PDF Shop Manual Komatsu PC290LC-11 Hydraulic Excavator - 4 MB

This is the official shop manual for the Komatsu PC290LC-11 Hydraulic Excavator, an essential resource for any technician or owner.

It provides comprehensive, step-by-step instructions for all repair and maintenance procedures.

With detailed diagrams and specifications, you can confidently tackle everything from simple adjustments to complete engine overhauls.

Keep your powerful PC290LC-11 operating at peak efficiency and reduce costly downtime.

This manual is the key to professional-level service.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
SEN06507-20


HYDRAULIC   PC290LC -11
EXCAVATOR   SERIAL NUMBERS   35001   and up

--- Page 3 ---
Safety Notice for Operation                                                                   00 Index and Foreword


Precautions During Work
 •   For the machine with the battery disconnect switch, check before starting the work that the system operat-
     ing lamp is not lit. Then, turn the battery disconnect switch to OFF (○) position.
     REMARK
     Remove the key after it is turned to OFF (○) position if the battery disconnect switch is a switch key type.
     For the machine without the battery disconnect switch, turn the starting switch to OFF position, wait for two
     minutes or more before starting the work. Disconnect the battery cable by starting from the negative (-) ter-
     minal first.
 •   For the machine with the quick release battery terminal (-), check before starting the work that the system
     operating lamp is not lit. Then, disconnect the quick release battery terminal (-).
     REMARK
     For the machine without the system operating lamp, turn the starting switch to OFF position, wait for two
     minutes or more before starting the work. Disconnect the quick release battery terminal (-).
 •   Release the remaining pressure from the circuit before starting the work of disconnecting and removing of
     oil, fuel, water, or air from the circuit. When removing the cap of oil filter, drain plug, or oil pressure plug, it
     should be done slowly otherwise the oil spills.
 •   When removing or installing the checking plug or the piping in the fuel circuit, wait 30 seconds or longer
     after the engine is shut down and start the work after the remaining pressure is released from the fuel cir-
     cuit.
 •   The coolant and oil in the circuits are hot when the engine
     is shut down. Be careful not to get scalded. Wait for the oil
     and coolant to cool before performing any work on the oil
     or coolant circuits.


00-26                                                                                                     PC290LC-11

--- Page 4 ---
00 Index and Foreword                                                                 Practical Use of KOMTRAX


Practical Use of KOMTRAX
Various information which KOMTRAX system transmits by using the radio communication is useful for KOM-
TRAX operator to provide various services for the customers.
When KOMTRAX system is installed to the machine and it is enabled, machine information can be checked by
KOMTRAX system, and it is used for testing and troubleshooting to be performed efficiently.
Large-sized models are equipped with KOMTRAX Plus which can use more detailed information.
REMARK
(KOMTRAX may not be installed to the machine in some countries or areas.)
Advantage to Use KOMTRAX
 •   The location where the machine is working at can be checked on the map in a personal computer.
 •   Operation information such as service meter, operating hours, fuel consumption, and occurred caution as
     well as failure code can be checked.
 •   The operator can check the hours used and replacement interval of consumable parts of the machine such
     as fuel filter, hydraulic oil filter, hydraulic oil and engine oil.
 •   Information of how machine is operated (idling time, traveling time, digging time, relieving time, etc.) can be
     checked, and it is used to presume the machine operating condition.
 •   Various reports such as “Fuel saving operation support”, “Operation summary”, etc. is generated, and it is
     utilized as an advice tool for the user and operator.
 •   KOMTRAX Plus can record the data of abnormality record, trend data, snap shot data, etc. to grasp the
     soundness of machine, in addition to KOMTRAX function described above. These data can be used on per-
     sonal computer screens.
How to Make a Full Use of KOMTRAX
Making use of KOMTRAX enables the following activities.
 •   Quick response to a request for immediate repair
     1. To check the displayed caution and failure code, etc. through KOMTRAX upon receiving a repair re-
         quest from a user.
     2.   To immediately arrange necessary tools, replacement parts, etc, immediately in accordance with the
          displayed failure code.
     3.   To find the location of the failed machine by using the map of KOMTRAX, to visit the customer there.
 •   Proactive maintenance
     1. To check the service summary screen of KOMTRAX, to find the machine which has high priority failure
         code indicated by a red or yellow flag.
     2. To check the condition of the machine with the customer and to make a plan to visit.
     3.   To immediately arrange necessary tools, replacement parts, etc, immediately in accordance with the
          displayed failure code.
 •   Practice of periodic maintenance and periodic inspection service
     1. To check the service summary screen of KOMTRAX, and to find the machine of which the usage limits
         for the consumable parts indicated by red flags are over.
     2. To submit an estimate sheet for the consumable parts to be replaced and the labor cost for the replace-
         ment work to the customer.
     3. To propose the periodic inspection (Pm clinic, etc.) according to the service meter reading.
How to Operate KOMTRAX
For the operating method of each screen of KOMTRAX, ask KOMTRAX key person in your Komatsu distributor.


PC290LC-11                                                                                                    00-53

--- Page 5 ---
Standard Tightening Torque Table                                                                     00 Index and Foreword


               Thread diam- Width across                                 Tightening torque (Nm {kgfm} )
Nominal No.
                eter (mm)    flats (mm)                          Range                                     Target
        18             18             27                34.3 to 44.1 {3.5 to 4.5}                         39.2 {4.0}
        20             20             30                44.1 to 53.9 {4.5 to 5.5}                         49.0 {5.0}
        24             24             32                58.8 to 78.4 {6.0 to 8.0}                         68.6 {7.0}
        30             30             32               93.1 to 122.5 {9.5 to 12.5}                    107.8 {11.0}
        33             33              -              107.8 to 147.0 {11.0 to 15.0}                   127.4 {13.0}
        36             36             36              127.4 to 176.4 {13.0 to 18.0}                   151.9 {15.5}
        42             42              -              181.3 to 240.1 {18.5 to 24.5}                   210.7 {21.5}
        52             52              -              274.4 to 367.5 {28.0 to 37.5}                   323.4 {33.0}

Table of Tightening Torque for Hose (Taper Seal Type and Face Seal Type)
REMARK
 • Tighten the hose fittings (taper seal type and face seal type) to the torque shown in the following table un-
   less otherwise specified.
 • The table is applied to the threaded portion coated with engine oil (wet threaded portion).


             Width               Tightening torque (Nm {kgfm} )                Taper seal                   Face seal
Nominal
             across                                                                         Nominal size - Thread root
No. of                                                                       Thread size
               flats                 Range                     Target                       threads per    diameter(mm)
hose                                                                         (mm)
              (mm)                                                                          inch           (reference)
                              34 to 54 {3.5 to 5.5}           44 {4.5}                -        9/                       14.3
                                                                                                 16-18UN
   02          19
                              34 to 63 {3.5 to 6.5}           44 {4.5}               14               -                  -
               22             54 to 93 {5.5 to 9.5}           74 {7.5}                -       11/                       17.5
                                                                                                    16-16UN
   03
               24            59 to 98 {6.0 to 10.0}           78 {8.0}               18               -                  -
   04          27            84 to 132 {8.5 to 13.5}         103 {10.5}              22       13/                       20.6
                                                                                                    16-16UN

   05          32           128 to 186 {13.0 to 19.0}        157 {16.0}              24        1 -14UNS                 25.4
   06          36           177 to 245 {18.0 to 25.0}        216 {22.0}              30       13/16-12UN                30.2
                            177 to 245 {18.0 to 25.0}        216 {22.0}              33               -                  -
   (10)        41
                            240 to 300 {24.5 to 30.5}        270 {27.5}               -       17/16-12UN                36.5
   (12)        46           197 to 294 {20.0 to 30.0}        245 {25.0}              36               -                  -
   (14)        55           246 to 343 {25.0 to 35.0}        294 {30.0}              42               -                  -


00-80                                                                                                               PC290LC-11

--- Page 6 ---
10 Structure and Function                                         Layout Drawing of Urea SCR System


5: DEF tank pressure hose (low temperature side)   8: DEF tank coolant inlet hose
6: DEF pump                                        9: DEF pressure hose (high-temperature side)
7: DEF suction hose                                10: DEF tank heating valve


11: KDPF                                           12: DEF mixing tube

PC290LC-11                                                                                        10-7

--- Page 7 ---
Component Parts of Urea SCR System                                                    10 Structure and Function


DEF Injector
Structure of DEF Injector
A: Pressurized sending from DEF pump
B: Coolant inlet
C: Coolant outlet
1: DEF injector
2: DEF inlet connector
3: Coolant inlet connector
4: Coolant outlet connector
5: Electric connector


Function of DEF Injector
 •   It injects DEF which is pressurized by DEF pump into DEF mixing tube.
 •   The injection amount is controlled by the valve opening or closing time while the pressure is constant.
 •   It circulates the engine coolant to prevent it from being heated by the heat from the exhaust pipe.

Operation of DEF Injector
Principle of injection of the injector is described. Following fig-
ure shows the state of injection.
1. Engine controller sends the electrical signal to control DEF
     injector.
2.   Solenoid (4) moves seal ball (2), and seal ball (2) leaves
     from injection port (1) to make opening state.
     Pressurized DEF by DEF pump is injected.
3.   When the electrical signal is not sent, seal ball (2) closes
     injection port (1) with spring force (3), so DEF is not injec-
     ted.


10-34                                                                                                PC290LC-11

--- Page 8 ---
10 Structure and Function                                                 Component Parts of Engine System


Operation of VGT
REMARK
Six cylinder engine is shown in this item.


1.   The exhaust gas enters (C) of turbine housing (4) and flows out through portion (P) and (D). Portion (P) is
     surrounded by plate (5) fixed to turbine housing, nozzle ring (7), and vanes (6).
     The area of its passage is changed by sliding push rod (8) to the right or left.
2.   Hydraulic actuator (3) moves piston in the actuator up and down with the hydraulic pressure controlled by
     EPC valve installed to the front cover, and slides push rod (8) to the right and left.
3.   The exhaust gas flowing through vanes (6) rotates blower impeller (10) through shaft (9) joined to turbine
     impeller (11). As the result, the blower impeller works as a compressor, and the intake air entering through
     (A) is compressed and discharge through (B).
4.   When the exhaust gas pressure at inlet (C) of turbine housing (4) is low (engine speed is in low range),
     push rod (8) slides to the right and narrows portion (P).
5.   The exhaust gas acting on turbine impeller (11) increases, the turbocharger speed increases, and more air
     (oxygen) is taken in.
     VGT speed sensor (2) detects the rotation of the turbocharger.


PC290LC-11                                                                                                 10-61

--- Page 9 ---
KOMTRAX System                                                                    10 Structure and Function


KOMTRAX System
System Diagram of KOMTRAX System


KOMTRAX system consists of KOMTRAX terminal, communication antenna, and GPS antenna

Function of KOMTRAX System
 •   KOMTRAX system transmits various types of information on the machine. KOMTRAX administrator sees
     the information in the office and supplies various services to the customers.
 •   KOMTRAX system can transmits the following information.
      •   Positional information
      •   Working information
      •   Alarm and failure information
      •   Fuel consumption information
      •   Maintenance information
      •   Machine working condition information
REMARK
To provide the services, you need to establish radio station for KOMTRAX separately.


10-88                                                                                          PC290LC-11

--- Page 10 ---
10 Structure and Function                              Component Parts of Control System


Engine Controller
Structure of Engine Controller
General View


Input and Output Signals of Engine Controller (Machine with KOMTRAX Termi-
nal)
Delphi96Pin “ECM J1”
   Pin No.                               Signal name                    Input/output signal
                                                                         Ground/Shield/
     1       Injector #1 (-)
                                                                            Return
                                                                         Ground/Shield/
     2       Injector #2 (-)
                                                                            Return
                                                                         Ground/Shield/
     3       Injector #3 (-)
                                                                            Return
     4       (*1)                                                                -
     5       (*1)                                                                -
     6       (*1)                                                                -
     7       (*1)                                                                -
     8       (*1)                                                                -
     9       Sensor power supply relay                                        Output
                                                                         Ground/Shield/
     10      IMV (-)
                                                                            Return


PC290LC-11                                                                           10-115

--- Page 11 ---
CLSS                                                                     10 Structure and Function


When Control Lever is Stroked to the End and Cylinder is in Stroke End Posi-
tion (When Relief)

                                                          2


                       3

                                            4
         1


                            5                                       6
                                                                                   7


                       8                      Min.

                                       Max.


                                                              9


                                     Max.                         Min.


                                                     10

             16        13


                                                                    11
         15                     12


                  14

                                                                                         G0000139


10-142                                                                                 PC290LC-11

--- Page 12 ---
10 Structure and Function                                          Component Parts of Hydraulic System


Control of Discharged Volume
1.   The swash plate angle (a) increases, the difference be-
     tween volumes (E) and (F) increases, and also pump dis-
     charged volume (Q) increases.
2.   Swash plate angle (a) is changed by servo piston (13).
3.   Servo piston (13) moves in a linear reciprocating motion
     corresponding to the signal pressure from the PC valve
     and LS valve.
     This linear reciprocating motion is transmitted to rocker
     cam (4) through slider (14).
4.   Rocker cam (4) supported on the cylindrical surface of cra-
     dle (2) slides and pivots on that surface.
5.   Output pressure (PEN) of LS valve is supplied to the pres-
     sure chamber on large diameter piston side.
6.   The pressure receiving areas on the right and left sides of
     servo piston (13) are different, and discharged pressure
     (self pressure) (PP) of the main pump is constantly sup-
     plied to the pressure chamber on the small diameter piston
     side.
7.   The movement of servo piston (13) is controlled by the dif-
     ference between pressure (PP) on the small diameter pis-
     ton side and pressure (PEN) on the large diameter piston
     side and the ratio of the pressure receiving area between
     the small diameter piston and large diameter piston.


Main Pump LS Valve
LS
Abbreviation for Load Sensing


PC290LC-11                                                                                      10-169

--- Page 13 ---
Component Parts of Hydraulic System                                  10 Structure and Function


Sectional Views (J-J, L-L, K-K, M-M)


1: Return spring                           4: Spring (sequence valve)
2: Merge-divider valve (for LS)            5: Merge-divider valve (main)
3: Valve (sequence valve)                  6: Return spring
Boom Valve
7: Boom hydraulic drift prevention valve

10-196                                                                            PC290LC-11

--- Page 14 ---
10 Structure and Function                                             Component Parts of Hydraulic System


Operation of LS Select Valve of Control Valve
When Pilot Pressure (BP) is Cut Off
1.   Since pilot pressure (BP) is cut off, piston (3) is pressed to
     the left by the reaction force of spring (2).
2.   When the swing operation is performed, swing LS pres-
     sure (P1) passes through swing spool (5) and enters port
     (A).
3.   Swing LS pressure (P1) pushes valve (1) to the left, and
     port (A) is connected to port (B).
4.   Swing LS pressure (P1) flows from port (A) through port
     (B) to LS shuttle valve (8).


PC290LC-11                                                                                         10-223

--- Page 15 ---
Layout Drawing of Work Equipment System                                             10 Structure and Function


Work Equipment System
Layout Drawing of Work Equipment System
Chassis Part


1: Bucket cylinder                                         6: Fuel supply pump
2: Arm cylinder                                            7: Engine controller
3: Boom cylinder                                           8: Attachment circuit accumulator (for high pressure
4: Attachment selector valve                                 circuit)

5: Attachment circuit accumulator (for low pressure cir-
   cuit)

10-250                                                                                            PC290LC-11

--- Page 16 ---
10 Structure and Function                                         Component Parts of Work Equipment System


Operation of EPC Valve of 1st-Line Attachment PPC Valve
When Signal Current is Zero (Coil is De-energized)


                           Control valve
                                                                              3
                                                        C


                                                                                               T


                                                                              P
                                                            4                           2


                                                                              Self pressure
                                                                              reducing valve


                                                                                                         G0012655

1.   When the signal current from the controller does not flow through coil (4), coil (5) is de-energized.
2.   Spool (2) is pressed to the right by spring (3).
3.   Port (P) is closed and no pressurized oil from the self-pressure reducing valve flows to the control valve.
4.   The oil from the control valve is drained into the tank from port (C) through port (T).


PC290LC-11                                                                                                   10-277

--- Page 17 ---
Component Parts of Work Equipment System                                         10 Structure and Function


     Attachment bypass solenoid valve blocks the hydraulic oil
     passage between the attachment solenoid valve (P) and
     attachment solenoid valve (Q) so as to keep the pressure
     on the attachment operation side constant.

                                                                                P       Q


                                                                                                    $(3

2.   When the attachment control pedal is depressed
     Attachment bypass solenoid valve is energized with a cur-
     rent supplied from the pump controller (1), it moves the
     spool, and the hydraulic oil passage between the attach-
     ment solenoid valve (P) and attachment solenoid valve (Q)                  P       Q
     is opened.


                                                                                                    $(3


Function of Attachment Bypass Solenoid Valve
Attachment bypass solenoid valve is a valve which blocks the hydraulic oil passage between the attachment
solenoid valve (P) and attachment solenoid valve (Q) so that the hydraulic oil from high pressure side to low
pressure side is not leaked. It is enabled when the attachment control pedal is not depressed.

Operation of Attachment Bypass Solenoid Valve


1: Pump controller                                      2: Attachment bypass solenoid valve


10-304                                                                                          PC290LC-11

--- Page 18 ---
10 Structure and Function                      Layout Drawing of Travel System


1: Control valve            4: Fuel supply pump
2: Main pump                5: Engine controller
3: LS-EPC valve             6: Travel alarm


8: Travel control lever     11: Pump controller
9: Machine monitor          12: R.H. travel REVERSE pressure sensor
10: Fuel control dial       13: R.H. travel FORWARD pressure sensor


PC290LC-11                                                             10-331

--- Page 19 ---
Layout Drawing of Undercarriage         10 Structure and Function


Front Idler Detailed Drawing


9: Idler cushion

Specifications of Undercarriage
Quantity of Track Rollers (One Side)
10 pieces
Standard Shoe
Shoe width: 800 mm
Link pitch: 190.3 mm
Number of shoes (each side) 51 pieces


10-358                                               PC290LC-11

--- Page 20 ---
20 Standard Value Table                                     Standard Value Table for Machine: PC290LC-11


REMARK
 • Bring pump discharged pressure P1 and P2 as close as possible to the average pressure when measuring.
 • Avoid measuring the near turning point of the graph because the error increases there.
 • When measuring with the pump mounted on the machine, if it is impossible to set the engine speed to the
   specified speed by using the fuel control dial, take the pump discharged volume and the engine speed at the
   time of measurement, and use them as a base for calculating the pump discharged volume at the specified
   speed.


PC290LC-11                                                                                              20-19

--- Page 21 ---
Tools for Testing and Adjusting                                                     30 Testing and Adjusting


Symbol      Part No.                    Part name              Q'ty                   Remarks
          Commercially
   B                     Nitrogen gas cylinder                  1
            available
   C     792-610-1400    Regulator                              1
   D     792-610-1270    Hose                                   1
   E     792-610-1260    Nipple                                 1
   F     792-610-2410    Nipple                                 1

Replace Tools for Accumulator Bladder on High Pressure Side for Attachment Piping
Symbol      Part No.                    Part name              Q'ty                   Remarks
   A     792-610-1703    Charge valve assembly                  1     Gas charging tool of accumulator N2
          Commercially
   B                     Valve core driver                      1     For JIS valve core B type
            available
   C      09003-03639    Wrench                                 1     For outside diameter 55 mm
   D      790-170-1110   Bladder installation tool              1
          Commercially
   E                     Flat-head screwdriver                  1
            available

Tools to Adjust KomVision Camera Angles
Symbol      Part No.                    Part name              Q'ty                   Remarks
          Commercially                                                Niigata Seiki bevel box: BB-180 equiva-
   A                     Digital angle gauge                    1
            available                                                 lent

Tools to Examine KomVision (Camera Calibration)
Symbol      Part No.                    Part name              Q'ty                   Remarks
   A           -         Angle setting calibration marker       1
   B           -         Position setting calibration marker    1
          Commercially
   C                     Tripod                                 1
            available
          Commercially
   D                     Traffic cone                           2     Height : Approx. 70 cm
            available


30-12                                                                                              PC290LC-11

--- Page 22 ---
30 Testing and Adjusting                                                                Examine Fuel Pressure


A: Low-pressure circuit measuring position (fuel main       C: Return circuit measuring position (supply pump
  filter inlet side)                                          drain port)
B: Low-pressure circuit measuring position (fuel main       D: Negative pressure circuit measuring position (sup-
  filter outlet side)                                         ply pump inlet)
For testing the fuel pressure to perform troubleshooting, refer to this section.

How to Examine Fuel Pressure
Examine Low-Pressure Circuit (Fuel Main Filter Inlet Side)
1.   Open the side cover on the right side of the engine and re-
     move fuel pressure pickup plug (1) on the inlet side of the
     fuel main filter.


PC290LC-11                                                                                                 30-39

--- Page 23 ---
Examine SCR Related Functions                                                        30 Testing and Adjusting


7.   Check that “0” of “Test State” is flashing.
     REMARK
     Flashing of “0” indicates “Waiting for the start (default)”,
     and test can be performed. Display other than “0” appears,
     follow instructions according to “Parameter list of test
     state”.
8.   Press F1 to start “DEF Pump Pressure Up Test”.
     F1: Starts “DEF Pump Pressure Up Test”.
     F2: Stops “DEF Pump Pressure Up Test”. (When “STOP”
       is displayed.)
     F5: Returns the screen to “SCR Service Test” screen.
     NOTICE
     “Test State” does not change to “10” and test does not
     start even if F1 is pressed, turn starting switch to OFF
     position once, and repeat the testing procedure from
     step 1.
     REMARK
      • Display of “Test State” changes to flashing of “10”, and
        value of “DEF Pump Pressure” increases. While the
        pressure is increasing, display of “Remaining Permitted
        Test Time” is counted down from “1800 to 0 sec”, and
        when it reaches to “0 sec”, the test will be finished au-
        tomatically.
      • When the display of “Test State” is “11” to “41”, follow
        “Parameter list of Test State”.
      • When the value of “DEF Pump Pressure” exceeds
        “900 kPa” within 1800 seconds of “Remaining Permit-
        ted Test Time”, DEF pump and DEF pressure line are
        normal. Press F2 to complete the test.
      •   If the value of “DEF Pump Pressure” does not increase, check each part of DEF pressure line for leak-
          age, or check by sound and vibration that DEF pump operates. However, perform the checking of each
          part of DEF pressure line for leakage, and DEF pump for operation, before “Remaining Permitted Test
          Time” becomes “0sec”.
      •   If the value of “DEF Pump Pressure” does not exceeds 800 kPa after approximately 200 seconds are
          elapsed, DEF stops operation automatically and failure code [CA1682] is displayed. If the failure code
          is displayed, perform troubleshooting.
9.   When the display of “Test State” changes from flashing of
     “20” to flashing of “0”, press F5.
     REMARK
      • The display of “20” of “Test State” indicates that DEF
        purge is in progress, and it starts automatically and
        stops in 5 minutes at maximum.
      • The display of “0” of “Test State” indicates “Wait for the
        start (default)”, and is ready for test again.


30-66                                                                                              PC290LC-11

--- Page 24 ---
30 Testing and Adjusting                                                                         Clean DEF Pump


     2)   Check the monitoring information of (a) to (d).
          Details of the monitoring information are as follows.
          1: Thawing is in process.
          2: Thermal insulation is in process.
          3: OFF
            •   When one or more of the status of the monitoring
                information (a) to (d) is “1”:
                DEF is frozen. Thawing is in process. Keep the
                engine speed at low idle and wait until all the
                states of (a) to (d) of the monitoring information
                become “2” or “3”. And then, go to Step 3.
            •   When the monitoring information of (a) to (d) are
                “2” or “3”:
                DEF is not frozen. Go to Step 3.


3.   Show the Abnormality Record screen. For details, see “How to See Abnormality Record (Mechanical Sys-
     tems)” and “How to See Abnormality Record (Electrical Systems)”.
4.   Make sure that the failure code (other than [CA1682], [CA3574], and [CA3596]) with the action level is not
     shown.
     NOTICE
     If the failure code (other than [CA1682], [CA3574], and [CA3596]) is shown, see TROUBLESHOOT-
     ING to do the troubleshooting.
     REMARK
     The failure codes [CA1682], [CA3574], and [CA3596] can be shown when foreign materials in the tank are
     caught to the DEF pump.
          CA1682: DEF Pump Priming Error
          CA3574: DEF Pump Pressure Too Low Error
          CA3596: DEF Pump Pressure Unstable Error
5.   Stop the engine.
     k Parts and oil are still very hot immediately after the engine is stopped. It can cause burn injury.
          Wait for the temperature to go down, and then start the work.
6.   Check the stored condition and procedure to add DEF.
     1) Make sure that the pump or container with corrosion resistance is used to add DEF.
     2)   Before you add DEF, be sure to clean around the filler port.
     REMARK
     For details, see the Service news “AT16201”.
7.   Clean the surface of DEF pump, around the DEF tank filler port, and inside of the DEF tank cap.
     REMARK
      • Use water and brush to clean the surface of DEF pump, around the DEF tank filler port, and inside of
        the DEF tank cap. Fully clean up the dirt.
      • If they are not cleaned fully, foreign material can go into them when you replace the DEF filler port filter
        or when you clean the DEF pump.


PC290LC-11                                                                                                    30-93

--- Page 25 ---
Examine and Adjust Oil Pressure in Pump LS Control Circuit      30 Testing and Adjusting


1.   Open the cover on the right side of the machine, and re-
     move oil pressure pickup plugs (PFC), (PRC), (PLSFC),
     (PLSRC).
     (PFC): Front pump discharge pressure pickup port
     (PRC): Rear pump discharge pressure pickup port
     (PLSFC): Front load pressure pickup port
     (PLSRC): Rear load pressure pickup port


30-120                                                                      PC290LC-11

--- Page 26 ---
Examine and Charge Accumulator Nitrogen Gas Pressure for Attach-
30 Testing and Adjusting                                                       ment (High Pressure Side)


Examine and Charge Accumulator Nitrogen Gas Pressure for Attachment
(High Pressure Side)
Examine and Charge Tools for Accumulator Nitrogen Gas Pressure for Attachment
Symbol        Part No.                    Part name               Q'ty                    Remarks
     A     792-610-1703     Charge valve assembly                  1
            Commercially
     B                      Nitrogen gas cylinder                  1
              available
     C     792–610–1400 Regulator                                  1

View the complete manual on HeyDownloads →