PDF Service Manual Suzuki GS500E Twin (1989-1997) - 8 MB
This is a comprehensive service and repair manual for the Suzuki GS500E Twin motorcycle, covering models from 1989 to 1997.
It offers detailed instructions for everything from routine maintenance to a full engine rebuild.
The manual includes wiring diagrams, specifications, and clear illustrations to guide you through every process.
It's an essential resource for both professional mechanics and DIY enthusiasts.
PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
PDF viewer loading area
Text Preview from This Manual
The text below was extracted from the visible preview pages to help you confirm the manual contents before download.
--- Page 3 ---
0-10 Daily (pre-ride) checks
1 Engine/transmission oil level
Beforeyou start
tI' Take the motorcycle on a short run to
allow it to reach normal operating temperature.
Caution: Do not run the engine in an
enclosed$pacesuch as a garageor
~.
tI' Stop the engine and place the motorcycle
on Its centre stand. Allow it to stand
undisturbed for a few minutes to allow the oil
level to stabilise. Make sure the motorcycle is
on level ground.
Bike care: 1 Unscrewthe oil filler cap from the right- 2 Using a clean rag or peper towel, wipe off
. If you haveto add oil frequently.you hand side crankcasecover.The dipstick all the 011from the dipstick, then Insert
should check whether you have any oil leaks. is integral with the oil filler cap, and is the clean dipstick back into the engine,
If there is no sign of oil leakage from the joints
usedto check the engineoil level. but do not screw It In.
and gaskets the engine could be burning 011
(see Fault finding).
3 Remove the dipstick and observe the 4 If the level is below the 'L' line, top the
level of the oil, which should be engine up with the recommended grade
somewhere In between the upper 'F' and and type of oil, to bring the level up to
lower 'L' level lines (arrows). the 'F' line on the dipstick.
2 Battery electrolyte level
Warning: Be extremely careful Before you start: Bike care:
.&. when handling or working
around the battery - the
electrolyte Is very caustic.
tI Position the motorcycle on its centre
stand on levelground. Removethe seat (see
Chapter7) for accessto the battery.
. If the battery electrolytelevel needs
toppingup frequently.it Is likelythat thereis a
problem either with the battery or with the
tI Use distilled water to top up the battery. charging system. Refer to Chapter 8 and
Do not usetap water(ex~ I.nan ern~. investigatethe problem.
. . . and fill each cell to the MAX !evelline
1 The electrolyte level is visible through the
translucent battery case - It should be 2 IfbeRemove
the electrolyteis low the battery must
topped up with distilled water. 3
the cell caps. . .
with distilled water - do not overfill. On
completion, mop up any spills and install
between the upper MAX and lower level
lines (arrows). the cell caps.
--- Page 4 ---
1-8 Every 4000 miles (6000 km) or 12 months
9 Using your fingers, turn the cam follower of IlIu8tr8tions). The shim size should be Obtain and install the replacement shim,
the valve In question so that Its shim removing stampedon its face(... IIlu8tr8tion).A shim notingthat its sizemarkingshouldbe Installed
slot faces backwards (exhaust valve) or size of 250 denotes a thickness of 2.5 mm, downwards and that the shim should be
forwards (intake valve) (... 11I\I8tI'8tIon). 245 is 2.45 mm. It is recommended that the lubricated with engine 011.
10 Fit the tool under the camshaft, making shim is measured to check that It has not 13 Removethe tool from the follower.Rotate
StKe it contacts only the follower and not the worn (Me -..ti o).ShIma ~ avaI~ in the crankshaftseveralturns to seat the new
shim, and pre.. it down to depress the 0.05 mm Increments from 2.15 to 3.10 mm. shim. Checkthe clearanceagain,then repeat
. 12 Using the shim selection chart, find where the process for any other valves until the
11 PrIM the shm out of the foIower ~ a the measured valve clearance and existing ct.'8nCe8 are correct.
small screwdriver inserted In Its slot and shim thickness values intersect and read off 14 Install all disturbed components in a
remove it using a pair of pliers (... the shim size required (... IIlustr8t1on).r8o.wseof the rwnovaI8eCJIBnCe.
--- Page 5 ---
1-18 Non-scheduled maintenance
25.5 Removethe vacuum take-off C8p(arrow) 25.8 Catb~or syndvonisatlon 8CNW (arrow)
must be replaced.Notethat in very~ c-. synchrmslng the C8burettors, m8ce atn the 8 The carburettors are adjusted by turning
the fault could lie in the carburettors rather valve Cleerances are properly set. the synchronlslngscrew situated In-between
than the cable, necessitatingthe removalof 2 To properly synchronlse the carburettors, the carburettors, in the throttle linkage (see
the carburettorsand inspectionof the choke you win need some sort of v.:wm gauge set- illustr8tion). The screw Is accessedusing a
valves(see~.. 3). up with a gauge for each cylinder, or a long screwdriver. Turn the screw until the
manometer, which is a calibrated tube readingon each gaugeIs the same.Note: Do
arrangement that utilises columns of mercury not p~ down on the screw whilstadjusting
or steel rods to indicate engine vacuum. If It, otherwisea false readingwill be obtained.
using a m.-cury manometer, extra When the carburettors are synchronlsed,
precautions must be taken during use and open and close the throttle quickly to settle
storage of the instrument as mercury Is a the linkage,and recheckthe gaugereedings,
liquid, and extremely toxic. Because of the readjustingIf necessary.
Note: T1Je carbu,.uors will go out of 8 Whenthe adjustmentis ~ete, recheck
nature of the synchronlsation procedure and
synchronlsation over 8 period of time, the vacwm readings, then adjust the idle
the need for special Instruments, most 0WI'*8
resulting In decf88sed fuel mileage, Increased speed by turning the throttle atop screw until
leave the task to a Suzuki dealer.
engine temperature, less than Ideal throttle the Idle speed listed In this Chapter'.
3 Start the engine and let It run until It reaches
response and higher vibration /e~. Specificationsis obtained.
normal ~ng tempereture, then shut It off.
.&. Werning: Petrol (ga.ollne) ,. 10 Stop the engine. Remove the gauge
4 ~ the fuel tank (s. Chapter 3).
extremely flammable, .0 take hosesand replacethe take-off caps. Detach
. extra precautionswhen you 5 Remove the vacwm take-off cap from the
the temporaryfuel supply Md install the fuel
top of each carburettor (8.. IlIu8tratlon).
worlc on any part of the fuel tank (seeChapter3).
Connect the gauge hoses to the take-off
system. Don't smoke or allow open frames
adapt«s. Make S(Q there .-e no air leaks as
or bare light bulbs near the worlc area, and
false reedings will ~It.
don't worlc in a garage where a natural
8 Arrange a temporary fuel supply, either by
gas-type appliance Is present. "you spill
any fuel on your skin, rinse it off using a small temporary tank or by using extra
immediately with soap and water. When long fuel pipes to the now remote fuel tank.
you perform any kind of work on the fuel Alternatively. poeitIon the tank on a suitable Note: An improperlyadjusted headlightmay
system, wear safety glassesand have a fire base on the motorcycle, taking care not to cause problems for oncoming traffic or
extinguisher suitable for a Class B type fire scratch any paintwork, and making sure that provide poor, unsafeilluminationof the road
the tank Is safely and securely supported. afield. Seforaadjustingthe hMcI#ght8m, be
.&.
(flammable liquids) on hand.
Warning: Take great care not to 7 Start the 8ngN 81d ~ the lcIe speed sure to consult with local trafflc laws and
,
. burn your hand on the hot
engine unff when accessing the
gauge take-off points on the
to 1750 rpm using the throttle stop screw
under the right-hand carburettor (...
11IU8tr8t1on 8.3). If the gauges are fitted with
regulations. For UK models, refer to 'MOT
TestChecks'in the Refetencesectionon this
Manual.
intake manifolds. Do not allow exhaust dampingadjustment.set this so that the 1 The headlightbeam C8I be adjusted both
gases to build up In the worlc .rea; either needle flutter is just eliminated but 80 that horIzontally~ vertic81y.Checkftm that the
perform the ChKk outside or use an they can stili respond to small changes in tyre preeaur88are correct and the IUSpension
.m.ust gas utractlon system. pressure.Thevacuumreadingsfor both of the is adjustedas~ulred. The machinemust be
1 Carburettor synchronisation is simply the cylindersshould be the same. If the vacuum off its stand 81d on levelground,with the fuel
process of adjusting the carburettors so they readingsVaIY.proceedas follows. tank half full and with an assistantsitt'ng on
pass the same amount of fueVair mixture to Caution: Do not .llow th. engine to the seat. If the bike Is usually ridden with a
each cytinder. This Is done by measuring the overiIHt "n8C8a8ry, stop the engine end passenger on the back, have a second
vacuum produced In each cylinder. Before allow It to cool b8foN starting 8g8/n. assistantto do this.
--- Page 6 ---
2-6 Engine, clutch and transmission
5.10 Pull back the rubber cover (arrow) and disconnect the
starter motor lead from Its terminal on the relay
releasing it from Its clamp on the frame tube. or ties, noting its routing, and coil it on top of pan) (S88 Illustration). Make sure the jack is
Peel back the rubber cover from the relay, the crankcase so that It does not Impede centrally positioned so the engine will not
then unscrew the nut securing the cable to Its engineremoval. topple when the last mounting bolt Is removed.
terminal and disconnect the cable (see 18 Tracethe neutralswitch wiring back from Take the weight of the engine on the jack.
IlIu8tr8tion). Pull the cable back to the starter the top of the sprocketcover and disconnect 18 Unscrew the nuts on the six bolts which
motor, noting its routing, and coil it on top of it at its connector.Releasethe wiringfrom any secure the right-hand side frame downtube to
the crankcase so that it does not impede clips or ties, noting its routing, and coil it on the rest of the frame. then withdraw the bolts
engine removal. top of the crankcase so that it does not (see Illustrations).
impedeengineremoval. 19 Unscrew the nuts on both the upper and
11 Unscrew the gearchange lever pinch bolt
and remove the lever from the shaft, noting 17 At this point, position an hydraulic or lower front engine mounting bolts, then
any alignment marks on the lever and the mechanicaljack underthe enginewith a block remove the right-hand side frame downtube
of wood betweenthe jack headand sump (oil (see Illustrations). Remove the spacers from
shaft (see lIustration). If no marks are visible,
make your own before removing the lever so
that it can be correctly aligned with the shaft
on installation.
12 Remove the front sprocket (Chapter 5).
13 Remove the exhaust system (Chapter 3).
14 Trace the ignition pulse generator and oil
pressure switch wiring back from the base of
the right-hand side crankcase cover and
disconnect it at its connector. Release the
wiring from any clips or ties, noting Its routing,
and coil it on top of the crankcase so that it
does not Impede engine removal.
16 Trace the alternator wiring back from the
top of the sprocket cover on the left -hand side
of the engine and disconnect it at its bullet 5.18a Right-hand side frame downtube is
secured by two bolts at the rear (arrows). . .
connectors. Release the wiring from any clips
5.19a Unscrew the front engine bolt nuts
(arrows) ...
--- Page 7 ---
the nuts evenly and a little at a time in a 12 Fit a new O-ring onto each cylinderhea:d 14 Carefullylower the cylinderhead over the
reverse of their numerical sequence until they stud and press it into its recessin the top of studs and onto the block (see illustration). It
are all slack. Remove all the nuts and their the cylinder block (see illustration). Check is helpful to have an assistant to pass the
washers, taking great care not to drop any of that they are properlyseated. camchain up through the tunnel and slip a
them into the crankcase. Discard the washers 13 Ensure the cylinder head and block piece of wire through it to prevent It falling
as new ones must be used. mating surfaces are clean, then lay the new back into the engine. Keep the chain taut to
6 Pull the cylinder head up off the studs. If it head gasket in place on the cylinder block, prevent It becoming disengaged from the
is stuck, tap ~round1he joint faces of the makingsure all the holesare correctlyaligned crankshaftsprocket.
cylinder head with a soft-faced mallet to free and that the UP letters stamped out of the 15 Install the eight domed nuts using new
the head. Do not attempt to free the head by gasket read the correct way round (He washers and tighten them finger-tight (...
inserting a screwdriver between the head and Illustrations). Neverre-usethe old gasket. illustrations).
cylinder block - you'll damage the sealing
surfaces.
7 Lift the head off the block, and remove it
from the engine. Remove the old cylinder
head gasket and the O-rings which fit around
the cylinder head studs (see Illustration).
Stuff a clean rag into the camchaln tunnel to
prevent any debris failing Into the engine.
Discard the gasket and O-rings as new ones
must be used.
8 If they are loose, remove the two dowels
from the cylinder block studs (see illustration
11.7). If eIther appears to be missing it is
probably stuck in the underside of the cylinder
head.
11.13a Fit the new cylinder head
9 Check the cylinder head gasket and the gasket...
mating surfaces on the cylinder head and
block for signs of leakage, which could
indicate warpage. Refer to Section 13 and
check the flatness of the cylinder head.
10 Clean all traces of old gasket material
from the cylinder head and block. If a scraper
is used, take care not to scratch or gouge the
soft aluminium. Be careful not to let any of the
gasket material fall Into the crankcase, the
cylinder bores or the 011pa8$8ges.
Installation
11 If removed, install the two dowels onto the
cylinder block studs (see Illustration). 11.13b... makingsurethe UPmark 11.14 Lowerthe cylinder heed
Lubricate the cylinder bores with engine oil. (arrow)readscorrectly onto the block
--- Page 8 ---
2-26 Engine, clutch and transmission
17.3 The crankcase cover is secured by
thirteen bolts (arrows).Note the positions
of the wiring clips on three of the bolts (A)
17.4 Note the positions of the two dowels
(an'Ows) and remove them if they are loose
hand side crankcase cover (see illustration).
Remove the COY«. Using a 19 mm spanner to
counter-hold the tflnlng rotor, unscrew the bolt
in the centre of the rotor which secures it to the
end of the crankshaft (s.. illustration).
Remove the rotor, noting how the pin In the
end of the crankshaft ~es in the slot In the
rotor. The pulse ~r coil assembly and oil
pressure switch can remain In the crankcase
cover, but the wiring must be disconnected at
its connector behind the left-hand side panel
and released from any clips or ties to enable
the cover to be moved away from the machine.
3 Working in a criss-cross pattern, evenly
slacken the right-hand side crankcase cover
retaining bolts, noting the position of the cable
clips (see Illustration). Ufl the cover away
from the engine, being prepared to catch any
residual oil which may be released as the
cover Is removed.
4 Remove the gasket and discard It. Note the
positions of the two locating dowels fitted to
the crankcase and remove them for safe-
keeping If they are loose (8M illu8b'8tion).
5 Working In a criss-cross pattern, gradually
and evenly slacken the clutch pressure plate
retaining bolts until spring pressure Is
released (see illustrations). To stop the
clutch from turning while Initially loosening the
bolts, either put the engine Into gear and have 1 Pressureplate bolt 7 Pushrodend piece 13 Outerthrostwssher18 Innerthrostwaher
8 Frictionplates '. 14 Clutchhousing 19 Pu8hrods
an assistant apply the rear brake (If the engine 2 Spacer
is In the frame), or jam the primary drive and 3 Spring 9 Pls/nplates 15 PIn 20 Pushrodoil s8&I
driven gears together using the blade of a 4~p/8te 10 Clutchnut 16 ONpump drfVegesr2'1 RetaInerpIete
large screwdriver (If the engine has been 5 ThnIstwasher 11 LocIcwasher 17 Cftdfp 22 R-.. ~
removed). Remove the bolts, spacers and 6 R8#88Sebesrlng 12 Clutchcentre
--- Page 9 ---
2-36 Engine, clutch and transmission
2O.11cThe ! as shown
M88mbly onto the crankcase, positioning the from the top of the engIM sprocket00Y8'and 4 Withdraw the starter idle/reduction gear
stopper arm roller onto the neutral change pin disconnectIt at the connectors.Releasethe shaft then remove the gear, noting which way
and hooking the return spring Into the hole in wiringfrom any clips or ties. round It fits (8M IIkJsb'8tlon). Remove the
the input shaft bearing retainer plate (... 2 Unscrew the gearchangelever pinch bolt att.-nator rotor (see Chapter 8). The starter
~ at. Tighten the bolt securety. Make and remove the lever from the shaft, noting driven gear shOI.Adcome away with the rotor. If
sure the stopper arm Is free to move and Is any alignment marks on the lever and the it doesn't, remove it from the crankshaft. The
returned by the presaure of the spring. shaft (8M lIu8tr8tlon 18.18).If no marksare starter clutch Is secured to the back of the
12 Install the engine sprocket cover and visible, make your own before removingthe rotor by thrM Allen bolts (..Ih8Ir.~.;.
tighten Its screws securely. Install the lever so that it can be correctly aligned with
gearchange !eYeronto tt1e end of tt1e shaft on the shaft on Installation. Unscrew the bolts Inspection
the left-hand side of the engine, alignIng the securing the engine sprocket cover to the 5 Install the starter driven gear into the starter
punch mart<8on the arm and shaft, and check crankcase and move the cover aside (see clutch (If removed) and, with the rotor face
that the ~Ism ~ correctly. ~M ~~uOHi 18.1bt.Thereis no needto detach down on a workbench, check that the gear
the clutch cable from the cover. ReIeesethe rotates freely in an anti-clockwise direction
alternator wiring from the clamp next to the and locks against the rotor in a clockwise
direction. If it doesn't, replace the starter
clutch.
e Withdraw the starter driven gear from the
starter clutch. If it appears stuck, rotate it antl-
to clockwise as you withdraw It to free it from the
starter clutch. Ch~k the bearing surface of
Note: The starter clutch and Idle gear the starter driven gear hub arxj the condition
assembly can be removed with the engine In of the rollers inside the clutch body (...
the frame. Illustrations). If the bearing surface shows
signs of excessive wear or the rollers are
Removal damaged, marked or flattened at any point,
1 Remove the left-hand side panel (see they should be replaced.
Chapter 7). Trace the alternator wiring back 7 Remove the rollers and check the plungers
21.3
--- Page 10 ---
2'46 Engine,clutchandtransmission
Output shaft a Inspectthe dogs and the dog holesIn the and the spacer(see ilklStratlon).If one is not
. gears for cracks, chips. and excessivewear available,carefullyleverthem off using a pair
Disassembly especiallyin the form of roondededges.Make of tyre levers(8M HkJStratIon-'1:1»). Install
21 Removethe needlerollerbearingfrom the sure mating gears engageproperly. Replace the bearing using a press. Install the needle
right-handend of the shaft (lee ilklSb'ation). the pairedge.-s as a set if necessary. mi. bearingonto the shaft, and check It fa
22 Removethe thrust washerfrom the right- 00 Checkfor signsof scoringor bluingon the play or roughness.Replacethe bearingif It is
hand end of the shaft, then slide the 1at gear ~k)ns. bushand shaft.ms ~ be caused wa'n or damaged.
pinionand the 5th gearpinionoff the shaft. by overtleatingdue to Inadequatelubrication. 34 Check the washersand replaceany that
ZJ Removethe clrdip s«:uring the 4th gear Checkthat all the ~ holes ~ ~ are are bent or appear weakened or worn,
pinion.then slide the spiinedwasherand the clear. DIscardall the circlips as new ones must be
pinionoff the shaft. 31 Check that each pinion moves freely on used.
24 Slide the two lockwashersoff the shaft, the shaftor bush(2ndgear pinion)but without
noting how they fit, followed by the 3rd gear unduefreepiay.Checkthat the 2nd gearbush
pinionarxjthespiinedwasher. moves
freelyontheshaft00twithoutundue
25 Removethe clrclip securingthe 6th gear freepiay,
pirjoo, ttMJ'1
Pde the pirQ! off the shaft. 32 The shaft is unlikely to sustain d.a"'age
. Removethe Circlipsecuringthe 2nd gear unless the engine has seized, placing an
pinion,then slKiethe 2nd gear bush and the unusuaIly,highloadingon the msmission. or
pinionoff the shaft, the machinehas covereda very high mileage.
Check the surface of the shaft, especially
Inspection wherea pinionturns onit. andreplace the
27 Washall of the components in clean shaft If It has scored or picked up. or if there
solventanddrythemoff. areanycracks.
. Checkthe gearteethfor cracking33 Checkthe ball bearingfor playor
chipping, pitting and other obvious wear or roughness,and that it is a tight fit on the shaft.
d8nage. Any pinionthat is dsnaged as such Replace the bearing if it is worn, loose or ~.33 Use a puller and draw the spacer off
must be replaced. tiom'anM linin 1 -" . .
--- Page 11 ---
Engine.clutchandtransmission
3O.23b ... making sure the tab locates in the notch (arrow),
and lubricate them generously
not removethe bolts from the connecting
-
31 Connecting rods removal, .:1\
rods.Keepthe rod,cap.nutsand(iftheyare
inspectionand installation ~ to be reused)the bearingshellstogetherIn
~ their correct positionsto ensurecorrect
~ installation.
Note:To removethe connectingrods the Inspection
5 Check the connectingrods for cracks and
the crankcasesseparated.
otherobviousdamage.
6 If not alreadydone (see Section 15),apply
cleanengineoil to the piston pin, insertit into
1 Remove
thecrankshaft
(seeSection29).
the connecting rod small-end and check for
from the
any freeplay between the two (see illus-
tration).Measure the pin external diameter
andthe small-endborediameterand compare
the measurements to the specificationsat the
beginning of the Chapter (seeillustrations
and 15.13band 15.13d).Replacecomponents
that areworn beyondthe specifiedlimits.
7 If the side clearance measured in Step 2
exceedsthe service limit specified, measure
the width of the connectingrod big-end and
the width of the crankpin (see illustrational.
Comparethe results to the specificationsat
the beginning of the Chapter, and replace
whichever component exceeds those
specifications.
--- Page 12 ---
(e) tel tOI!d '(V) tel u!ew S"L
(MOJJe) .e)j:>os ~! JO .no
AIQwesse .eoIJ 84. Ull AtI"J8Je:) 8L" L
6uOIB M9J:>S .Ol!d 94. 9AOW9J pUB MeJ:>SUn '(UOI~4Snll! pUB JOU9JnqJe:> 9~~ ~O esBq 9~~ O~ J9qWB~:>
&&.) tel U!SW e4t ehOWeJ pus MSJ:>SUn9 ~BOI~ 9~~ 6u!Jn:>as SM9J:>S 9~~ M9J:>SUn 9
'(IU'H seuMH 998) peqJn~S!p eq II!M 6U!Ues S.!
~B4.e.ou ~nq.JOU9JnqJB:> 94~ WOJ. peAOWSJ 'pesn aq tsnw "U! pe"U S!
d!l:l-3 a4~ ~:I~OU ~:>!~M 9~OU 'alpeeu 9~~ WOJj
sq UB:> MSJ:>S ~Ol!d S4~ 'SlepOw ~n UO 1-1- suo Meu S se 6uIJ-O e4} pJs:>S!Q'(uo!~~nll! p9/10W9J 9JB A8~~ ~I .Ja~seM pUB d!l:l-3 '~89S
.(SoL uOI~~nIH &&.) 6u!J-O St! pus tees shieh elpeeu
6UIJdS 94t aSOI O~ ~OU9m:> 9)fBl "(UOAeJlSRIII
...) ~er ~Ol!d 94. SAOW9J pUB M9J:>SUn 01- teou e4} ehowe~ '(uo!lB.q8nlll ees) stJ~t! MO4
9P!n6 84~ WOJJ~! 9AOWSJ pUB 6u!toU leol~ elIt uo qBt e4t wOJJehlsh elpeeu ees) do~ 94~ WOJ~~! MBJp~~IM pUB UO~S!da~~
e4t )jOO4Un 'pesn eq tsnw QUOMeu e se t! ~O WOuoq 9~~ WOJ~dn alpeeu ~ar a~~ 4snd 9
WOuoq 94~ WOJJdn t9! elp&eU 94~ 4Snd .pesn
sq tSnW SUO MSU B SB sp!n6 S4t JO WO~toq pJB:>S!Ppus 6uIJ-O e4t ehowe~ '(uO!~84Snll! "pe8ewep
e4~ uo 6U!J-O e4~ pJB:>S!O .hpOq JOUSJnqJB:> ..s) St!J t! MO4 6u!tou .ApOq JotteJnqJe:> A"1I5ee 5! Jf s~ w8eJlld~!p .IIJ 83e/ds!p
S4~ O~UIS~USPln6 e4t punOJ hBM 4:>14M S~ON oJ JueWnJISUI dlells ~ esn Jou oa :UOlJnBo?
e4t Jo tno AIQWesseteolj e4t es!Jd AlinJeJsQL
iUO!~Snlll .M) JOueJnqJB:> e4t .0 dOt 94. 'pesn eq tsnW euo Meu e ss t! pJs:>S!PpUB "(uo!l.4snlll ees)
46noJ4. UMeJP4tIM aq MOU ue:> ~e! 9\pa9U pUB te)jse6 JeqqnJ e4t ehOW9~ '(uOI~J~nlll ees) AlqwesSB UO~S!dpUB W6BJ~dB!P 94~ MBJP4~M