING PARTS                                                                     PAGE


1.Description ..........................................................................          01

2.Specifications .....................................................................            01

3.Maintenance .......................................................................             01
3.1      Daily Inspection ..................................................................      01
3.2      Weekly lnpsection ..............................................................         01

4.0ve rhauI ..............................................................................01

5.Mast Assembly ....................................................................01
5.1      Precautions ........................................................................     01
5.2      Removal.............................................................................     01
5.3      Installation..........................................................................   01

6.Forks .....................................................................................02

7.Load Backrest ....................................................................              03

--- Page 15 ---
I


    2     With m,aster key switch OFF depress and release     4.    MAINTENANCE.
          accelerator pedal several times and check for
          freedom of movement and full travel.                4.1   DAILY INSPECTION

    3     Operate parking brake and ensure that braking       1.    Inspect the truck for evidence of damage,
          power is available.                                       fracture, wear or leaks.Rectify as necessary.

    4     With master key swithc ON check the following       4.2   EVERY 200 HOURS OR 1 MONTH
          for correct functioning:-
                                                              1.    Inspect all attaching and fixing parts for security.
          a) Direction control lever.
                                                              2.    Thoroughly wash or steam clean the truck.
          b) Hoist control lever.
                                                              4.3   EVERY 1000 HOURS OR 6 MONTHS
          c)Tilt control lever.
                                                                    Visually inspect all load structures such as mast
          d)Third function control lever - if attachment is         channels, fork carriage, overhead guard, frame
          fitted.                                                   weld joints etc., for cracks, fractures or damage.

          e) Horn button.                                     WARNING: DO NOTOPEPRATE THE TRUCK WITH ANY
                                                                   CRACKED, FRACTURED OR DAMAGED
          1) Check footbrake and parking brake.                    STRUCTURES.

          g) On completion of checks switch master key        5.    OVERHAUL
          switch OFF and apply parkihg brake.
                                                              5.1   OVERHEAD CANOPY GUARD - REMOVE AND                       .

    2.4   HYDRAULIC OIL TANK                                        INSTALL (FIG 2.)

    1     When a low level is indicated on the dipstick,            TO REMOVE:
          examine the truck for evidence of oil leakage.
          Report any defects to appropriate authority         1.    Attach suitable overhead lifting equipment to the
          before topping up the tank with clean hydraulic           overhead canopy guard. Tension the lifitng
          fluid.                                                    equipment to take up the chain slack.

    2.5   TYRES                                               2.    Remove two bolts securing the canopy guard to
                                                                    the front of the truck frame.
    1     Inspect the tyres for wear and damge. Remove
          stones, swarf, etc. from tyre tread.                3.    Unscrew and remove two bolts and washers
                                                                    securing canopy guard to the counterweight.
    2     Check tyre pressures (ERP only):
                                                              4.    Raise the canopy guard from the truck and lower
          9.5 bar on all models 138 Ibs ft in sq                    onto a level working surface.

          WARNING: INFLATE TYRES TO CORRECT
          PRESSURES TO MAINTAIN TRUCK STABILITY.
          ALWAYS USE A SAFETY CAGE OR
          RESTRAINING DEVICE WHEN INFLATING
          TYRES F l l T E D TO WHEELS WITH SPLIT
          RIMS.BEFORE INFLATING THE WRES ALWAYS
          ENSURE THE RETAINER RINGS ARE
          CORRECTLY SEATED.

    3.    SPECIFICATIONS

          COUNTERWEIGHTS

          TRUCK MODEL             WEIGHT

          ERCP 030 TCE            695 Kg
          ERCP 035 TCE            695 Kg

          TIGHTENING TORQUES

          Counterweight Bolts = 405 Nm I 3 0 0 Ibs ft
          Overhead Guard Bolts:-
          Front Legs = 135 Nm I 100 Ibs ft
          Rear Legs = 470 Nm I350 Ibs ft
                                                                                       Fig.2.


                                                                                                                           J. 03

--- Page 16 ---
at base of cylinder.                   valve if defective.

              5.     Worn hoist cylinder seals.       5.    Renew seals.

              6.     Defective pump.                  6.    Renew pump.

              7.     Incorrect hoist control          7.    Adjust or renew valve as
                     valve spool setting.                   necessary.

              8.     Electrical fault.                8.    Refer to electrical section.
                                                      (a)   Check flip-flop module
                                                            operation.
                                                      (b)   Check fast lift switch on
                                                            control valve.


        5.3   FAULT HOIST CYLINDER WILL NOT LOWER OR LOWERS SLOWLY

              Possible cause:                         Remedy:

              1.     Lack of lubrication.             1.    Check mast channels,
                                                            lubricate as necessary.

              2.     Defective control valve.         2.    Check and renew, if
                                                            necessary, valve in hoist
                                                            cylinder inlet connection.

              3.     Restriction in hose to           3.    Check and clear hoses, as
                     hoist cylinder.                        necessary.

              4.     Rollers defective or             4.    Check and renew or adjust
                     incorrect clearances.                  the rollers as necessary.
              5.     Defective hoist cylinder         5.    Renew cylinder seals or
                     seals.                                 cy Iinde r .

        6.    FAULT DIAGNOSIS -Tilt System
        6.1   FAULT TILT CYLINDER WILL NOT OPERATE IN EITHER DIRECTION

              Possible cause:                         Remedy:

              1.     Battery discharged.              1.    Check and recharge battery.
              2.     Hydraulic fluid                  2.    Check fluid level in tank
                     starvation.                            and/or check for fluid leaks.
              3.     Incorrectly adjusted             3.    Adjust stops.
                     tilt spool stops.

              4.     Defective relief valve            4.   Check relief valve, renew as
                     in control valve.                      necessary.
              5.     Worn or damaged                   5.   Renew defective parts.
                     control levers.
              6.     Restrictions in hoses to          6.   Check and clear hoses.
                     tilt cylinders.
              7.     Defective pump motor.             7.   Check: Contactors,
                                                            continuity of control harness

View the complete manual on HeyDownloads →