PDF Workshop Manual Hitachi ZX670LC-5G Hydraulic Excavator - 4 MB
This in-depth workshop manual provides complete service and repair information for the Hitachi ZX670LC-5G Hydraulic Excavator.
It is packed with detailed instructions, specifications, and schematics for every system.
Technicians will find this manual indispensable for diagnostics, disassembly, and reassembly procedures.
Ensure your excavator is maintained to the highest standards with this professional guide.
PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
PDF viewer loading area
Text Preview from This Manual
The text below was extracted from the visible preview pages to help you confirm the manual contents before download.
--- Page 1 ---
PART NO. WJBF90-EN-00
ZX670-5G
HYDRAULIC EXCAVATOR
Workshop Manual
WORKSHOP MANUAL
ZX670LC-5G
Hydraulic Excavator
URL:http://www.hitachi-c-m.com
WJBF90-EN-00
Service Manual consists of the following separate Part No.
Technical Manual (Operational Principle) : Vol. No.TOJBF90-EN
Technical Manual (Troubleshooting) : Vol. No.TTJBF90-EN
PRINTED IN JAPAN (K) 2013, 04 Workshop Manual : Vol. No.WJBF90-EN
--- Page 3 ---
SAFETY
General Precautions for Cab
Before entering the cab, thoroughly remove all dirt and/or
oil such as mud, grease, soil or stones that may mess up
the cab from the soles of your work boots. If any controls
such as a pedal is operated while with dirt and/or oil on
the soles of the operator’s work boots, the operator’s foot
may slip off the pedal, possibly resulting in a personal
accident.
Do not mess up around the operator's seat with parts,
tools, soil, stones, obstacles that may fold up or turn
over, cans or lunch box. The levers or pedals become
inoperable if obstacle jams in operation stroke of the
travel levers/pedals, pilot control shut-off lever or control
levers, which may result in serious injury or death.
Avoid storing transparent bottles in the cab. Do not
attach any transparent type window decorations on
the windowpanes as they may focus sunlight, possibly
starting a fire.
Refrain from listening to the radio, or using music
headphones or mobile telephones in the cab while
operating the machine.
Keep all flammable objects and/or explosives away from
the machine.
After using the ashtray, always cover it to extinguish the
match and/or tobacco.
Do not leave cigarette lighters in the cab. When the
temperature in the cab increases, the lighter may
explode.
Use proper floor mat dedicated to the machine. If another
floor mat is used, it may be displaced and contact with
the travel pedals during operation, resulting in serious
injury or death.
SA-5
--- Page 4 ---
SAFETY
Avoid swinging the upperstructure on slopes. Never
attempt to swing the upperstructure downhill. The
machine may tip over. If swinging uphill is unavoidable,
carefully operate the upperstructure and boom at slow
speed.
If the engine stalls on a slope, immediately lower the
bucket to the ground. Return the control levers to neutral.
Then, restart the engine.
Be sure to thoroughly warm up the machine before
ascending steep slopes. If hydraulic oil has not warmed
up sufficiently, sufficient performance may not be Travel Motor
obtained.
Use a signal person when moving, swinging or operating M104-05-008
the machine in congested areas. Coordinate hand signals
before starting the machine.
Before moving machine, determine which way to move
travel pedals/levers for the direction you want to go.
When the travel motors are in the rear, pushing down
on the front of the travel pedals or pushing the levers
forward moves the machine forward, towards the idlers.
An arrow-mark seal is stuck on the inside surface of the
side frame to indicate the machine front direction.
Select a travel route that is as flat as possible. Steer the
Arrow -mark
machine as straight as possible, making small gradual
changes in direction. M178-03-001
Before traveling on them, check the strengths of bridges
and road shoulders, and reinforce if necessary.
Use wood plates in order not to damage the road surface.
Be careful of steering when operating on asphalt roads in
summer.
When crossing train tracks, use wood plates in order not
to damage them.
Do not make contact with electric wires or bridges.
When crossing a river, measure the depth of the river
using the bucket, and cross slowly. Do not cross the river
when the depth of the river is deeper than the upper
edge of the upper roller.
SA-011
When traveling on rough terrain, reduce engine speed.
Select slow travel speed. Slower speed will reduce
possible damage to the machine.
Avoid operations that may damage the track and
undercarriage components.
During freezing weather, always clean snow and ice from
track shoes before loading and unloading machine, to
prevent the machine from slipping.
SA-15
--- Page 5 ---
SAFETY
Practice Safe Maintenance
To avoid accidents:
Understand service procedures before starting work.
Keep the work area clean and dry.
Do not spray water or steam inside cab.
Never lubricate or service the machine while it is moving.
Keep hands, feet and clothing away from power-driven
parts.
Before servicing the machine:
1. Park the machine on a level surface.
2. Lower the bucket to the ground.
3. Turn the auto-idle switch off.
4. Run the engine at slow idle speed without load for 5
minutes.
5. Turn the key switch to OFF to stop engine.
6. Relieve the pressure in the hydraulic system by moving
the control levers several times. SA-028
7. Remove the key from the key switch.
8. Attach a “Do Not Operate” tag on the control lever.
9. Pull the pilot control shut-off lever to the LOCK position.
10. Allow the engine to cool.
If a maintenance procedure must be performed with the
engine running, do not leave the machine unattended.
If the machine must be raised, maintain a 90 to 110˚
angle between the boom and arm. Securely support any
machine elements that must be raised for service work.
Inspect certain parts periodically and repair or replace as
necessary. Refer to the section discussing that part in the
“MAINTENANCE” chapter in the operator's manual. SA-527
Keep all parts in good condition and properly installed.
Fix damage immediately. Replace worn or broken parts.
Remove any buildup of grease, oil, or debris.
When cleaning parts, always use nonflammable
detergent oil. Never use highly flammable oil such as fuel
oil and gasoline to clean parts or surfaces.
Disconnect battery ground cable (−) before making
adjustments to electrical systems or before performing
welding on the machine.
SA-25
--- Page 6 ---
SAFETY
Remove Paint Before Welding or Heating
Hazardous fumes can be generated when paint is heated by
welding, soldering, or using a torch. If inhaled, these fumes
may cause sickness.
Avoid potentially toxic fumes and dust.
Do all such work outside or in a well-ventilated area.
Dispose of paint and solvent properly.
Remove paint before welding or heating:
1. If you sand or grind paint, avoid breathing the dust.
Wear an approved respirator.
2. If you use solvent or paint stripper, remove stripper with SA-029
soap and water before welding. Remove solvent or paint
stripper containers and other flammable material from
area. Allow fumes to disperse at least 15 minutes before
welding or heating.
Beware of Asbestos and Silicon Dust and Other
Contamination
Take care not to inhale dust produced in the work site.
Inhalation of asbestos fibers may be the cause of lung
cancer. Inhalation of silicon dust or other contamination
may cause sickness.
Depending on the work site conditions, the risk
of inhaling asbestos fiber, silicon dust or other
contamination may exist. Spray water to prevent asbestos
fibers, silicon dust or other contamination from becoming
airborne. Do not use compressed air.
When operating the machine in a work site where
asbestos fibers, silicon dust or other contamination SA-029
might be present, be sure to operate the machine
from the upwind side and wear a mask rated to
prevent the inhalation of asbestos, silicon dust or other
contamination.
Keep bystanders out of the work site during operation.
Asbestos fibers might be present in imitation parts. Use
only genuine Hitachi Parts.
SA-35
--- Page 7 ---
SECTION 1
GENERAL
CONTENTS
Group 1 Precautions for Disassembling and
Assembling
Precautions for Disassembling and
Assembling..................................................................W1-1-1-1
Group 2 Tightening
Tightening Bolts and Nuts...........................................W1-2-1-1
Piping Joint.......................................................................W1-2-1-4
Group 3 Painting
Painting specification....................................................W1-3-1-1
Final painted color..........................................................W1-3-1-1
Group 4 Bleeding Air
Bleeding Air from Hydraulic Oil Tank.......................W1-4-1-1
Bleeding Air from Hydraulic System........................W1-4-1-2
Bleeding Air from Fuel System...................................W1-4-1-3
Bleeding Air from Radiator..........................................W1-4-1-4
Group 5 Pressure Release Procedure
Hydraulic Circuit Pressure Release Procedure......W1-5-1-1
Group 6 Preparation
Preparation before Inspection and
Maintenance...............................................................W1-6-1-1
JBFW-1-1
--- Page 8 ---
SECTION 1 GENERAL
Group 2 Tightening
Precautions for Spilt Flange
IMPORTANT:
Clean the sealing surfaces. Check if there are
any scratches and roughness on the surface of
the seal that cause oil leaks and damage to the
WDAA-01-02-005
O-ring.
Use only specified O-rings. Inspect O-rings for
any damage. Do not file the O-ring surfaces. Incorrect
When installing O-ring into a groove, use grease
in order to hold O-ring in place.
While tightening the bolt by hand, check that
flange is installed to the port correctly. Do not
pinch the O-ring.
Tighten the bolts up and down, left and right
alternately, in order to ensure even tightening
WDAA-01-02-006
to the specified torque.
Do not use air wrenches. Using an impact
wrench often causes tightening of one bolt fully
before tighten the others, resulting in damage
to O-rings or uneven tightening of bolts.
Nut and Bolt Locking
Lock Plate
W105-01-01-008
IMPORTANT: Do not reuse the lock plates. Do not try
to bend the same point twice.
Correct Incorrect
Split Pin
IMPORTANT: Do not turn in the loosening direction
in order to align the grooves and holes on the nut.
a b
Always turn in the tightening direction. Do not
reuse the split pins.
Correct Correct Incorrect
Wire
IMPORTANT: Attach wire to bolts in the bolt-
tightening direction. Do not reuse the wire.
a
WDAA-01-02-007
a- Bend along edge sharply b- Do not bend it round
Correct Correct
Incorrect
Correct d Incorrect
c
WDAA-01-02-008
c- Tighten d- Loosen
W1-2-1-3
--- Page 9 ---
SECTION 1 GENERAL
Group 4 Bleeding Air
Bleeding Air from Fuel System
Air in the fuel system may make the engine hard to
start or make it run irregularly. After draining water and
sediment from the fuel filter, replacing the fuel filter,
cleaning the fuel solenoid pump strainer or running
the fuel tank dry, be sure to bleed the air from the fuel
system.
Air Bleeding Procedures
dCAUTION: Fuel leaks may lead to fires.
1. Check that fuel cock (1) on bottom of the fuel tank is
opened. 1
2. Loosen priming pump (3).
3. Loosen joint bolt (2) on the fuel main filter.
j : 12 mm
4. Supply fuel by reciprocating priming pump (3).
After no air bubbles are spouted through joint bolt M1U1-07-015
(2), tighten joint bolt (2).
j : 12 mm 2
5. After tightening joint bolt (2), reciprocate priming
pump (3) until its movement becomes slow.
6. Tighten priming pump (3).
7. Wipe off any spilled fuel.
8. Start the engine. Check that no fuel leaks are
present. If the engine does not start, repeat the
above procedures from step 1.
3
M111-07-046
W1-4-1-3
--- Page 10 ---
SECTION 2 MAINTENANCE STANDARD
Group 1 Upperstructure
Main Pump
1. Clearance between plunger outer diameter (A) and
cylinder block bore diameter (B).
A B
B-A Unit: mm (in)
Standard Allowable Limit
0.05 (0.002) 0.095 (0.004)
W117-02-02-009
2. Outer diameter (C) of shaft.
C
C Unit: mm (in)
Standard Allowable Limit
65 (2.56) 64.8 (2.55)
W176-02-04-019
3. Clearance (D) between plunger and shoe bottom
and shoe thickness (E)
D Unit: mm (in)
Standard Allowable Limit
0.2 (0.008) 0.45 (0.018)
E Unit: mm (in)
Standard Allowable Limit
D
8.5 (0.335) 8.3 (0.327) E
W117-02-02-011
4. Clearance between small chamber inner diameter
and servo piston
F-G Unit: mm (in)
Standard Allowable Limit
0.065 (0.0026) 0.085 (0.0033)
5. Clearance between large chamber inner diameter
and servo piston F G G F
F-G Unit: mm (in)
Standard Allowable Limit
b a
0.07 (0.0028) 0.09 (0.0035)
WDCD-02-01-001
a- Small Chamber Diameter
b- Large Chamber Diameter
W2-1-1-1
--- Page 11 ---
SECTION 2 MAINTENANCE STANDARD
Group 2 Undercarriage
Upper Roller
Roller
C
A
W166-03-06-007
B
Unit: mm (in)
Standard Allowable Limit Remedy
A 118 (4.65) -
Cladding by welding and
B 240 (9.45) -
finish or replace.
C 200 (7.87) [190 (7.48)]
fNOTE: Values in [ ] are just for reference.
Axle and Bushing
Unit: mm (in)
Standard Allowable Limit Remedy
Axle Outside Dia. 75 (2.95) [74.2 (2.92)]
Inside Dia. 75 (2.95) [76 (2.99)] Replace
Bushing
Flange Thickness 4.5 (0.18) [3.7 (0.15)]
fNOTE: Values in [ ] are just for reference.
W2-2-4-1
--- Page 12 ---
SECTION 2 MAINTENANCE STANDARD
Group 3 Front Attachment
ZX670LC-5 Class
Unit: mm (in)
Front STD., H BE
A 600 (23.6) 610 (24.0)
B 20 (0.79)
C 890 (35.0)
D 820 (32.3)
E 2164 (85.2) 2187 (86.1)
F 662 (26.1) 693 (27.3)
G 77 (3.03) 100 (3.94)
H 10 ˚
I 0˚
J 150 (5.91)
K 525 (20.7)
L 597 (23.5)
M 160 (6.30)
N 525 (20.7)
O 597 (23.5)
fNOTE: 1. Dimension A is different according to the arm
type.
2. Dimension K and N: 525 mm (20.7 in) includes
the clearance for shims in order to adjust the
bucket clearance.
3. Dimensions H: 10 ˚, I: 0 ˚ indicate the angle of
stopper.
4. Dimensions E, F and G are different according
to the bucket type.
W2-3-1-5
--- Page 13 ---
SECTION 3 UPPERSTRUCTURE
Group 1 Cab
1 2 3, 4 11 12 13 14
A B
5
6, 7
6, 7 8, 9, 10
WDAA-03-01-052
WDAA-03-01-053
16 15
19 22
17 18
Detail A Detail B
WDAA-03-01-065
WDAA-03-01-062
20, 21, 22
9. Open cover (1). 13. Remove caps (3) (2 used). Remove screws (4) (2
used). Remove cover (2) and duct (13).
10. Remove caps (20) (2 used). Remove seals (21) (2
used) and screws (22) (3 used). Remove cover (19). 14. Remove bolts, washers (15) (2 used).
11. Remove bolts, washers (6) (2 used) and washers (7) j : 17 mm
(2 used).
15. Remove bolt, washer (14). Remove cover (16).
j : 13 mm
j : 13 mm
12. Remove caps (8) (3 used). Remove rubbers (9) (3
used) and screws (10) (3 used). Remove cover (5). 16. Remove screws (11) (2 used). Remove duct (12).
17. Remove bolt, washer (18). Remove duct (17).
j : 13 mm
W3-1-1-3
--- Page 14 ---
SECTION 3 UPPERSTRUCTURE
Group 1 Cab
Detail A
1
2, 13
1
A B
WJBE-03-01-009
Detail B 3 4 5 6 7 7 8
WJBE-03-01-008
WJBE-03-01-010
11, 12 10 9
5. Connect cable (10).
6. Install horn (9) with bolt, washer (8).
j : 13 mm
m : 10 N·m (1 kgf·m, 7.4 lbf·ft)
7. Install clip (12) and bolt, washer (11).
j : 17 mm
m : 50 N·m (5 kgf·m, 37 lbf·ft)
8. Connect connectors (7) (2 used).
9. Install controller (6) with screws (5) (2 used).
10. Install connector (4) with screws (3) (4 used).
11. Install ground (13) with bolt, washer (2).
j : 13 mm
m : 10 N·m (1 kgf·m, 7.4 lbf·ft)
12. Connect connectors (1) (6 used).
W3-1-1-13
--- Page 15 ---
SECTION 3 UPPERSTRUCTURE
Group 1 Cab
Unit: mm
Section A
WDAA-03-01-004
WDAA-03-01-031
a- Chamfer along the Periphery WDAA-03-01-003
W3-1-2-3
--- Page 16 ---
SECTION 3 UPPERSTRUCTURE
Group 1 Cab
Unit: mm
Rear Glass Right-Hand Glass
WDAA-03-01-039
Rear Left-Hand Glass
WDAA-03-01-040
Lower Door Glass
WDAA-03-01-041 WDAA-03-01-042
Spacer A Spacer B Spacer C
WDAA-03-01-043 WDAA-03-01-044 WDAA-03-01-045
a- Two-Side Adhesive Tape a- Two-Side Adhesive Tape
Dam Rubber
WDAA-03-01-046
W3-1-2-13
--- Page 17 ---
SECTION 3 UPPERSTRUCTURE
Group 2 Counterweight
Removal and Installation of Counterweight
5
WJBA-03-02-001
1
Removal
1. Set the machine position for inspection and
maintenance. (Refer to W1-6-1.)
2. Open door (1).
3. Disconnect connector (5).
W3-2-1-1
--- Page 18 ---
SECTION 3 UPPERSTRUCTURE
Group 3 Main Frame
3
2
1
4
5, 6
3
WJBA-03-03-002
5. Install stopper (4) with washers (6) (4 used) and
bolts (5) (2 used).
j : 22 mm
m : 140 N·m (14 kgf·m, 103 lbf·ft)
6. Connect hose (2).
j : 17 mm
m : 25 N·m (2.5 kgf·m, 18.5 lbf·ft)
7. Connect hose (1).
j : 27 mm
m : 80 N·m (8 kgf·m, 59 lbf·ft)
8. Connect hoses (3) (4 used).
j : 41 mm
m : 200 N·m (20 kgf·m, 148 lbf·ft)
W3-3-1-7
--- Page 19 ---
SECTION 3 UPPERSTRUCTURE
Group 4 Engine
1 2 3 2 2 4
2
4
4
3
WJBF-03-04-004
2 3
dCAUTION:
(155 lb)
The beam (1) assembly weight: 70 kg
26. Attach the nylon slings onto the beam (1) assembly.
Hoist and hold the beam (1) assembly.
27. Remove bolts, washers (2) (8 used).
j : 19 mm
28. Remove bolts, washers (3) (5 used).
j : 19 mm
29. Remove bolts, washers (4) (4 used). Remove the
beam (1) assembly.
j : 19 mm
W3-4-1-9
--- Page 20 ---
SECTION 3 UPPERSTRUCTURE
Group 4 Engine
5
3
4
WJBE-03-04-009
3
1 WJBE-03-08-013
2
72. Remove bolts (1) (4 used) and washers (2) (4 used).
j : 22 mm 6 7
73. Remove bolts, washers (4) (4 used). Remove bracket
(3).
j : 19 mm 8
74. Remove bolts (7) (4 used) and washers (6) (4 used)
at the counterweight side. Remove bracket (8).
fNOTE: LOCTITE # 262 has been applied onto bolts (7) (4
used).
j : 22 mm
75. Remove bracket (8) at the front attachment side in
WJBE-03-04-010
the same way as step 74.
76. Remove the adapter with engine (5) attached if
necessary.
W3-4-1-19
--- Page 21 ---
SECTION 3 UPPERSTRUCTURE
Group 4 Engine
1 2 3
4
5
6 WJBF-03-04-005
44. Connect pipe (2) with clamps (1, 3) (2 used for each).
m : 10 N·m (1 kgf·m, 7.4 lbf·ft)
45. Connect the pipe (5) assembly with clamps (4) (2
used) and clamp (6).
m : 10 N·m (1 kgf·m, 7.4 lbf·ft)
W3-4-1-29
--- Page 22 ---
SECTION 3 UPPERSTRUCTURE
Group 5 Radiator Assembly
Replacement of Radiator and Oil Cooler
1 2
WJBF-03-08-001
IMPORTANT: Cap the open ends in case the hoses
and pipes have been disconnected. In addition,
attach an identification tag onto the connectors,
hoses, and pipes for assembling. Connect the
hoses and install the clips in case the clips which
secure the hoses have been removed.
Removal
1. Set the machine position for inspection and
maintenance. (Refer to W1-6-1.)
dCAUTION: Bleed air from the hydraulic oil tank.
(Refer to W1-4-1.)
2. Remove bolts, washers (2) (6 used). Remove cover
(1).
j : 17 mm
3. Drain off hydraulic oil by using an oil feed pump.
fNOTE: Total oil amount: 750 L (198 US gal)
W3-5-1-1
--- Page 23 ---
SECTION 3 UPPERSTRUCTURE
Group 5 Radiator Assembly
2
1
11, 12 3
9, 10 4
5
6
7
8
WJBF-03-05-012
35. Remove bolts, washers (11) (6 used) and clips (12) (6 39. Remove bolts, washers (5) (2 used). Remove the
used). bracket (6) assembly.
j : 19 mm j : 19 mm
dCAUTION: Cover (2) weight: 35 kg (78 lb) 40. Remove bolts, washers (7) (2 used). Remove the
bracket (8) assembly.
36. Remove bolts, washers (1) (6 used). Remove cover
(2). j : 19 mm
j : 19 mm
dCAUTION: Cover (3) weight: 34 kg (75 lb)
37. Remove bolts, washers (4) (6 used). Remove cover
(3).
j : 19 mm
38. Remove clamp (9). Disconnect hose (10).
W3-5-1-11
--- Page 24 ---
SECTION 3 UPPERSTRUCTURE
Group 5 Radiator Assembly
1
2
3
1
2
1
3
6 4
5
6
WJBF-03-05-002
64. Remove clamps (1) (16 used). Disconnect hoses (2,
3) (2 used for each).
65. Remove bolts (6) (4 used). Disconnect pipes (4, 5).
j : 19 mm
W3-5-1-21
--- Page 25 ---
SECTION 3 UPPERSTRUCTURE
Group 5 Radiator Assembly
a 1