PDF Service Manual Liebherr R 9100 R 9100B Hydraulic Excavator - 8 MB
This in-depth service manual is the definitive resource for maintaining and repairing the Liebherr R 9100 and R 9100B hydraulic excavators.
It provides comprehensive procedures for disassembly, assembly, testing, and troubleshooting all major systems.
Written for professional technicians, this manual is essential for performing complex repairs and ensuring the machine operates to factory specifications.
A vital tool for any serious maintenance operation.
PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
PDF viewer loading area
Text Preview from This Manual
The text below was extracted from the visible preview pages to help you confirm the manual contents before download.
--- Page 3 ---
Service Manual
Welding
Beginning with a material thickness of ¼ (8mm), butt welds must be made in several layers. The
weld is applied in several beads. Wide butt welds are filled with several side beads, with the last layer
covering the center. The electrode should melt evenly without creating burrs and peaks. The valley
or crater, which is created when changing electrodes must be filled in and overlapped with the next
electrode. To prevent cracks in those craters, care must be taken that they are properly filled.
If the crack extends towards the outer edge of the material (pos. C), slag may be trapped or burn
holes may be created. To prevent this, the following aid may be used : tack a piece of sheet of metal
to the outer edge of material.
The welding seam begins now at the sheet metal in the direction of the arrow (pos. C). After the weld-
ing is completed, the sheet metal is removed and the edge of the material is ground smooth. The weld
must cool off slowly and should therefore be protected from rain and wind.
4.3.3 Reinforcement of the welding seam
If the crack of the material is due to an oveload or abuse, a reinforcement plate should be welded
over the crack. The selection of the correct reinforcement plate is based on the construction and load
factors of the component to repair.
For this reason, only general recommendations can be made as to the size and shape of the rein-
forcement plates.
4.3.4 General application of reinforcement plates
Shape of reinforcement plates
Fig. 5 shape of reinforcement plates
The crossover or connection between the reinforced and not reinforced part should be as gradual as
possible. This means that the size of the plate should be selected in such a way that new or unac-
ceptable high stress in the repaired parts are avoided. Plates with sharp corners (such as a rectan-
gular plate) should not be used.
Suitable reinforcement plate with high tensile strenght (pos. D).
Suitable reinforcement plate against bending and alternating loads (pos. E).
Plate thickness
The thickness of the reinforcement plate should be up to 2/3 (66%) of the thickness of the material to
be reinforced.
Plate quality
The yield and tensile strenght of the reinforcement plate should be equal to the material to be rein-
forced.
Plate installation
The welded area of the crack should be ground so it is a smooth and level.
1.00.20 Mining excavators
copyright by
MJFCIFSS
--- Page 13 ---
Component lifting Service Manual
Uppercarriage parts
2.4 Engine and oil cooler boxes / radiators
2.4.1 Engine cooler box (without engine radiator)
Fig. 2 Lifting points of engine cooler box
Weight: 418 kg
2.4.2 Engine radiator
Fig. 3 Lifting points of engine radiator
Weight (empty): 186 + 85 = 271 kg
Thread of the lifting nut: M16 x 20
3.20.2 R 9100
copyright © Liebherr-Mining Equipment Colmar SAS 2018
MJFCIFSS
--- Page 14 ---
Fig. 9 Solenoid valve Y7 on servo unit
Fig. 10 Hose of pressure cut-off valve on swing pump P5
MJFCIFSS
--- Page 17 ---
Tab. 1-2 Working technical data
Tab. 1-3 Working technical data for machine with Extra Wide (EW) undercarriage
MJFCIFSS
--- Page 20 ---
Fig. 3-15 Submenus of the menu "Check"
MJFCIFSS
--- Page 21 ---
Fig. 3-24 Button S122: Disable of ladder control position
Fig. 3-25 Emergency valve of access ladder
MJFCIFSS
--- Page 22 ---
Fig. 3-52 Rotary switch for additional cab heater
MJFCIFSS
--- Page 23 ---
Fig. 3-71 Warning lights of coolant preheating
MJFCIFSS
--- Page 27 ---
Fig. 5-5 Drilled anchor point (example)
MJFCIFSS
--- Page 29 ---
Fig. 5-41 Fuel connection under the fuel tank
MJFCIFSS
--- Page 30 ---
Fig. 5-66 Oil filter parts
MJFCIFSS
--- Page 31 ---
Fig. 5-89 Special expansion tank of Lifetime interspace
Fig. 5-90 Oil change on the Lifetime interspace
MJFCIFSS
--- Page 32 ---
Fig. 5-116 Fan motor in the heater
MJFCIFSS
--- Page 35 ---
Fig. 6-16 Intake and replenishing hoses
MJFCIFSS
--- Page 36 ---
Operating Manual
1 Guidelines
As you read these instructions, you will notice a number of depictions and symbols which are
to facilitate the navigation and understanding of these instructions.
For reasons of better legibility, in these instructions we mainly use the male form for general
references. Of course, the female form is also always intended.
Please read these instructions thoroughly and heed the warning and safety notes. Please
observe the warning and safety notes and exercise particular caution in these cases.
Inform also other users accordingly.
Text representations Meaning
Bold print Highlighting of particularly important words or
passages
List 1 Marks lists
o List 2 Marks lists
(parenthesis) Item numbers
Instructions Instructions to personnel. These always
appear in chronological order.
Explanation of symbols and signs
Activities which generate actual hazards (to life and limb or possible damage to the material)
are marked by warnings. Definitely observe the instructions given in the warnings.
You will find these symbols, which warn of specific dangers to persons, material assets, or the
environment, next to all safety instructions in these operating instructions.
Please read these instructions thoroughly and heed the warning and safety notes. Please
observe the warning and safety notes and exercise particular caution in these cases.
Inform also other users accordingly.
The following warnings are possible.
Warning level Consequence Probability
DANGER Death/ serious injury imminent
WARNING Serious injury possible
CAUTION Minor injury possible
ATTENTION Property damage
possible
4 R 9100
Copyright © Liebherr Mining Equipment Colmar SAS 2018
MJFCIFSS!
--- Page 37 ---
Operating Manual
8 Technical data and operating instructions
Operating pressure / operating temperature
All system components must be designed for the maximum operating pressure and must be
secured by an adequate pressure relief valve against too high system pressures. For details
see operating or installation instructions and data sheets of the respective product.
Installation position, sound pressure level, weight, dimensions
For details see operating or installation instructions and data sheets of the respective
product.
Tightening torques
For details see operating or installation instructions and data sheets of the respective
product.
Output / connections
For details see operating or installation instructions and data sheets of the respective product.
Deviating conditions such as NLGI class, temperature and counter pressure may lead to a
deviation in the flow rate. This should be taken into account when designing the lubrication
points.
Filling possibilities
For details see operating or installation instructions and data sheets of the respective
product.
Electrical connection (electrically driven products)
Following the respective applicable installation prescriptions for electrical systems. For
details see operating or installation instructions and data sheets of the respective product.
IP type of protection
Motor and system:
For IP or NEMA protective class see type identification plate of motor or system respectively
the Technical Data chapter of the individual components. For details see operating or
installation instructions and data sheets of the respective product.
Air pressure and air quality (air-operated products)
Filtered and oiled air according to DIN ISO 8573-1 not higher than class 5
Inlet air pressure 5.5 – 7 bar
Maximum particle density 10 mg / m3
Water content (pressure dew point) + 7 °C
Oil content (maximum oil concentration) 25 mg / m3
Please follow the instructions of the respective product.
R 9100 29
Copyright © Liebherr Mining Equipment Colmar SAS 2018
MJFCIFSS!
--- Page 41 ---
Service Manual
Cooling system
2 Cooling system
The cooling liquid is thermostatically controlled and its circulation is operated by a related water
pump.
Each cylinder unit is cooled individually through the distribution channels cast in the crankcase.
The pistons are cooled through the cooling duct from the lubricating oil circuit of the Diesel engine.
2.1 Cooling schematic
Fig. 2 Cooling system diagram
1 Coolant cooler / radiator 7 Coolant collector rail
2 Coolant inlet to the engine 8 Coolant return to the thermostat
3 Engine water pump 9 Thermostat
4 Oil cooler 10 Coolant outlet to the radiator
5 Coolant distributor rail A Supply from radiator
6 Cylinder head / line B Return from engine
R 9100 6.00.5
copyright © Liebherr-Mining Equipment Colmar SAS 2019
MJFCIFSS
--- Page 42 ---
Service Manual
3.4.5 Start the engine after the fuel system bleeding
With fuel prefilter with remote pump
Start the engine.
Operate it at low idle for approximately 10 minutes.
With fuel prefilter with integrated pump
Start the engine.
Operate it 1800 RPM idle for approximately 10 minutes.
Stop the engine. Wait 2 minutes.
Start the engine again.
If the engine does not start in less than 5 seconds:
Do the bleeding procedure of the fuel system again.
6.00.30 R 9100
copyright © Liebherr-Mining Equipment Colmar SAS 2019
MJFCIFSS
--- Page 43 ---
Fig. 16 Solenoid valves
MJFCIFSS
--- Page 48 ---
Service Manual
Fig. 8 Section of discharge two ways check valve
13 Connector plate - discharge two way 192 Discharge pressure - flow regulator
check valve 192.1 Piston
191.1 Piston 192.2 Flow regulator
191.2 Spring 192.3 Spring
191.3 Bushing 192.4 Bushing
6.2.4 Function of discharge valves in connector plate
The discharge valves 191 and 192 allows a small amount of oil from the low-pressure connection on
the motor to escape into the motor housing.
R 9100 8.00.25
copyright © Liebherr-Mining Equipment Colmar SAS 2018
MJFCIFSS
--- Page 49 ---
Service Manual
Adjustment
6 Adjustment
For adjustment instructions, refer to the section "Adjustment procedure R9100" in chapter 3
"Technical Data" of this manual.
R 9100 9.00.23
copyright © Liebherr-Mining Equipment Colmar SAS 2018
MJFCIFSS
--- Page 50 ---
Service Manual
Energies
Electricity
Temperature (hot or cold surfaces)
Position energy (raised components)
Parts subject to pressure (operating pressure, oil pressure,
grease pressure, air pressure, etc.)
Bursting reservoir if filled by a high-performance pump
Parts subject to spring tension
Lubricants
Greases
Oils
Transport lifecycle
Residual risks Remedy
Tilting or falling of parts during Secure parts against tilting or falling during transport
transport, e.g. over inclines. (e.g. using tapes, belts, ropes, etc.).
Dropping of lifted parts or No people may remain under suspended loads. Keep
tools. unauthorized persons away.
Secure suspended loads using suitable hoisting
equipment (e.g. tapes, belts, ropes, etc.).
Existing residual risks
Installation life cycle
Residual risks Remedy
People slipping due to floor Take care when filling. Bind and remove leaked or
contamination with spilled spilled lubricant immediately with a suitable agent.
or leaked lubricant
Follow the operational instructions for handling
lubricants and contaminated parts.
12 R 9100
Copyright © Liebherr Mining Equipment Colmar SAS 2018
MJFCIFSS!
--- Page 51 ---
Service Manual
9.2.3 Single-line system
The single-line system consists of a pump to supply lubricant under pressure to the injector metering
devices via the supply line. The injector metering devices deliver lubricant to a secondary
(progressive) metering device or to the bearing through feed lines.
The lubrication cycle is initiated by an automated pump. The injectors have indicator stems, which
move in and out to indicate that they have been cycled.
A controller will control the automated system.
The time between on cycles and the length of off cycles is adjustable. The controller includes the
timer function above with a monitor function and alarm capability. A pressure switch is used to
indicate when system pressure has been reached to turn off the pump and verify that a lube cycle
has been completed. If the pressure switch does not detect full pressure within a preset period of
time, the controller goes into alarm state.
9.2.4 Pump station 27L
1 Dip stick
2 Pump P1 – Model
FlowMaster II
3 Hydaulic relief (vent) valve
4 Contact rod – B96 (low level
control) + B185_1 (high-
level control)
5 Overflow pipe
6 Grease reservoir 27L for
FlowMaster II-pump
7 Strainer assembly, pressure
line
8 Lubricant filter, refilling
9 Optical high-level control
10 Solenoid Y34_1 (pump
control)
Fig. 10-6 Central lubrication pump 27L
For information and descriptions of the components, refer to chapter 13.
R 9100 37
Copyright © Liebherr Mining Equipment Colmar SAS 2018
MJFCIFSS!
--- Page 53 ---
Ë»® Ó¿²«¿´
Ѱ»®¿¬·²¹ ײ¬®«½¬·±²
îòîÛÒóîðððïóÖïï
ײ¬®±¼«½¬·±²
Û¨°´¿²¿¬·±² ±º ͧ³¾±´ Ë»¼
̸» º±´´±©·²¹ ¼»½®·°¬·±² ¬¿²¼¿®¼ ¿®» «»¼ ·² ¬¸· ³¿²«¿´æ Ú«®¬¸»®³±®»ô §±« ©·´´ º·²¼ ¬¸» º±´´±©·²¹ ¬»¨¬ §³¾±´ ·² ¬¸·
Í¿º»¬§ ײ¬®«½¬·±² ³¿²«¿´æ
ͬ®«½¬«®» ±º ¿º»¬§ ·²¬®«½¬·±²æ Ô·¬·²¹ ±º ¿°°´·½¿¾´» ¬¿¬»³»²¬
з½¬±¹®¿³ ó Í«¾°±·²¬ ±º ¿°°´·½¿¾´» ¬¿¬»³»²¬
Í·¹²¿´ ©±®¼ ïò Ü»¬»®³·²¿¬·±² ±º ¬¸» ²«³¾»® ±® »¯«»²½» ±º ½±²¬»²¬
Ü¿²¹»® ¬»¨¬ Ю±½»¼«®¿´ ·²¬®«½¬·±²
ó Ü¿²¹»® ²±¬»
ó Ø±© ¬± ¿ª±·¼ ¼¿²¹»® Ë»®ù λ°±²·¾·´·¬§
̸» º±´´±©·²¹ °·½¬±¹®¿³ ¿®» «»¼ ·² ¬¸· ³¿²«¿´ ¿²¼ ¿®» ̱ »²«®» ¬¸» ¿º» ±°»®¿¬·±² ±º ¬¸» «²·¬ô ¬¸» «»® · ®»°±²·ó
½±³¾·²»¼ ©·¬¸ ¬¸» ½±®®»°±²¼·²¹ ·¹²¿´ ©±®¼æ ¾´» º±® ¬¸» º±´´±©·²¹æ
ïò ̸» °«³° ñ §¬»³ ¸¿´´ ¾» ±°»®¿¬»¼ ±²´§ º±® ¬¸» ·²¬»²¼ó
»¼ «» ø»» ²»¨¬ ½¸¿°¬»® þÍ¿º»¬§ ײ¬®«½¬·±²þ÷ ¿²¼ ·¬
¼»·¹² ¸¿´´ ²»·¬¸»® ¾» ³±¼·º·»¼ ²±® ¬®¿²º±®³»¼ò
îò ̸» °«³° ñ §¬»³ ¸¿´´ ¾» ±°»®¿¬»¼ ±²´§ ·º ·¬ · ·² ¿
°®±°»® º«²½¬·±²·²¹ ½±²¼·¬·±² ¿²¼ ·º ·¬ · ±°»®¿¬»¼ ·² ¿½ó
½±®¼¿²½» ©·¬¸ ¬¸» ³¿·²¬»²¿²½» ®»¯«·®»³»²¬ò
ïðïíßçì ìîéí¿ðð êððï¿ðî íò ̸» ±°»®¿¬·²¹ °»®±²²»´ ³«¬ ¾» º¿³·´·¿® ©·¬¸ ¬¸· Ë»®
ó ßÌÌÛÒÌ×ÑÒ ó ßÌÌÛÒÌ×ÑÒ ó ÒÑÌÛ Ó¿²«¿´ ¿²¼ ¬¸» ¿º»¬§ ·²¬®«½¬·±² ³»²¬·±²»¼ ©·¬¸·² ¿²¼
±¾»®ª» ¬¸»» ½¿®»º«´´§ò
ó ÝßËÌ×ÑÒ ó ÝßËÌ×ÑÒ ó ×ÓÐÑÎÌßÒÌ
ó ÉßÎÒ×ÒÙ ó ÉßÎÒ×ÒÙ
̸» ·¹²¿´ ©±®¼ ¹·ª» ¬¸» »®·±«²» ±º ¼¿²¹»® ·º ¬¸» º±´´±©ó
·²¹ ¬»¨¬ · ²±¬ ±¾»®ª»¼æ
ßÌÌÛÒÌ×ÑÒ ®»º»® ¬± º¿«´¬ ±® ¼¿³¿¹» ±²
³¿½¸·²»ò
ÝßËÌ×ÑÒ ®»º»® ¬± ¾¿¼ ¼¿³¿¹» ¿²¼ °±·ó Û²ª·®±²³»²¬¿´ Ю±¬»½¬·±²
¾´» ·²¶«®·»ò É¿¬» ø»ò¹ò «»¼ ±·´ô ¼»¬»®¹»²¬ô ´«¾®·½¿²¬÷ ³«¬ ¾» ¼·ó
ÉßÎÒ×ÒÙ ®»º»® ¬± °±·¾´» ¼¿²¹»®±« ·²¶«ó °±»¼ ±º ·² ¿½½±®¼¿²½» ©·¬¸ ®»´»ª¿²¬ »²ª·®±²³»²¬¿´ ®»¹«´¿ó
®·»ò ¬·±²ò
ÒÑÌÛ ·²¼·½¿¬» ·³°®±ª»¼ ±°»®¿¬·±² ±º ¬¸»
¼»ª·½»ò
×ÓÐÑÎÌßÒÌ ·²¼·½¿¬» °»½·¿´ ±°»®¿¬·²¹ º»¿ó Í»®ª·½»
¬«®» ±º ¬¸» ¼»ª·½»ò
Û¨¿³°´»æ
ßÌÌÛÒÌ×ÑÒÿ
ɸ»² ³¿µ·²¹ «» ±º ±¬¸»® ¬¸¿² ¬¸» ¬»¬»¼
°¿®» °¿®¬ô »®·±« ¼¿³¿¹» ³¿§ ¿ºº»½¬
§±«® ¼»ª·½»ò
ïðïíßçì
Ð ºî
--- Page 54 ---
User Manual
Installation Instructions
2.2EN-20003-G13
Safety Instructions
Appropriate Use Installation
Use SSVD and SSVD-E lubricant metering devices only for Install the metering devices at a suitable location in ac-
dispensing lubricants in centralized lubrication systems. cordance with the lubrication diagram.
Suitable Lubricants It is recommended that the metering devices be installed in
The progressive metering devices can be used for dis- such a way that the outlets are not close to the chassis or
pensing the attaching plate. This will facilitate troubleshooting in the
case the system is blocked.
- mineral oils of at least 40 mm²/s (cST) or
The main metering devices with indicator pin must be
- greases up to the penetration class NLGI 2 installed in such a way that the indicator pin is easily visible.
IMPORTANT When the push-in type fittings are used, note the follow-
ing:
It must nevertheless be ensured that the For the metering device inlet use only push-in type
oils or greases used do not alter their con- fittings (R 1/8) with reinforced collar and sealing ring.
6001a02 sistency significantly in the course of time or
For the outlet tube fittings of the SSV divider valve
under the influence of temperature or
(M 10x1) depending on the design of the lubricant line, for
pressure.
example
- high-pressure plastic hose (Ø 4.1 x 2.3) use valve bodies
General Safety Instructions with reinforced collar only, or,
The progressive centralized lubrication system connected - pressure plastic tube (Ø 6 x 1.5) use valve bodies with
to a pump must always be secured with a pressure relief knurled collar only
valve.
For the outlet fittings of the SSV M divider divider valve
Lincoln SSVD and SSVD-E lubricant metering devices are (M 8x1) pressure plastic tube (Ø 4 x 1) use valve bodies
state of the art. with knurled collar only.
Incorrect use may result in bearing damage caused by
NOTE
poor or excessive lubrication.
Each outlet needed must be provided with a check valve in In the case of construction machines or
order to be able to feed the lube points with the precise agricultural machines use high pressure
amount of lubricant and avoid poor lubrication. plastic hoses for the lubricant feet lines. In
6001a02 such cases the outlet fittings of the sec-
In the case of the metering devices model SSVD6 to 22
and SSVD6-E to 22-E outlets 1 and 2 must never be ondary metering devices and the connec-
closed. tion fittings to the lubricant points must
have a reinforced collet.
Outlets 1 and 2 of the special metering devices model
Use only the main and feed lines specified by and
SSVD6/5 to 22/21 and SSVD6/5-E to 22/21-E are con-
adhere to the specified system pressures.
nected via a channel (marked by a double arrow). One of
the two outlets must be closed. This means, the lubricant
quantity of the closed outlet is lead to the opposite outlet
Regulations for Prevention of Accidents
(see Fig. 19). To prevent accidents, observe all city, state and federal
CAUTION safety regulations of the country in which the product will
be used.
Damage due to poor lubrication! Avoid the operation with
- unapproved parts.
If, however, both outlets are connected to a - insufficient or contaminated lubricants.
lube point the bypass metering device
1013A94 SSVD6/5 to 22/21 and SSVD6/5-E to CAUTION
22/21-E cannot work to 100 %. The lubri- Danger of injury in the case of serious
cant follows the way of the lowest re- corrosion of metering device surfaces:
sistance. It reaches the lube points of An increasing corrosion of the surfaces will
outlets 1 and 2 only insufficiently or not at cause the balls pressed in to lose their hold.
all. Under pressure, they may suddenly burst
Unauthorized modifications or changes to an installed 1013A94 out and cause injuries.
system are not admissible. Any modification must be For applications in corrosive environments,
subject to prior consultation with the manufacturer of the use metering devices in stainless steel
lubrication system. version only.
Use only original spare parts (see Parts Catalog) or
the parts approved by .
Operation, Repair and Maintenance
Authorized and instructed personnel who are familiar with the
centralized lubrication systems should only perform repair.
P 5 f 28
--- Page 57 ---
Owner Manual
2.6A-20003-D04
Technical Data
M
Page 16 of 20
--- Page 58 ---
User Manual
P203 Parts Catalog
2.0EN-20003-I13
A with 2 l reservoir for grease or oil A
P203-2XYNBO & P223/233-2XNBO- without low-level control
1) 1)
2 l reservoir with lid Control: V10-13 , V20-23 ,
2) 3)
MF/MDF01 , MF/MDF02
1) 1) 1)
with stirring paddle Type of connection: 1A1.01/10 , 2A1.01/10 , 1A5.14 ,
1) 2) 3)
1A7.16 , 2A5.14 , 2A6.15
Pos. Designation Qty. Part no.
A Reservoir assembly
4)
A1 2-Liter-Behälter 1 544-31940-1
1.1 Acorn nut M4 C 1 207-12247-5
1.2 Nut M4 C 1 207-12135-2
1.3 Washer A 4.3 C 1 209-12146-2
1.4 M4 x 16 1 201-12015-4
1.5 Lid 1 221-12488-5
A2 Hose 12.5 cm 1 111-35089-2
A3 Stirring paddle incl. Pos. A2 1 544-33569-1
A4 Washer 8.4 1 209-13072-6
A5 Inner ring 2 444-24168-1
A6 Grooved ball bearing D 10/26 x 8 1 250-14009-7
A7 O-ring Ø 142 x 4 2 219-13730-7
A8 Intermediate bottom 1 444-24167-1
A9 Shim 10 x 16 x 0.5 1 209-13047-5
A10 Snap ring SW 32 2 211-14100-1
A11 Pressure ring Ø 33 x 37 x 13 1 444-24439-1
A12 Eccentric 1 444-24170-2
1)
for P203
2)
for P223/233, PCB terminals 15 + 30 bridged
3)
for P223/233, PCB terminals 15 + 30 not bridged
1)