PDF Service Manual New Holland E35B SR E39B SR Mini Excavator - 8 MB

This service manual provides complete repair and maintenance information for the New Holland E35B SR and E39B SR hydraulic mini excavators.

It is designed for technicians and contains detailed instructions for troubleshooting, disassembly, and reassembly of all major components.

The manual includes hydraulic and electrical schematics to aid in complex diagnostics.

This guide is essential for keeping your mini excavator in peak operating condition.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
TO THE READER
This manual has been printed for a skilful engineer   For any question or remark, or in case of any error
to supply the necessary technical information to      in the contents of this manual, please contact:
carry out service operations on this machine.
                                                      CNH ITALIA S.p.A.
Carefully read this manual to obtain correct infor-   Via Plava, 80
mation regarding repair procedures.                   10135 TORINO - Italy


REFERENCE
Beyond this Service Manual, also refer to the doc-
uments listed below:
- Operator’s Manual
- Parts Catalogue


COMPLETE SERVICE MANUAL                               The Service Manual for “Hydraulic Mini Excava-
The Service Manual consists of one volume:            tors” contains the necessary technical information
                                                      to carry out maintenance and repair operations on
- E35B SR - E39B SR - Service Manual “Hydraulic       the machine, the necessary tools to carry out
  Mini Excavators”                                    maintenance operations, the information on serv-
                                                      ice standards, the procedures for removal, instal-
                                                      lation, disassembly and reassembly.
                                                      The Service Manual relevant to the excavator
                                                      models E35B SR - E39B SR consists in the follow-
                                                      ing volume, which is identified through the rele-
                                                      vant print no. as reported below:


                       VOLUME                            MACHINE TYPE              PRINT NUMBER
Service Manual for “Hydraulic Mini Excavators”               E35B SR                  84553640A
                                                             E39B SR

--- Page 3 ---
1. DESCRIPTION

1.1        GENERAL PRECAUTIONS FOR                                   (2) Suspend warning tag “DO NOT OPERATE” from the
                                                                         doorknob or the operating lever, and have a preliminary
           REPAIRS
                                                                         meeting before starting work.
1.1.1      PREPARATION BEFORE DISASSEMBLING                          (3) Stop the engine before starting inspection and
                                                                         maintenance to prevent the operator being caught
                                                                         in machine.
                                                                     (4) Identify the location of a first-aid kit and a fire extin-
(1) Understanding operating procedure                                    guisher, and also where to make contact in a state
    Read OPERATION AND MAINTENANCE MANU-                                 of emergency.
    AL carefully to understand the operating procedure.
                                                                     (5) Choose a hard, level and safe place, and place the
(2) Cleaning machines                                                    attachment on the ground securely.
    Remove soil, mud, and dust from the machine be-
                                                                     (6) Use a lifter such as a crane to remove heavy parts (20 kg
    fore carrying it into the service shop to prevent loss
                                                                         or more) from the machine.
    of work efficiency, damage of parts, and difficulty in
    rust prevention and dust protection while reassem-               (7) Use proper tools, and replace or repair defective
    bling.                                                               tools.

(3) Inspecting machines                                              (8) Support the machine and attachment with supports
    Identify the parts to be disassembled before start-                  or blocks if the work is performed in the lifted condi-
    ing work, determine the disassembling procedure                      tion.
    by yourself considering the workshop situations                  1.1.3      DISASSEMBLING AND ASSEMBLING
    etc., and request procurement of necessary parts in                         HYDRAULIC EQUIPMENT
    advance.
(4) Recording
    Record the following items for communication and
    prevention of recurring malfunction.                             (1) Removing hydraulic equipment
    1) Inspection date and place.                                        1) Before disconnecting pipes, release the hy-
    2) Model name, applicable machine number, and                           draulic pressure of the system, or open the re-
       hourmeter read.                                                      turn side cover and take out the filter.
    3) Trouble condition, place and cause.                               2) Carefully drain oil of the removed pipes into a
    4) Visible oil leakage, water leakage and damage.                       containers without spilling on the floor.

    5) Clogging of filters, oil level, oil quality, oil con-             3) Apply plugs or caps on the pipe ends to avoid
       tamination and loosening of connections.                             oil spillage and dust intrusion.

    6) Result of consideration if any problem exists based               4) Clean off the external surface of the equipment be-
       on the operation rate per month calculated from                      fore disassembling, and drain hydraulic and gear oil
       hourmeter indication after the last inspection date.                 before placing it on the workbench.

(5) Arrangement and cleaning in service shop                         (2) Disassembling hydraulic equipment

    1) Tools required for repair work.                                   1) Do not disassemble, reassemble or modify the
                                                                            hydraulic equipment without the permission of
    2) Prepare space to place the disassembled parts.
                                                                            the manufacturer, who is not responsible for the
    3) Prepare oil containers for draining oil etc.
                                                                            performance and function of the product after
1.1.2      SAFETY IN          DISASSEMBLING           AND                   modification.
           ASSEMBLING                                                    2) When disassembling and reassembling for unavoid-
                                                                            able reason, refer the work to qualified personnel
                                                                            who have the specific knowledge or completed the
                                                                            parts service training.
(1) Wear appropriate clothes with long sleeves, safety                   3) Provide matching marks to facilitate reassem-
    shoes, safety helmet and protective glasses.                            bling work.
                                                                         4) Before starting the work, read the manual of disas-
                                                                            sembling procedure, if it is provided, and decide
                                                                            whether the work can be performed by yourself.


                                                               1-1

--- Page 4 ---
2. SPECIFICATIONS

                                                                                                             Unit: mm
(3) E39B SR (CANOPY)


                                            160
                                     660
                                                                                              R850


                              1700
                                     660
                                      50


                                            60
                                                            4710
                                                                          1910
                       1550                                                      1460
                                                                                        850


                                                                                                      2570
                                                  (13.6")
                                                    345
                                330


                                                                                                570
                                                                   1600
             300                                                              1700
                       1400                                                   2150
                       1700                                               2680


(4) E39B SR (CAB)
                                            160
                                     660


                                                                                              R850
                                   1700

                                 50
                               660


                                            60


                                                            4710
                                                                            1910
                       1550                                                    1460
                                                                                        850
                                                                                                      2570
                                                  (13.6")
                                 330


                                                    345


                                                                                                570


                                                                   1600
             300                                                              1700
                       1400                                                   2150
                       1700                                               2680


                                           2-3

--- Page 5 ---
2. SPECIFICATIONS

2.9         LUBRICANT, FUEL AND COOLANT SPECIFICATIONS
The following table indicates the proper oils, lubricants and fuel to be used with various climates and service condi-
tions.

                                                                                Operating range
                                                                                                              Specifica-
    Components                Technical name                 Quantity       (ambient temperature °C)
                                                                                                                tions
                                                                           -20° -10° 0° 10° 20° 30° 40°
                       Selenia IDRAULICAR AP31
                       Selenia IDRAULICAR AP46 Tank: 38 l
Hydraulic oil tank                                                                                           QKF 583/HD
                       Selenia IDRAULICAR AP51 System: 54.5 l
                       Ambra HI-TECH 46
                                                                                                             API CH4
                                                      H level: 6.7 l
Engine oil pan         Ambra Supergold                                                                       ACEA E5
                                                      L level: 2.8 l
                                                                                                             QFK 583/HD
Fuel tank                                             38 l                                                   EN590
                                                                                                             NH 900 C
                                                      1.6 l                                                  ASTM D
Cooler                 Ambra Agriflu - OT
                                                      Total q.ty 4.6 l                                       3306
                                                                                                             Type 1
Travel motor                                          0.7 l X 2
                                                                                                             API GL5
Upper rollers       Ambra HYPOIDE 90                  45 cc X 2
                                                                                                             NH 520 A
Idel wheels                                           80 cc X 2
Attachment and
dozer pin                                             20 - places
Swing cylinder pin
                                                                                                             NLGI 2
Slewing bearing     Ambra GRS PLUS                    1 - place
                                                                                                             QFK 586/GR
Idler adjuster                                        2 - place
Operating lever and
                                                      When required
pedal
                                                                                                             NLGI 2
Rotation gear          MG 2                           1 - place
                                                                                                             QFK 586/GR
Air conditioner        R134A                          700 g
Compressor             Sanden SP-10                   120 cc

(*) The systems are filled with the products indicated with the asterisk.

NOTE:
USE OF BIO-DEGRADABLE OILS
When you use bio-degradable oil, please refer to following:
•   there are two types of bio-degradable oil available: vegetable-based and synthetic-based. We recommend using
    synthetic oils, because vegetable ones have a maximum operating temperature of 80 °C.
    For this reason, the degradation of vegetable-based oil occurs more rapidly, and they have a reduced service life;
•   do not mix Bio-oil with original factory-filled mineral oil; in case it is necessary to use Bio-oil, flush the hydraulic
    system that was filled with bio-oil three times;
•   if you use Bio-oil, the performance of the rotation brake and that of the parking/travel brake will be reduced, be-
    cause of the lower friction factor of Bio-oil compared to that of mineral oil;
USE OF COOLANT
•   There are two types of coolantdepending on the corrosion inhibitors base: ORGANIC-base and INORGANIC-
    base.
•   Mini excavators is ORGANIC-base type factory filled.
•   Both type can be used, BUT THEY CANNOT BE MIXED. Flush the cooling system before change coolant type.


                                                             2-13

--- Page 6 ---
3. ATTACHMENT DIMENSIONS

3.2.2       DIPPER MAINTENANCE STANDARDS
(1) Clearance of pin and bushing


                                Fig. 3-5 Clearance of pin and bushing on dipper section
                                                               Table 3-5
• E35B SR                                                                                                              Unit: mm
                                               Standard dimensions                              Tolerance

Location           Piece                                          Tolerance on                  Standard
                                      Pin   Tolerance on pin                                              Serviceability Remedy
                                                                  bushing bore   Standard value value for
                                   diameter     diameter                                                      limit
                                                                    diameter                     repair
           Dipper point
                                                                       +0.11
   A       (Connected part of                                                      0.08÷0.16
                                                                       +0.06
           bucket)
           Bucket connecting rod                                       +0.11
   B                                                                               0.07÷ 0.16
           (Bucket side)                                               +0.05
           Bucket link
                                                                       +0.08
   C       (Connected part of                                                      0.05÷0.13
                                     ø40                               +0.03
           dipper)
           Bucket connecting rod                                       +0.09                                           Replace
   D                                             –0.02                             0.05÷0.14
           (Idler link side)                                           +0.03                        0.7       1.0      bushing
                                                 –0.05
           Bucket cylinder                                             +0.25                                            or pin
   D'                                                                              0.07÷0.30
           (Rod side)                                                  +0.05
           Bucket cylinder                                             +0.13
   E                                                                               0.09÷0.18
           (Bottom side)                                               +0.07
           Dipper foot
                                                                       +0.10
   F       (Connection with                                                        0.07÷0.15
                                                                       +0.05
           boom)                     ø45
           Arm cylinder                                                +0.13
   G                                                                               0.09÷0.18
           (Rod side)                                                  +0.07


                                                                 3-7

--- Page 7 ---
3. ATTACHMENT DIMENSIONS

3.5        SWINGING
3.5.1      SWING BRACKET DIMENSIONAL DRAWINGS


                                    Fig. 3-12 Swing bracket dimensional drawings
                                                      Table 3-15
                                                                                               Unit: mm
 No.                                                 NAME                                     SIZE
  A     Distance between swing centre pin and boom foot pin                                    96
  B     Distance between boom foot pin and boom cylinder pin                                  176.8
  C     - ditto -                                                                             266.9
  D     Distance between swing centre pin and swing cylinder pin                              R264
  E     - ditto -                                                                              257
  F     Inside width of swing centre                                                           306
  F1    - ditto -                                                                              78
  F2    - ditto -                                                                             73.5
  G     Inside width of boom foot                                                              178
  H     Inside width for installing boom cylinder                                              61
  J     Inside width for installing swing cylinder                                             67
  d1    Pin diameter of swing center                                                           ø65
  d2    Pin diameter of boom foot pin                                                          ø45
  d3    Pin diameter of boom cylinder                                                          ø45
  d4    Pin diameter of swing cylinder                                                         ø45


                                                        3-17

--- Page 8 ---
11. TOOLS

11.5    SPECIAL SPANNERS FOR TUBES
 Applicable tube diameter                HEX                    Dimensions of a special spanner
                             Item no.
           mm                            mm                                  mm


           15                             27


           18                             32


           22                             36


           28                             41


11.6    SPECIAL TOOLS
 No.      Name          Tools no.                       Shape                               Use

        Torx driver                     4.4
       (with tamper
                                                                                       For instrument
 1         proof)           —
                                                                                         right cover
            T25
         (for M5)


11.7    APPLICATION OF SCREW LOCKING AND SEALING COMPOUNDS
                 Service                      Loctite                       Features
                                              #242                        Low strength
        Screw locking compound                #262                       Middle strength
                                              #271                        High strength
            Sealing compound                  #515                           Sealing


                                              11-5

--- Page 9 ---
13. MAINTENANCE STANDARDS AND TEST PROCEDURES

13.3      MEASURING ENGINE SPEED
13.3.1    MEASURING ENGINE SPEED

(1) Measuring instruments                                                     2
  1) The speedometer (1) (measures the engine
                                                                                          1
     speed through the application of a sampling
     tool (2) to one of the injection pipes).
  2) Surface thermometer (measuring the surface
     temperature getting contact of the probe with
     the surface of hydraulic oil tank and radiator)
(2) Engine warming up operation
    Start the engine and take the coolant temperature
    within the range of 60 to 90 °C.
    Check the coolant temperature with the coolant                   Fig. 13-1 Engine speed measurement
    thermometer on the control panel. The white colour                (The above figure shows concept)
    zone shows approximately 67 to 105 °C of temper-
    ature range.
    Therefore, when the indicator is located at around
    centre of the white zone, it is suitable for the engine
    operation.
(3) Engine speed measurement
  1) Apply the pick up of speedometer to one of
     convenient injection pipes.
     (See Fig. 13-1)
                                                                           WATER TEMPERATURE
  2) Measure the engine speed at idling with no
     load, and compare it to the figure in the
     STANDARD VALUE TABLE.


                                                              13-5

--- Page 10 ---
13. MAINTENANCE STANDARDS AND TEST PROCEDURES

13.7      MEASURING ATTACHMENT OPERATING PERFORMANCES
•TEST PROCEDURES
   Measure 3-time each.
   Apply average data of the above for judgement.

13.7.1    Cylinder speed

(1) Boom cylinder speed
    • Engine: high idling
    • Hydraulic oil temperature: 50 ÷ 60 °C
    • Measurement position: completely retract the
      arm cylinder, fully extend the bucket cylinder
      and place the dozer blade on the ground.
    • Then measure the time required for the bucket
      to reach its highest point (lowest point) from its
      lowest point (highest point) placing on the
      ground. (Do not include the cushioning time).

(2) Arm cylinder speed
    • Engine: high idling
    • Hydraulic oil temperature: 50 ÷ 60 °C
    • Measurement position: completely retract the
      arm cylinder, fully extend the bucket cylinder,
      position the arm horizontally and place the doz-
      er blade on the ground.
    • Then measure the time required for the arm
      cylinder to completely retract (extend) from a
      fully extended state (retracted state).

(3) Bucket cylinder speed
    • Engine: high idling
    • Hydraulic oil temperature: 50 ÷ 60 °C
    • Measurement position: completely retract the
      arm cylinder, position the arm horizontally and
      place the dozer blade on the ground.
    • Then measure the time required for the bucket
      cylinder to completely retract (extend) from a
      fully extended state (retracted state).


                                                           13-15

--- Page 11 ---
22. HYDRAULIC SYSTEM

22.3.3     TRAVEL OPERATING CIRCUIT                            2) Travel motor
           (Refer to fig. 71-3)                                   a. The pressurized oil supplied to the travel
Pilot oil hydraulic system with operating lever                      motor shifts the spool of the counterbalance
                                                                     valve (brake valve) (408), releases the
22.3.3.1      2nd speed operating circuit                            parking brake (403), opens the hydraulic
              (Independent-forward travel)                           circuit having closed by the check valve
(1) Pilot circuit                                                    (407) and rotates the travel motor. It actu-
    1) Shifting signal for 2nd speed travel.                         ates the speed shifting valve (404) when
       When the “Rabbit and Turtle” mark (at the pow-                the 2nd speed signal is sent. The high-pres-
       er cut-off, it automatically takes back for 1st               sure oil pumped through the shuttle valve
       speed) on the knob of travel right lever is                   (406) passes through the speed change
       pushed down, it actuates the 1st and 2nd speed                valve (404), actuates the speed shifting pis-
       travel shifting valve of solenoid valve (13). The             ton (401) so that the engine rotates at high
       pressurized oil signal for 2nd speed is generat-              speed but with a low torque.
       ed by the solenoid valve (13) and led to the               b. When the motor reaches near to a self-run-
       travel motor (4) through the swivel joint (10),               ning condition (over-running) at going down
       and shifts the 2nd speed shifting valve (404).                a slope and so on, the oil pressure of supply
    2) Changing travel valve spool                                   side gets down to lower pressure, and the
       The pilot secondary pressure is generated from                counter balance valve [brake valve] (408)
       pilot valve (12) by the operation for travel for-             spool moves to the neutral position with the
       ward. The pressurized oil is led to the Pb7 and               spring force.
       Pb6 ports on control valve (2) to shift the travel            As the results, the passage in return oil side
       valve spool.                                                  is throttled, and the motor speed is sup-
                                                                     pressed by a back-pressure, then the motor
(2) Main circuit
                                                                     is controlled to the speed corresponding to
    1) Circuit up to travel motor (4)
                                                                     the supplied oil volume of the pump.
       The delivered oil from A1 and A2 ports on vari-
                                                                  c. The counterbalance valve spool is so de-
       able pump enters into the P1 and P2 ports of
                                                                     signed that it is gradually shifted by a throt-
       control valve (2), and led to the B7 and B6 ports
                                                                     tle effect to stop or start the motor
       through the travel valve. Then it is led to the A
                                                                     absorbing shock at the start and stop of the
       and B ports on left and right travel motors re-
                                                                     machine.
       spectively through the swivel joint (10).
                                                                  d. When load increases during high speed
                                                                     travel, the speed automatically shifts to the
                                                                     1st speed, resulting in low speed and high
                                                                     torque.


                                                        22-5

--- Page 12 ---
23. ELECTRICAL SYSTEM

      Group           Code                                       Part Name
                      SW-1       (KEY) STARTER SWITCH
                      SW-2       WORKING LIGHTS SWITCH
                      SW-3       2nd SPEED SELECTOR SWITCH
                      SW-4       WIPER WASHER SWITCH
                      SW-5       ENGINE COOLANT TEMPERATURE SWITCH
                      SW-6       ENGINE OIL PRESSURE SWITCH
                      SW-7       HORN SWITCH
     Switch
                      SW-9       LEVER LOCK SWITCH
                      SW-10      HEATER SWITCH (OPT)
                      SW-11      DECELERATION SWITCH
                      SW-15      HIGH AND LOW PRESSURE SWITCH
                      SW-16      CONDENSER SPEED SHIFT SWITCH
                      SW-39      OVERLOAD PRESSURE SWITCH
                      SW-40      OVERLOAD SWITCH


NOTE: the part number may be changed owing to modification, use them only for reference.


                                                   23-3

--- Page 13 ---
23. ELECTRICAL SYSTEM


                                             Fig. 23-2 Engine (2/2)

1. Fix perpendicularly. Tightening torque 5.9 ÷ 9.8 Nm 4. Fix the clip with a bolt of alternator bracket. Fix with
2. Harness must pass below alternator                     taping part
3. Alternator                                            5. Fix with taping part


                                                     23-13

--- Page 14 ---
24. SYSTEMS COMPONENTS

24.1       HYDRAULIC COMPONENTS
24.1.1     HYDRAULIC PUMP

24.1.1.1 TECHNICAL SPECIFICATIONS


Ports:
         No.                                          Name                                            Dimensions
         S1        Suction port                                                                        SAE 11/2
       A1, A2      Delivery port                                                                        PF 1/2
    A1G, A2G       Pressure port                                                                        PF 1/8
         A3        Delivery port                                                                        PF 1/2
         A4        Pilot delivery port                                                                  PF 3/8
         R1        Air bleed port (with breather valve)                                                M10 x 1.0

                                   Fig. 24-1 General view of hydraulic pump

                              Model                                   AP2D18LV3RS7
                                                Piston pump              Gear pump               Trochoid pump
          Pump
                                                  P1 + P2                   P3                        P4
Working pressure                      MPa           23.0                     20.0                       3.5
Displacement                        cc/rev        16.0 x 2                    8.6                       5.1
Delivery flow                         l/min       38.4 x 2                   20.6                      12.2
Control system                                      Total power shift control by tilting angle (power shift)
Rating speed                             rpm                                 2400
Weight                                    kg                                 27.5


                                                          24-1

--- Page 15 ---
24. SYSTEMS COMPONENTS

24.1.2    ATTACHMENT CONTROL VALVE

24.1.2.1 TECHNICAL SPECIFICATIONS


                                                             580
                                                             497
                                                             435

                                                         300 22
                                                            290


                                                             145
                                                              78
                                                               0


A.  The adjust nut (opposing flats: 22): fix adjust nut by
    means of spanner (opposing flats: 22) when the le-
    ver is installed. Then tighten the mating lock nut to
    41 ± 0.3 Nm
OA. Operation angle (degree)
OT. Operation torque (Nm)
PR. Push rod stroke (mm)
SP. Secondary pressure (MPa)
T. Tightening torque: 6-PF1/4
     T= 29.4 ± 2.0 Nm

     Maximum primary
                                      6.9 MPa
         pressure
         Delivery                     15 l/min
         Weight                        1.6 kg


                                                      24-11

--- Page 16 ---
24. SYSTEMS COMPONENTS

* For respective operation section, only typical example is described.
  - Manual swing operation (No. 6)

  No.                  Name               Q.TY
   1     Body                               1
   2a    Spool                              1
   2b    O-ring                             1

View the complete manual on HeyDownloads →