PDF Service Repair Manual JCB 1253 1202 1553 1554 Liftall - 3 MB

This service repair manual covers the JCB Liftall models 1253, 1202, 1553, and 1554.

It is a comprehensive resource for maintenance and repair, providing detailed instructions and diagrams.

Technicians will find this manual essential for troubleshooting problems and performing complex repairs according to manufacturer specifications.

Keep your JCB Liftall equipment in top condition with this guide.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram βœ‰Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
Service Manual

                            Liftall 1253/1202/1553/1554
                                              Service Manual - Liftall 1253/1202/1553/1554
                                                          Section 1 - General Information
                                                              Section 2 - Care and Safety
                                                         Section 3 - Routine Maintenance
                                                         Section B - Body and Framework
                                                                     Section C - Electrics
                                                                     Section D - Controls
                                                                   Section E - Hydraulics
                                                                Section F - Transmission
                                                                      Section G - Brakes
                                                                      Section K - Engine


                                                                            Publication No.
                                                                             9813/1650


                                                                                                                                                                                      World Class
                                                                                                                                                                                    Customer Support
Copyright Β© 2007 JCB SERVICE. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any other means,
                                      electronic, mechanical, photocopying or otherwise, without prior permission from JCB SERVICE.

                         Issued by JCB India Limited, 23/7, Mathura Road, Ballabgarh - 121004, Haryana (India), Tel 0129 4299000 Fax 0129 2309051

--- Page 3 ---
Section 1 - General Information
                                                                                                General Information
                                                                                                                     Torque

                                                         Torque

Torque Settings                                                    Values are for dry threads and may be within three percent
                                                                   of the figures stated. For lubricated thread the values
Use only where no torque setting is specified in the test.         should be reduced by one third.


                                                             Table 1.
Bolt Size           Hexagon (A/F)                                  Torque Setting
In                  (mm)                   In                     Nm                 Kgfm                lbf ft
1/4                 (6.3)                  7/16                   14                 1.4                 10
5/18                (7.9)                  1/2                    28                 2.8                 20
3/8                 (9.5)                  9/16                   49                 5.0                 36
7/16                (11.1)                 5/8                    78                 8.0                 58
1/2                 (12.7)                 3/4                    117                12.0                87
9/10                (14.3)                 13/16                  170                17.3                125
5/8                (15.9)                  15/16                  238                24.3                175
3/4                 (19.0)                 11/8                   407                41.5                300
7/8                 (22.2)                 15/16                  650                66.3                480
1                   (25.4)                 11/2                   970                99.0                715
11/4               (31.7)                  17/8                   1940               198.0               1430
11/2               (38.1)                  21/4                   3390               345.0               2500

                                                Table 2. Metric Grade 8.8 Bolts
Bolt Size           Hexagon (A/F)                                 Torque Setting
M5                  (5)                    8                      7                  0.7                 5
M6                  (8)                    10                     12                 1.2                 9
M8                  (8)                    13                     28                 3.0                 21
M10                 (10)                   17                     56                 5.7                 42
M12                 (12)                   19                     98                 10                  72
M16                 (16)                   24                     244                25                  180
M20                 (20)                   30                     476                48                  352
M24                 (24)                   36                     822                84                  607
M30                 (30)                   46                     1633               166                 1205
M36                 (36)                   55                     2854               291                 2105

Note: All bolts used on JCB machines are high tensile and
must not be replaced by bolts of a lesser tensile
specification.


1-7                                                       9813/1650                                                     1-7

--- Page 4 ---
Section 1 - General Information
                                                                                             General Information
                                                                                                 Tool Detail Reference


       Fig 33. 892/00849 Braided Cutting Wire                             Fig 36. 992/12400 Static Oven 240V
Consumable heavy duty cut-out wire used with the glass           Required to pre-heat adhesive prior to use. No plug
extraction tool. K Fig 30. ( T 1-16). Approx 25 m length.        supplied.

                                                                 Note: 110V models available upon request - contact JCB
                                                                 Technical Service.


       Fig 34. 926/15500 Rubber Spacer Blocks
Used to provide the correct set clearance between glass
edge and cab frame. Unit quantity = 500 off.


                                                                            Fig 37. 992/12800 Cut-Out Knife
                                                                 Used to remove broken glass.


          Fig 35. 992/12300 Mobile Oven 12V
1 cartridge capacity. Required to pre-heat adhesive prior
to use. It is fitted with a male plug (703/23201) which fits                  Fig 38. 992/12801 'L' Blades
into a female socket (715/04300).
                                                                 25 mm (1 in.) cut. Replacement blades for cut-out knife.
                                                                 K Fig 37. ( T 1-17). Unit quantity = 5 off.


1-17                                                      9813/1650                                                1-17

--- Page 5 ---
Section 1 - General Information
                                                                                          General Information
                                                                                             Tool Detail Reference


                                                                                A408900


                                           Fig 66. Socket Box Wrench
Note: For disassembly and assembly of slew motor gearbox. This tool can not be ordered from JCB.


1-27                                                9813/1650                                               1-27

--- Page 6 ---
Section 2 - Care and Safety
                                                                                                                      Contents


      Contents                                                                                        Page No.
      Safety Notices
         Important Information ...............................................................................1 - 2
            Safety Warnings ..................................................................................1 - 2


2-i                                                                                                                       2-i

--- Page 7 ---
Section 3 - Routine Maintenance
                                                                                                                          Contents


       Contents                                                                                            Page No.
         Hydraulic System ..................................................................................... 3-48
            Introduction ..........................................................................................3-48
            Checking the Fluid Level .....................................................................3-49
            Hydraulic Tank Cap/Breather ..............................................................3-50
            Changing the Return Line Filter Element ............................................3-50
            Changing the Suction Strainer .............................................................3-51
         Transmission ........................................................................................... 3-52
            Gearbox ...............................................................................................3-52
         Wheels and Tyres .................................................................................... 3-54
            Water Ballast .......................................................................................3-54
            Tyre Inflation ........................................................................................3-55
            Wheel Nuts ..........................................................................................3-56


3-ii                                                                                                                           3-ii

--- Page 8 ---
Section 3 - Routine Maintenance
                                                                                            Routine Maintenance
                                                                                                       Service Schedule


(1) If working conditions are extremely dusty and quality of fuel/ lubricant is poor, please change filters earlier than
    specified period.
(2) Bolts loosening to be checked and worn out lock nuts to be replaced.
(3) Front brake shoe carrier mounting nuts to be checked for loosening at regular intervals and are to be replaced only.
    Discard old worn out lock nuts.
(4) Wire rope care and lubrication is required at regular intervals for trouble free operations. With time and usage of the
    machine, the extension and retraction wire rope gets loose and it can affect the boom operations. Adjust the wire rope
    tension properly.


3-10                                                    9813/1650                                                    3-10

--- Page 9 ---
Section 3 - Routine Maintenance
                                                                                     Routine Maintenance
                                                                                             Checking For Damage
Shackle Inspection


               F

           G


       H

       J


                                                                                                              D030910
                                                                                    Fig 5.

                                                          Check shackle for excessive wear. K Fig 5. ( T 3-20).
                                           K

                                               D030900
                          Fig 4.
F      Check for wear
G      Check for wear
H      Check for wear and straightness
J      Check to insure the pin is seated
K      Check Shackle for opening


                                                                                                              D030920
                                                                                    Fig 6.

                                                          Look for improper replacement of pins. K Fig 6. ( T 3-20).

                                                          Do not replace a pin with a bolt or any other fastener.
                                                          K Fig 6. ( T 3-20).


3-20                                               9813/1650                                                 3-20

--- Page 10 ---
Section 3 - Routine Maintenance
                                                                                Routine Maintenance
                                                                                      Electrical System


                                            A
                                        B
                                                A089660-11
                       Fig 23.

4   Refit battery.

5   Close and lock the access panels.


3-30                                                   9813/1650                                 3-30

--- Page 11 ---
Section 3 - Routine Maintenance
                                                                                            Routine Maintenance
                                                                                                                   Engine
Changing the Filter Elements                                     4    Release the clamps and remove outer end cap B.

Note: Do not try to wash or clean the elements, they must        5    Remove the outer element G.
be replaced.
                                                                      Pull out the element G. Take care not to tap or knock
Note: In dusty conditions, replace the outer-element more             the element as you remove it.
frequently than the service schedule recommendation.
Install a new inner-element every other time the outer           6     Clean the canister
element is replaced. As a reminder, put a mark on the
inner-element with a felt tip pen when you only replace the           Clean the inside of the canister C and dust valve D
outer-element.                                                        K Fig 36. ( T 3-40).

1    Stop the engine. Refer to K Prepare the Machine             7    Fit a new element.
     for Maintenance ( T 3-13).
                                                                      Insert the new element into the canister. Make sure it
2    Clean the pre-cleaner.      K Cleaning     the   Pre-            seats correctly. Check all hoses for condition and
     Cleaner ( T 3-38).                                               tightness.

3    Open the side cover to access the air cleaner.


                                                      E                      G                  B


                             C


                                                                                               D

                                                                                                                      D023849
                                                           Fig 36.


3-40                                                      9813/1650                                                  3-40

--- Page 12 ---
Section 3 - Routine Maintenance
                                                                                               Routine Maintenance
                                                                                                               Hydraulic System

Hydraulic Tank Cap/Breather                                        Changing the Return Line Filter Element
The hydraulic tank cap/breather (and filter) forms an
integral part of the hydraulic tank cap B. Replace the cap
                                                                                       !MWARNING
(and breather filter) with a new one at the recommended                             Fluid Under Pressure
interval. K Fig 45. ( T 3-50).                                     Fine jets of fluid at high pressure can penetrate the
                                                                   skin. Keep face and hands well clear of fluid under
                                                                   pressure and wear protective glasses. Hold a piece of
                                              B                    cardboard close to suspected leaks and then inspect
                                                                   the cardboard for signs of fluid. If fluid penetrates your
                                                                   skin, get medical help immediately.
                                                                   INT-3-1-10_2

                                                                   1    Refer   to   K Prepare           the      Machine     for
        D                                                               Maintenance ( T 3-13)

                                                                   2    Remove the hydraulic tank filler cap.

                                                                   3    Remove the nuts C, cover plate D and seal E.

          E                                                        4    Remove the complete element assembly F and the
                                                                        seal.

                                                                   5    Remove the nut and spring K.
                           Fig 45.
                                                                   6    Remove the filter element L from the spindle and
The cap incorporates a side mounted barrel lock that is                 clean magnets J.
operated by the ignition/door key. It is important to note
that the seal must be in good condition and correctly              7    Install the new element L and the new seals G and H.
installed in the cap.
                                                                   8    Put the cover plate D in position and tighten the nut C.
Fit the Cap
                                                                   9    Add the recommended hydraulic fluid to the correct
Insert the key and turn anticlockwise D, screw the cap on               level.
until resistance is felt then turn a further quarter of a turn,
turn the key clockwise E and remove the key. With the key          10   Attach the filler cap and make sure its tight.
removed the cap will rotate and can not be undone.

Remove the Cap                                                                                   J
                                                                                  C
Insert the key and turn anticlockwise D, unscrew the cap                                       G
K Fig 45. ( T 3-50).
                                                                                                   H
Note: The key must be inserted in the cap when removing
                                                                                  D
                                                                                                 L
and fitting.                                                                       E                 F


                                                                                                     K
                                                                                             Fig 46.


3-50                                                        9813/1650                                                       3-50

--- Page 13 ---
Section B - Body and Framework
                                             Contents


       Contents                   Page No.


B-ii                                              B-ii

--- Page 14 ---
Section B - Body and Framework
                                                                                               Body and Framework
                                                                                                Boom Assembly Overview
Retracting the 4th Stage Boom inside the Boom                            base, it will also pull the 4th stage boom inside the
Assembly                                                                 boom assembly.

Refer to following instructions carefully before trying to         Note: Do not operate the winch at high speed; operate it at
retract the 4th stage boom inside the boom assembly; Use           idle rpm (750-800) only.
a suitable platform/ramp to access and carry out the 4th
stage boom retraction.

1    Remove the securing pin H between inner boom G
     and 4th stage boom E rear side. K Fig 13. ( T B-9)


                                                                                                                       D068540-14
                                                                                             Fig 16.
                                                     D068540-12
                          Fig 14.                                  4     Stop the winch lever operation when 4th stage boom
                                                                         E is completely inside the inner boom G. Re-secure
2    Now lift up the boom assembly slightly by 5ΒΊ-10ΒΊ by                 pin H between inner boom G and 4th stage boom E
     operating the lift ram lever. This is required to ensure            front side.
     smooth retraction of 4th stage boom later.


                                                     D068540-13
                          Fig 15.
                                                                                                                       D068540-15
3    Now operate the winch lever in reverse such that                                        Fig 17.
     snatch block L is fully butting the 4th stage boom E
     nose. After this, keep operating the winch lever in           5     The machine with 4th stage boom in is ready for use
     reverse i.e. pulling the snatch block secured at boom               now.


B-10                                                        9813/1650                                                  B-10

--- Page 15 ---
Section B - Body and Framework
                                                                                            Body and Framework
                                                                     Boom Assembly Service Procedure (Liftall 1253)

Standard Wear Pads Assembly –                                   maintained for the trouble free and smooth extension/
                                                                retraction operation of the boom assembly.
Liftall 1253
                                                                These wear pads are consumable items with a limited life
Different sets of wear pads are provided in boom assembly
                                                                subjected to wear and tear. Change period depends upon
to ensure running clearance among boom members in
                                                                the usage, application and routine maintenance of the
assembled condition. These clearances need to be
                                                                boom assembly.


                                                                                                       B1

                                                                               A1 B2


                                                                                  A3

                   A                                                                   B3
                                                            A2
                                                             A4            B

                                          A6


                                     A5


                                                                                                 B4

                                                     C            B6                                  B5


                                                                                                                 D068540-25
                                Fig 27. Standard Wear Pad Assemblies in Liftall 1253
 A1, A2 and A3     Between outer boom A and middle
                   boom B front side.
 B1, B2, and B3    Between outer boom A and middle
                   boom B rear side.
 A4, A5, and A6    Between middle boom B and inner
                   boom C front side.
 B4, B5, and B6    Between middle boom B and inner
                   boom C rear side.


B-20                                                     9813/1650                                               B-20

--- Page 16 ---
Section B - Body and Framework
                                                                  Body and Framework
                                               Boom Assembly Service Procedure (Liftall 1202)


                  A1                 B1


          A
                                                                        A3
          C


          B2


                                          B3
        A2


                                                                                       D068540-71
       Fig 34. Standard Wear Pads Assembly Arrangement – Liftall 1202


B-30                             9813/1650                                             B-30

--- Page 17 ---
Section B - Body and Framework
                                                                                                                    Body and Framework
                                                                                     Boom Assembly Service Procedure (Liftall 1554)
                                                                               Note: Ensure that the pulleys, guards are not damaged
                                        2                                      and fitted properly. Always replace if damaged, bent or
                                                                               broken otherwise it can lead to winch rope jumping out
                                                                    15         pulley and getting damaged.
                                                 8        14

                 10                         14                                                  5                        11
                                        1
                                9
                                                                                                                          8
                                                                                       12
                                                                   14                    8
                                                          14
                                                 15                                                     2   5

                                                     12
                                                                                       7
      7
                                                                                                                7
 11                                                                                         2       6

                            5                                                              9
                 4      7
                                                                                                                              11
                 11                                                                                                            8
     13 5
                                                                                                                                        3
                                                 6
                                    4
                        13
                                                               D068540-36
                                                                                                                     2
      Fig 45. Intermediate Boom Pulley Installation
Item      Description                                          Qty.                                                                    10
1         Inner boom pin                                       1                                                                   4
2         Guide rope                                           2                                                                            D068540-37
                                                                                           Fig 46. Intermediate Wear Pad Assembly
3         Bolt M24 x 50                                        2
                                                                                Item        Description                                 Qty.
4         Tapped boss                                          4
                                                                                1           Adjuster assembly
5         Clamp nut                                            2
                                                                                2           Setscrew M19 x 20mm
6         Middle boom pulley                                   4
                                                                                3           Wear pad spacer 12mm
7         Ball bearing deep groove                             4
                                                                                4           Wear pad
8         Pulley assembly                                      1
                                                                                5           Wear pad
9         Lock nut                                             1
                                                                                6           Wear pad 150 x 75 x 14.25mm
10        Loctite 262                                          1
                                                                                7           Wear pad 45 x 150 x19mm
11        Grub screw M10 x 50 long                             4
                                                                                8           Plain washer
12        Bolt M10 x 80                                        1
                                                                                9           Plain washer
13        Bolt                                                 2
                                                                                10          Wear pad assemble 2mm
14        Pulley spacer                                        4
                                                                                11          Screw M12 x 35mm
15        Pulley shim                                          2
                                                                                12          Setscrew


B-40                                                                    9813/1650                                                           B-40

--- Page 18 ---
Section B - Body and Framework
                                                                                        Body and Framework
                                                                   Boom Assembly Service Procedure (Liftall 1554)


                                               A1       B1               2 mm
                                    A4
                                                                  B4
                                                                                  2 mm


              2.5 mm


                                                                                               3 mm
                           A             B7
                                                                                                  B5
                                                             A8                                     A3
                               B

                                                             C
                                                                                                       A6
                                                         D
                               B8


                            B2                                A7

                2.5 mm                              B6
            2 mm      A2                                                               3 mm
                                                                  A5
                                                                       B3
                                                                                         4 mm


              2 mm

                                                     Fig 59.

To Adjust the Clearance from Top and Bottom Sides of         increased, then shimming can be done by removing the
the Boom Members                                             pad and adding the shim below wear pads A1 and A4. This
                                                             will ensure that boom assembly clearance is restored to its
Inspect the wear pads A1, A2, A4, A5, and A7. If pads        original condition. Use shims properly while fixing the
have worn-out and clearance among boom members have          clearance. However If pads have worn-out, and pad insert/


B-50                                                9813/1650                                                    B-50

--- Page 19 ---
Section B - Body and Framework
                                                                                                      Body and Framework

View the complete manual on HeyDownloads β†’