PDF Service Manual Terex AL5 AL5000 Light Tower - 558 KB

Keep your Terex AL5 and AL5000 series light towers in perfect working order with this complete service manual.

This guide covers models with Tier 4 engines and provides detailed instructions for troubleshooting, repair, and maintenance.

It includes electrical and hydraulic schematics, making it an essential resource for technicians.

Proper servicing using this manual will ensure reliable performance on any job site.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
Service Manual


AL5
AL5 with Tier 4
AL5000


                  Part No. 116476
                  Rev B
                  April 2015

--- Page 3 ---
April 2015                                                                                                  Service Manual

                                                                                                       Specifications
Section 2                       Specific ati ons


Machine Specifications                                                 Generator Options
Machi ne Specific ations                                               Performanc e Specific ati ons


Total lighting wattage                             4 x 1000 watts      Marathon 8 kW 201CSA5412
Fuel capacities                                                        Generator rpm @ full load             60Hz, 1800 rpm
Single tank                                            30 gallons      Temperature, ambient maximum                   104° F
                                                        114 liters                                                     40° C
Large tank (option)                                    60 gallons      Power                                           8 kW
                                                        227 liters     Marathon 8 kW 201CSA5420
Tires and wheels
                                                                       Generator rpm @ full load             60 Hz, 1800 rpm
Tire size                                          ST205/75D15         Temperature, ambient maximum                   104° F
Load range                                                      C                                                      40° C
Lug nut torque, dry                                      90 ft-lbs     Power                                           8 kW
                                                         122 Nm        Marathon 12 kW 281CSL1513
Lug nut torque, lubricated                             67.5 ft-lbs     Generator rpm @ full load             60 Hz, 1800 rpm
                                                        91.5 Nm
                                                                       Temperature, ambient maximum                   104° F
Performance Specifications
Performanc e Specific ati ons


                                                                                                                       40° C

Tongue weight, maximum                                                 Power                                          12 kW
                                                                       Marathon 20 kW 334CSA3028
With fuel (single tank)                                   150 lbs
                                                           68 kg       Generator rpm @ full load             60 Hz, 1800 rpm
With fuel (large tank)                                    130 lbs      Temperature, ambient maximum                   104° F
                                                           59 kg                                                       40° C
Run time                                                               Power                                          20 kW
Single tank                                             50 hours       For operational specifications, refer to the
Large tank                                             100 hours       Operator's Manual.
For operational specifications, refer to the                           Continuous improvement of our products is a
Operator's Manual.                                                     Genie policy. Product specifications are
                                                                       subject to change without notice or obligation.
Continuous improvement of our products is a
Genie policy. Product specifications are
subject to change without notice or obligation.


Part No. 116476                                                  AL5                                                      1

--- Page 4 ---
April 2015                                                                                       Service Manual

                                         Scheduled Maintenance Procedures

Maintenance Symbols Legend                                   Pre-delivery Preparation Report
Note: The following symbols have been used in this           The pre-delivery preparation report contains
manual to help communicate the intent of the                 checklists for each type of scheduled inspection.
instructions. When one or more of the symbols
appear at the beginning of a maintenance                     Make copies for each inspection. Store completed
procedure, it conveys the meaning below.                     forms as required.

        Indicates that tools will be required to             Maintenance Schedule
        perform this procedure.
                                                             The Scheduled Maintenance Procedures section
                                                             and the Maintenance Inspection Report have been
        Indicates that new parts will be required to         divided into subsections. Use the following chart to
        perform this procedure.                              determine which group(s) of procedures are
                                                             required to perform a scheduled inspection.

        Indicates that dealer service will be                Inspection                                 Checklist
        required to perform this procedure.                  Daily or every 8 hours                              A
                                                             Quarterly or every 250 hours                   A+B

        Indicates that a cold engine will be                 Semi-annually or every 500 hours           A+B+C
        required to perform this procedure.                  Annually or every 1000 hours           A+B+C+D
                                                             Two-year or every 2000 hours       A+B+C+D+E

        Indicates that a warm engine will be
        required to perform this procedure.                  Maintenance Inspection Report
                                                             The maintenance inspection report contains
                                                             checklists for each type of scheduled inspection.
                                                             Make copies of the Maintenance Inspection Report
                                                             to use for each inspection. Maintain completed
                                                             forms for a minimum of 4 years or in compliance
                                                             with your employer, jobsite and governmental
                                                             regulations and requirements.


Part No. 116476                                        AL5                                                    11

--- Page 5 ---
April 2015                                                                                                                                Service Manual

                                                                                                                      Checklist A Procedures

A-11                                                                           A-12
A-11 Perform Engine M aintenanc e                                              A-12 Perform Engine M aintenanc e


Perform Engine Maintenance -                                                   Perform Engine Maintenance -
Kubota                                                                         Kubota


Engine specifications require that this procedure be                           Engine specifications require that this procedure be
performed every 100 hours.                                                     performed every 200 hours.

                                    • Check fuel lines and clamps                                                  • Change engine oil
Required maintenance procedures and additional                                                                     • Replace oil filter
engine information is available in the Kubota
D1105-E and V1505-E Operator's Manual (Kubota                                  Required maintenance procedures and additional
16683-89169 part number )                                                      engine information is available in the Kubota
                                                                               D1105-E and V1505-E Operator's Manual (Kubota
Kubota D-1105 and V-1505 Operator's Manual                                     16683-89169 part number )
Genie part number                                                   893020     Kubota D-1105 and V-1505 Operator's Manual
                                                                               Genie part number                                                  893020


Part No. 116476                                                          AL5                                                                         21

--- Page 6 ---
April 2015                                                                                                                                                           Service Manual

                                                                                                                                         Checklist B Procedures

B-7                                                                               B-8
B-7 Lubric ate the T-bolt                                                         B-8 Ins pect and Adjust the Brak es (if equi pped)


Lubricate the T-bolt                                                              Inspect and Adjust the Brakes (if
                                                                                  equipped)

Terex specifications require that this procedure be
performed every 250 hours or quarterly, whichever                                 Axle specifications require that this procedure be
comes first.                                                                      performed every 3000 miles or quarterly,
Maintaining the T-bolt is essential to good machine                               whichever comes first.
performance and safe operation. An unsafe                                         Maintaining the axle brakes in good condition is
working condition exists if the T-bolt has excessive                              essential to safe operation and good performance.
wear and/or does not operate smoothly, free of                                    Brakes which are out of adjustment can result in
hesitation and binding.                                                           longer stopping distances and excessive brake
1                           Using the illustration as a guide, locate the         wear on the towing vehicle. Component damage
                            T-bolt at the bottom of the mast assembly.            may also result if problems are not discovered and
                            Remove the T-bolt from the mast.                      repaired in a timely fashion.

2                           Remove all dust, dirt and copper anti-seize           Note: Perform this procedure with the machine on
                            from the threaded surfaces of the T-bolt, and         a firm, level surface with the machine in the stowed
                            apply a few drops of light oil or copper              position.
                            anti-seize lubricant onto the threaded
                                                                                  1                                                    Select a wheel. Chock the front and rear of the
                            surfaces.
                                                                                                                                       tire at the opposite side of the machine.
3                           Fully install the T-bolt into the mast.
                                                                                  2                                                    Loosen the wheel lug nuts. Do not remove
                                                                                                                                       them.
                                                                                  3                                                    Place a lifting jack under the axle near the
                                                                                                                                       wheel to be removed. Lift the axle until the
                                                                                                                                       wheel is off the ground and place a jack stand
                                                                                                                                       under the axle. Lower the axle onto the jack
                                                                                                                                       stand and remove the wheel.
                                                                                  4                                                    Remove the dust cap from the hub. Remove
                                                                                                                                       the cotter pin from the castle nut.
                                 a T-bolt
                                                                                  5                                                    Remove the castle nut and washer.
                                                                                  6                                                    Pull the hub off of the spindle. The washer and
                                                                                                                                       outer bearing should fall loose from the hub.


Part No. 116476                                                             AL5                                                                                                    31

--- Page 7 ---
April 2015                                                                                               Service Manual

                                                                                           Checklist D Procedures

D-3
D-3 Perform Coupler M aintenanc e


Perform Coupler Maintenance


Coupler specifications require that this procedure
be performed annually.
Maintaining the coupler in good condition is
essential to safe operation and good performance.
Coupler failure could result in a machine tip-over
during transport, and component damage may also
result if problems are not discovered and repaired
in a timely fashion.

1                                   Check coupler welds and mounting bolt
                                    torque. Torque the fasteners to 35 ft-lbs / 48
                                    Nm.
                                    Result: 1.5 full threads of the locking bolt must
                                    be exposed beyond the lock nut after the
                                    adjustment.
2                                   Apply automotive grease to the coupler ball
                                    pocket.
3                                   Oil coupler pivot points using SAE 30 motor
                                    oil.


Part No. 116476                                                                      AL5                            41

--- Page 8 ---
April 2015                                                                                                                                  Service Manual

                                                                                                                                                   Mast

2-2
2-2 H ow to Disas sem ble the Mas t Assem bly


                                                                                                       7    Working at the top of the 4 inch / 10 cm and
How to Disassemble the Mast                                                                                 3 inch / 7.5 cm sections, use a drill to remove
                                                                                                            the rivets securing the wear pads in position.
Assembly
                                                                                                                          Component damage hazard.
1                                               Remove the mast assembly. See 2-1, How to                                 The mast can be damaged if the
                                                Remove the Mast Assembly.                                                 drill bit used is too large. Select
                                                                                                                          a drill bit only large enough to
2                                               Remove the T-bolt from the 6 inch / 15 cm                                 remove the mandrel from the
                                                round tube assembly.                                                      center of the rivet.
3                                               Remove the nut from the bottom of the mast.
                                                Gently twist and pull the 6 inch / 15 cm round         8    Remove the fasteners securing the pulley and
                                                tube assembly from the mast while pulling the               shim to the 3 inch / 7.5 cm mast section. Set
                                                cable free.                                                 the components to the side.

                                                              Bodily injury hazard. Cables             9    Remove the 2 inch / 5 cm mast section from
                                                              can fray. Always wear adequate                the 3 inch / 7.5 cm mast section.
                                                              hand protection when handling            10   Remove the 3 inch / 7.5 cm mast section from
                                                              the cable.                                    the 4 inch / 10 cm mast section.
                                                             Component damage hazard.                  Note: For ease of assembly, note the location
                                                             Cables can be damaged if they             where each wear pad is removed.
                                                             are kinked or pinched.
                                                                                                       Note: To ensure that the mast extends properly
Remove the large round plastic bushing from the                                                        after assembly, carefully measure the cable to
bottom of the 4 inch / 10 cm mast section.                                                             confirm that the new cable is the same length as
                                                                                                       the old one.
4                                               Remove the 2.5 inch / 6 cm washer from the
                                                bottom of the mast assembly.                           Note: During assembly, carefully install the mast
                                                                                                       cable. Refer to the illustration on the following page
5                                               Pull the mast lock handle fully away from the          for cable routing.
                                                mast, then immediately secure the mast lock
                                                in position using locking pliers or a clamp on
                                                the lock handle to restrain it in position.
6                                               Remove the fasteners securing the pulley and
                                                mast lock to the 4 inch / 10 cm mast section.
                                                Set the components to the side.


Part No. 116476                                                                                  AL5                                                      51

--- Page 9 ---
April 2015                                                                                                                            Service Manual

                                                                                                                                   Generator

7-2
7-2 H ow to Check a Generator C apaci tor


                                                                                                   4   With an ohmmeter set to its highest resistance
How to Check a Generator                                                                               scale, connect the ohmmeter leads to the
                                                                                                       capacitor terminals and observe the reading
Capacitor                                                                                              on the meter. Then, reverse the connections
                                                                                                       and observe the reading on the meter.
                                                         High voltage. Exposure to
                                                         electrical wires or electrical                Result: The meter indicates a very low
                                                         current will result in death or               resistance which then gradually increases
                                                         serious injury. Turn off all power            AND a very high resistance which then
                                                         when not needed for testing. Use              gradually decreases. The capacitor is working.
                                                         extreme caution when working                  Result: The meter indicates a very high
                                                         with high voltage electrical                  resistance which does not decrease. The
                                                         components.                                   capacitor is faulty and should be replaced.
                                                         Electrocution/burn hazard.                Result: The meter indicates a very low resistance
                                                         Attempting to service the                 which does not increase. The capacitor is faulty
                                                         machine before the capacitor is           and should be replaced.
                                                         fully discharged will result in
                                                         death or serious injury.

Note: Be sure the engine has been turned off for at
least 15 minutes before servicing the machine. Use
a voltmeter to confirm there is no residual voltage
in the capacitor.

1                                           Remove the generator capacitor cover.
2                                           Using an insulated conductor or a screwdriver
                                            with an insulated handle, discharge the
                                            capacitor by shorting across the capacitor
                                            terminals. Repeat for the second capacitor, if
                                            equipped.
                                                         High voltage. Exposure to
                                                         electrical wires or electrical
                                                         current will result in death or
                                                         serious injury. Use extreme
                                                         caution when working with high
                                                         voltage electrical components.

3                                           Tag and disconnect the wires attached to the
                                            capacitor(s).


Part No. 116476                                                                              AL5                                                     61

--- Page 10 ---
April 2015                                                                                         Service Manual

                                                                                Diagnostic Charts

Generator produces full voltage Loose or broken lead wires                    Inspect lead wires and connections for
at no load or voltage drops at                                                broken wires and loose connections.
full load
                                  Rotor open or shorted                       Measure resistance between leads..

                                  Stator grounded or shorted                  Contact the Genie Service
                                                                              Department.
Generator voltage too high        HIgh engine speed                           Adjust the rpm
                                                                              Refer to Section 2, Specifications
Generator produces no voltage Faulty surge suppressor                         Disconnect suppressor from circuit. If
at no load or at full load                                                    there is an obvious increase in
                                                                              voltage, replace the suppressor.
                                  Faulty capacitor                            Replace capacitor.

                                  Loss of residual magnetism                  Flash the rotor.

                                  Open winding                                Replace the generator.

Generator will not hold voltage   Machine has been unused for a significant   Flash the rotor.
(loss of residual magnetism)      length of time
                                  Rotor shorting out when the unit gets hot   Inspect rotor windings for broken
                                                                              and/or burned wires.
                                  Pinched leads                               Inspect and repair as needed.

                                  Faulty capacitor                            Replace the capacitor.

                                  Faulty diode                                Replace the diode.

                                  Faulty surge suppressor                     Replace the surge suppressor.


Part No. 116476                                           AL5                                                      71

View the complete manual on HeyDownloads →