PDF Service Manual New Holland EC130 Crawler Excavator - 7 MB
This is the complete service manual for the New Holland EC130 Crawler Excavator.
It contains detailed, factory-approved procedures for repair and maintenance.
Technicians will find all the necessary information, including hydraulic schematics, electrical diagrams, and troubleshooting guides.
This manual is the definitive resource for keeping your EC130 excavator performing at its best.
PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
PDF viewer loading area
Text Preview from This Manual
The text below was extracted from the visible preview pages to help you confirm the manual contents before download.
--- Page 1 ---
EXCAVATOR
E130
SERVICE
MANUAL
87360591 NA
Issued 01-2006
www.newhollandconstruction.com
--- Page 3 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 1 - GENERAL INFORMATION AND SAFETY
CNH America, LLC reserves the right to make improvements in design or changes in specifications at any time without incurring any
obligation to install them on units previously sold.
All data given in this publication is subject to production variations. Dimensions and weights are only approximate. Illustrations do
not necessarily show products in standard condition. For exact information about any particular product, please consult your Dealer
Revision History
Issue Issue Date Applicable Machines Remarks
First Edition 01-2006 E130 5-1290 NA
1-II Issued 01-06 Bur 5-1290 NA
--- Page 4 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 1 - GENERAL INFORMATION AND SAFETY
6. Unit Conversion
QUANTITY GRAVITATIONAL SI CONVERSION FACTOR
Mass kg kg
Force kgf N 1 kgf=9.807 N
Torque kgfΒ·m Nm kgf m=9.807 Nm
Pressure kgf/cm2 MPa 1 kgf/cm2=0.09807 MPa
Motive Power PS kW 1 PS=0.7355 kW
Revolution rpm minβ1 r/min *1
*1 Units that are allowed to use.
1-10 Issued 01-06 Bur 5-1290 NA
--- Page 5 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 2 - SPECIFICATIONS
2.2.2 TRANSPORTATION DIMENSIONS AND WEIGHT
CH02-06-01 Figure 4
2-8 Issued 01-2006 Bur 5-1300 NA
--- Page 6 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 2 - SPECIFICATIONS
2.4.1 ENGINE CHARACTERISTIC CURVE
CH02-16-01
2-18 Issued 01-2006 Bur 5-1300 NA
--- Page 7 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 3 - ATTACHMENT DIMENSIONS
3.2.2.2 CLEARANCE IN THRUST DIRECTION ON ARM AND CYLINDER INSTALLATION SECTION
CH03-08-01 Figure 6
3-8 Issued 01-2006 Bur 5-1310 NA
--- Page 8 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 11 - TOOLS
CNH America, LLC reserves the right to make improvements in design or changes in specifications at any time without incurring any
obligation to install them on units previously sold.
All data given in this publication is subject to production variations. Dimensions and weights are only approximate. Illustrations do
not necessarily show products in standard condition. For exact information about any particular product, please consult your Dealer
Revision History
Issue Issue Date Applicable Machines Remarks
First edition 01-2006 E130 5-1320 NA
11-II Issued 01-2006 Bur 5-1320 NA
--- Page 9 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 11 - TOOLS
11.5.2.4 PLUG FOR ORS JOINTS
CH11-08-01 Figure 16
CH11-08-02 Figure 17
11-10 Issued 01-2006 Bur 5-1320 NA
--- Page 10 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 11 - TOOLS
11.14 TRACK SPRING SET JIG
CH11-17-02 Figure 31
11-20 Issued 01-2006 Bur 5-1320 NA
--- Page 11 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 12 - STANDARD MAINTENANCE TIME TABLE
12.2.4 TRAVEL SYSTEM, ELECTRIC EQUIPMENT
CH12-08-01 Figure 5
12-8 Issued 01-2006 Bur 5-1330 NA
--- Page 12 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 13 - MAINTENANCE STANDARDS AND TEST PROCEDURES
13.2 PERFORMANCE INSPECTION STANDARD TABLES
CH13-04-01 Figure 1
13-4 Issued 01-06 Bur 5-1340 NA
--- Page 13 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 13 - MAINTENANCE STANDARDS AND TEST PROCEDURES
13.6.1.1 PARKING BRAKE PERFORMANCE
1. Confirm the parking brake holds when the
machine is stopped in a no-load travel position
on a 15 degree gradient slope.
2. Place an angle meter on the shoe plate and
confirm that it shows an angle of more than 12
degrees. Hang a perpendicular rod parallel with
the guide frame rib on the track frame. Put a
matching mark on the shoe plate. Five minutes
after the engine stops at park, measure the
movement distance of the matching mark.
13.6.1.2 DRAIN RATE OF TRAVEL MOTOR
1. Measure the drain rate of the travel motor and
confirm the performance of the travel motor.
2. Preparation:
A. Apply stopper pins for both travel sprockets of
left and right.
B. Stop the engine, and release air in the
hydraulic reservoir.
C. Connect a hose to the drain port of travel
motor and place in a container.
D. Install a plug to the drain line at the tank side.
WARNING: Make sure of the rotating
direction of travel motor. Otherwise, rib βAβ
may be broken by the stopper pin.
3. Measurement conditions:
β’ Engine: High Idle
β’ Hydraulic oil temperature: 45 to 55Β°C
(113 to 131Β°F)
β’ Machine posture: Locked travel and over
running the relief on the travel motor
4. Measure the drain volume of oil for 30 seconds.
Take three measurements in the forward motion
o f e a c h s i d e a n d t a ke a n ave ra g e o f t h e
measured value.
CH13-14-01 Figure 11
13-14 Issued 01-06 Bur 5-1340 NA
--- Page 14 ---
SECTION 1 - STANDARD SPECIFICATIONS AND MAINTENANCE
CHAPTER 13 - MAINTENANCE STANDARDS AND TEST PROCEDURES
NOTES
13-24 Issued 01-06 Bur 5-1340 NA
--- Page 16 ---
SECTION 2 -HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 21 - MECHATRO CONTROL SYSTEM
CH21-07-02 Figure 10
21-14 Issued 01-06 Bur 5-1520 NA
--- Page 17 ---
SECTION 2 -HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 21 - MECHATRO CONTROL SYSTEM
CH21-13-02 Figure 18
21-24 Issued 01-06 Bur 5-1520 NA
--- Page 18 ---
SECTION 2 -HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 21 - MECHATRO CONTROL SYSTEM
21.2.6.1 GOVERNOR MOTOR (SYMBOL M-S)
CH21-18-02 Figure 28
21-34 Issued 01-06 Bur 5-1520 NA
--- Page 30 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
24.1.1.2 HYDRAULIC CIRCUIT DIAGRAM
C24-04-01 Figure 2
24-4 Issued 01-2006 Bur 5-1380 NA
--- Page 31 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
C24-14-01 Figure 16
The feed back lever (611) is linked with the servo
piston and sleeve (651). As the servo piston moves
to the left, the feed back lever rotates on point A
which causes the sleeve to move to the right. As the
servo piston moves to the right, the feed back lever
rotates on point A to move the sleeve to the right.
This causes the spool sleeve opening to close
gradually and the servo piston settles down when the
opening of the spool sleeve closes completely.
FLOW DECREASE FUNCTION
As the command current I decreases, the secondary
p r e s s u r e o f t h e s o l e n o i d p r o p o r t i o n a l va l ve
decreases. This causes the spool to move to the left.
When the spool (652) has moved, delivery pressure
P1 reaches port Cl via the spool and is admitted to
the large diameter chamber of the servo piston.
Deliver y pressure P1 is admitted to the small
diameter section of the servo piston at all times. The
servo piston moves right to decrease the tilting angle
(a). As the servo piston moves to the right, the feed
back lever rotates on point A to move the sleeve to
the left. The sleeve will move until the opening of the
spool closes completely.
24-14 Issued 01-2006 Bur 5-1380 NA
--- Page 32 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
24.1.2.3 PILOT VALVE (TRAVEL)
CH24-25-01 Figure 32
24-24 Issued 01-2006 Bur 5-1380 NA
--- Page 33 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
CH24-35AF-02
24-34 Issued 01-2006 Bur 5-1380 NA
--- Page 34 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
C24-34-01 Figure 49
24.1.8.0.2 FUNCTIONS FOR TRAVEL ACTION At the same time, the pressurized oil delivered by
Independent travel pump (P2) passes between the outer circumference
of the left travel straight spool (306) and the casing
If forward travel is performed, the secondary pilot and runs to port BL. This oil supplies the left travel
pressure from ports (2) and (4) of the travel pilot motor (A) in the same way the pressured oil is
valve act upon ports PBr and PBL of the control valve supplied to the right side travel motor.
and moves the right and left travel spools (306).
The oil which has returned from right travel A and the
The pressurized oil delivered by pump (P1) flows to l e f t t r ave l B s i d e p a s s e s b e t we e n t h e o u t e r
the main passage (51) past the travel straight spool circumference of the right and left travel spool (306)
(307) and passes between the outer circumference and the casing from ports Ar and AL and returns to
of the right travel spool (306) and the casing. This the hydraulic tank via the tank port (T) of the low
pressurized oil is supplied to the right travel motor B pressure circuit (D).
by way of port Br.
The pressurized oil works the same way in reverse
as in forward (when the secondary pilot pressure
acts upon ports PAr and PAL of the control valve.
24-44 Issued 01-2006 Bur 5-1380 NA
--- Page 35 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
CH24-45-01 Figure 59
24.1.8.3.3 ARM IN OPERATION UNDER HEAVY The hydraulic oil that flowed into the arm recirculation
LOAD spool (310) does not flow to the arm cylinder head
When the arm is operated under a heavy load, the (H) that is heavily loaded, but flows to tank port (T)
arm oil recirculation function is effective as when the from low pressure circuit (D) and returns to the
arm cylinder is operating under a light load. hydraulic oil tank.
The control valve switches automatically between oil Sequenced conflux:
recirculation under light load conditions and no If the arm cylinder head (H) is loaded heavily, the
recirculation under heavy load conditions by solenoid proportional valves (C) and (D) operate in
detecting pump pressure. This is called variable addition to the above mentioned recirculation cut
recirculation. When the arm is under a heavy load, action. As a result, each secondary pressure acts
when no recirculation occurs, the oil supply passage upon the PTb and Pcb ports of the control valve,
to the arm cylinder is the same as during changes the travel straight spool (307) to position (II)
recirculation for a light load, but the return oil and changes the P1 bypass cut spool (309).
passage is different. As a result, the oil flow from the pumps P1 opens
The system detects the pump pressure at heavy load check poppet CT2 as P1 bypass cut spool (309) has
conditions (more than 200 kgf/cm 2 (2840 psi) of shifted and hydraulic oil of pump P2 is flowing in the
pump pressure. This causes the secondary pressure parallel circuit (56) of the control valve. This supplies
of solenoid proportional valve (A) to operate and the arm cylinder head (H).
changes the arm recirculation spool (310) to position
(I).
24-54 Issued 01-2006 Bur 5-1380 NA
--- Page 36 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
24.1.9.3 CONSTRUCTION
CH24-55-011 Figure 70
24-64 Issued 01-2006 Bur 5-1380 NA
--- Page 37 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
24.1.11.2 TRAVEL MOTOR (FOR L TYPE)
24.1.11.2.1 SPECIFICATIONS
C24-65-01 Figure 81
24-74 Issued 01-2006 Bur 5-1380 NA
--- Page 38 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
24.1.14 HYDRAULIC MOTOR
C24-75-01 Figure 93
24-84 Issued 01-2006 Bur 5-1380 NA
--- Page 39 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
24.1.17 SWIVEL JOINT SPECIFICATION
24.1.17.1 GENERAL VIEW (SPEC.1)
CH24-85-01 Figure 103
24-94 Issued 01-2006 Bur 5-1380 NA
--- Page 40 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
Cushion on head side
The construction of the head side cushion is similar
to that of the rod side. In a state of intermediate
stroke on the pressing rod side, oil in chamber βAβ
returns to the tank by passing through paths βBβ and
βCβ at a fixed flow rate.
Prior to the stroke end, the plunger blocks path βBβ.
The oil in chamber βAβ, path clearance βDβ, and
restricted path βCβ suddenly drops as the oil flow
volume is returning to the tank. This causes the
piston movement to slow.
CH24-95-01 Figure 113
24-104 Issued 01-2006 Bur 5-1380 NA
--- Page 41 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
CH24-105-01 Figure 123
24-114 Issued 01-2006 Bur 5-1380 NA
--- Page 42 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
CH24-115-01 Figure 133
24-124 Issued 01-2006 Bur 5-1380 NA
--- Page 43 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 24 - COMPONENTS SYSTEM
CH24-125-01 Figure 143
24-134 Issued 01-2006 Bur 5-1380 NA
--- Page 44 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 25 - AIR CONDITIONING SYSTEM
25.1.1.2 COMPONENT CONSTRUCTION
25.1.1.3 INTAKE UNIT
CH25-06-01 Figure 4
25-6 Issued 01-2006 Bur 5-1390 NA
--- Page 45 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 25 - AIR CONDITIONING SYSTEM
25.2.1 REMOVAL AND INSTALLATION 25.2.1.0.2 REPLACING THE BLOWER MOTOR
25.2.1.0.1 REMOVING THE BLOWER UNIT
CH25-16-01 Figure 16
Remove the connectors fastening the inner/outer air CH25-16-03 Figure 18
select motor actuator, the blower motor and the To replace the blower motor, disconnect the cooling
blower controller. Remove the electrical harness from hose connecting the blower motor and the blower
the blower casing. casing. Remove the 3 Phillips screws N5 X16 (W)
from the bottom of the blower unit casing. Remove
the blower motor.
NOTE: Do not separate the fan from the blower
motor.
Assembly is the reverse order of disassembly.
25.2.1.0.3 REPLACING THE BLOWER
CONTROLLER
Remove the 2 Phillips screw T4X14 (T1) from the
bottom of the blower unit casing and draw out the
blower controller. Install a new blower controller in the
reverse order of removal.
NOTE: Do not disassemble the blower controller
under any circumstances. Replace it as a complete
unit.
CH25-16-021 Figure 17
Remove the inner air filter from the intake casing.
Remove the 4 Phillips screws T5 X 14 (T1) from the
top of the intake casing. Then remove the intake
casing. Remove the 3 screws T5 X14 (T1) fastening
the blower casing to the unit casing. Separate the
blower unit from the air conditioner unit.
25-16 Issued 01-2006 Bur 5-1390 NA
--- Page 46 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 25 - AIR CONDITIONING SYSTEM
NOTES
25-26 Issued 01-2006 Bur 5-1390 NA
--- Page 47 ---
SECTION 2 - HYDRAULIC, ELECTRICAL, AND COMPONENT SYSTEMS
CHAPTER 25 - AIR CONDITIONING SYSTEM
CH25-36-1ID Figure 52
25-36 Issued 01-2006 Bur 5-1390 NA
--- Page 48 ---
SECTION 3 - DISASSEMBLY AND ASSEMBLY
CHAPTER 31 - GENERAL DISASSEMBLY AND ASSEMBLY
NOTES
31-4 Issued 01-2006 Bur 5-1410 NA
--- Page 49 ---
SECTION 3 - DISASSEMBLY AND ASSEMBLY
CHAPTER 32 - ATTACHMENTS
32.1.4 BOOM 5. After adjustment of shim, the total gap should be
32.1.4.1 REMOVAL OF BOOM within 0.6-2 mm (0.02-0.08 inches).
CH32-09-01 Figure 15
1. Lower the boom and support the boom end with
a suitable stand.
2. Disconnect all hoses from the bucket cylinder,
arm cylinder and boom cylinder, install plugs in
all the openings.
CH32-10-01 Figure 18
3. Disconnect the wiring for working light at the
connector. 6. To disconnect cylinder pipes, retract boom
cylinder rod and place one side of cylinder on
block.
CH32-10-02 Figure 19
CH32-09-02 Figure 16
7. To disconnect arm cylinder piping, release the
pressure in the hydraulic tank and disconnect
4. To remove boom cylinder, lift up boom with an
pipe at section DD. After disconnection, plug
appropriate lifting device or nylon sling to prevent
pipes to prevent dust, debris contamination.
the boom cylinder from falling. Remove the cap
screw and nuts that secure pin (C), then remove
pin (C).
CH32-09-03 Figure 17
32-8 Issued 01-2006 Bur 5-1420 NA
--- Page 51 ---
SECTION 3 - DISASSEMBLY AND ASSEMBLY
CHAPTER 32 - ATTACHMENTS
32.1.7.4 REMOVING PIN BUSHINGS 32.1.7.4.2 ASSEMBLING PISTON ASSEMBLY
CH32-23-01 Figure 50
1. The cylinder tube is pressed into the pin bushing
(2) of the piston rod. When disassembling, use a
jig (A) and push the rod out.
CH32-24-01 Figure 52
2. When all cylinder parts have been disassembled, 2. Coat O-ring (8) with hydraulic oil and set in place
wash all parts with a suitable solution. Do not use using inserting jig. Push slipper seal (10-1) in
volatile agents such as gasoline or thinner, as place. Slipper seal will soften if heated, but do
they deteriorate rubber. Do not reuse the oil not heat the seal above 100Β° C (212Β° F).
seals, o-rings, or back-up rings. Dry all parts with
jet air and protect them from damage.
32.1.7.4.1 CYLINDER TUBE AND
PISTON ROD ASSEMBLY
CH32-24-02 Figure 53
3. Hold the heated seal in place, using a holding jig
(G). Wind vinyl tape around seal and leave in
place before piston (7) is set into cylinder tube.
Attach wear ring and dust ring when inserting
CH32-23-02 Figure 51 piston (7) into cylinder tube.
1. Press fit pin bushing (2) into cylinder tube (12)
and piston rod (4).
32-18 Issued 01-2006 Bur 5-1420 NA
--- Page 52 ---
SECTION 3 - DISASSEMBLY AND ASSEMBLY
CHAPTER 32 - ATTACHMENTS
32.1.9.3 SLIPPER SEAL - HOLD DOWN JIG
CH32-35-01 Figure 76
32-28 Issued 01-2006 Bur 5-1420 NA
--- Page 53 ---
SECTION 3 - DISASSEMBLY AND ASSEMBLY
CHAPTER 33 - UPPER SLEWING STRUCTURE
33.0.8 INSTRUMENT PANEL
CH33-06-03 Figure 13
3. To remove the control box, remove the four sems
bolts (19) M8 on right and left side. Separate the
CH33-06-01 Figure 11 control box from its support.
1. Prepare for removal of instrument panel by Left control box weight: 8.5 kg (19 pounds)
disconnecting the negative ter minal of the Right control box weight: 7 kg (15 pounds)
battery. To remove the right hand and left hand including pilot valve
instrument panel, remove 8 sems bolts (12) M5.
33.0.9 INSTRUMENT PANEL INSTALLATION
Install the instrument panel in the reverse order of
removal, tightening all bolts according to
recommended torque.
CH33-06-04 Figure 14
CH33-06-02 Figure 12
2. Lift the panel up slightly to remove the two
connectors for air conditioning (8P), tuner (9P)
and the antenna cable on rear side of the left
instrument panel.
8P - Air conditioning panel
9P - Tuner
6P - Key switch
3P - Accelerator panel
2P and 8P - Switch panel
33-8 Issued 01-2006 Bur 5-1430 NA
--- Page 54 ---
SECTION 3 - DISASSEMBLY AND ASSEMBLY
CHAPTER 33 - UPPER SLEWING STRUCTURE
33.0.15 PUMP (MAIN) 33.0.15.2 PUMP (MAIN) REMOVAL
33.0.15.1 REMOVAL PREPARATION
CH33-19-03 Figure 44
1. Loosen half clamp (11) on the hoses (5), (6) and
the cap screws (12) M10 X 35. Disconnect two
hoses (A1), (A2) on the delivery side.
2. Remove four cap screws (13) M12 X 30, then
remove suction tube (1) of suction hose (4) from
CH33-19-01 Figure 42 the pump.
1. To remove main hydraulic pump, first remove
counterweight. Though pump can be removed
without removing counterweight, the removal of
counterweight will reduce working time.
2. Release pressure in hydraulic oil tank. Remove
the six cap screws (A12) M10, remove cover (A6)
and remove suction strainer.
CH33-19-02 Figure 43
3. Remove the six cap screws (41) M12 X 25 and
the two cap screws (42) M12 X 30. Then remove
guard (18, 19) and disconnect drain pipe
installed under the engine muffler.
33-18 Issued 01-2006 Bur 5-1430 NA
--- Page 55 ---
SECTION 3 - DISASSEMBLY AND ASSEMBLY
CHAPTER 33 - UPPER SLEWING STRUCTURE
CH33-25-04 Figure 67
33.0.17.2 REMOVAL 4. Hook the lifting devise to the lifting lugs and the
1. The engine is bolted to the frame. In order to front and rear of the engine. Lift slowly, first
remove it, first remove the four nuts (7) M18, the removing any slack from the lifting line.
rubber mounts (3) and metal shims (13), (14). 5. Position the engine on the engine mounting
2. Remove the four cap screws (4), (5), (6), the two stand in a safe and stable fashion.
washers (8), two plates (9), and two rubber 33.0.17.3 INSTALLATION
mounts (1), (2). Make note of which cap screws
1. Installation is the reverse order of disassembly.
these parts were removed from.
2. Adjust the clearance between the lower
3. Prepare to sling the engine. A lifting devise
mounting surface of the engine and rubber
capable of holding the weight of engine must be
mount (3) to 1.0 mm (0.039) using shims (13)
available.
and (14).
Engine Weight: Approx. 370 kg (820 pounds)
3. Refer to the above figure for tightening torques
and Loctite information.
33-28 Issued 01-2006 Bur 5-1430 NA
--- Page 56 ---
SECTION 3 - DISASSEMBLY AND ASSEMBLY
CHAPTER 33 - UPPER SLEWING STRUCTURE
33.0.25.2 INSTALLATION
CH33-42-01 Figure 85
1. Installation is performed in the reverse order of
disassembly.
2. Cleaning mating surfaces of upper frame and
swing bearing.
3. Apply Loctite #515 to the inside of the cap CH33-42-01 Figure 86
screws on the contact surface. 5. Confirm reamer bolt position, and apply Loctite
#262.
4. Match the previously indicated marks on the
upper frame and install with three reamer bolts Tightening Torque: 28.5 kgfm (210 pound-foot)
(11) temporarily. 6. Install the swing bearing by installing the twenty-
five cap screws (10) M16 X 80. Apply Loctite