PDF Service Manual Hyundai 35D-9S 40D-9S 45D-9S 50D-9SA Forklift - 1 MB

This comprehensive service manual covers the Hyundai 9S-series diesel forklifts, including the 35D-9S, 40D-9S, 45D-9S, and 50D-9SA models.

It is an essential resource for technicians, providing detailed instructions for repair, maintenance, and troubleshooting.

The manual includes information on the engine, hydraulics, and electrical systems.

Keep your Hyundai forklift fleet in excellent condition with this in-depth guide.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
CONTENTS


SECTION 1 GENERAL
  Group 1 Safety hints -------------------------------------------------------------------------------------------------------- 1-1
  Group 2 Specifications ----------------------------------------------------------------------------------------------------- 1-5
  Group 3 Periodic replacement ---------------------------------------------------------------------------------------- 1-13

SECTION 2 REMOVAL AND INSTALLATION OF UNIT
  Group 1 Structure ------------------------------------------------------------------------------------------------------------ 2-1
  Group 2 Removal and installation of unit ----------------------------------------------------------------------- 2-2

SECTION 3 POWER TRAIN SYSTEM
  Group 1 Structure and operation ------------------------------------------------------------------------------------ 3-1
  Group 2 Inspection and troubleshooting ------------------------------------------------------------------------ 3-13
  Group 3 Disassembly and assembly ------------------------------------------------------------------------------ 3-21

SECTION 4 BRAKE SYSTEM
  Group 1 Structure and function --------------------------------------------------------------------------------------- 4-1
  Group 2 Operational checks and troubleshooting --------------------------------------------------------- 4-8
  Group 3 Tests and adjustments -------------------------------------------------------------------------------------- 4-10

SECTION 5 STEERING SYSTEM
  Group 1 Structure and function --------------------------------------------------------------------------------------- 5-1
  Group 2 Operational checks and troubleshooting --------------------------------------------------------- 5-10
  Group 3 Disassembly and assembly ------------------------------------------------------------------------------ 5-12

SECTION 6 HYDRAULIC SYSTEM
  Group 1 Structure and function -------------------------------------------------------------------------------------- 6-1
  Group 2 Operational checks and troubleshooting -------------------------------------------------------- 6-15
  Group 3 Disassembly and assembly ----------------------------------------------------------------------------- 6-20

SECTION 7 ELECTRICAL SYSTEM
  Group 1 Component location ------------------------------------------------------------------------------------------ 7-1
  Group 2 Electrical circuit -------------------------------------------------------------------------------------------------- 7-2
  Group 3 Component specification ---------------------------------------------------------------------------------- 7-12
  Group 4 Connector destination --------------------------------------------------------------------------------------- 7-13
  Group 5 Troubleshooting -------------------------------------------------------------------------------------------------- 7-15

--- Page 3 ---
SECTION 1 GENERAL

Group 1 Safety hints --------------------- ------------------------------------------------------------------------------------ 1-1
Group 2 Specifications ----------------------------------------------------------------------------------------------------- 1-5
Group 3 Periodic replacement ---- ------------------------------------------------------------------------------------ 1-13

--- Page 4 ---
5. TORQUE CHART
 Use following table for unspecified torque.
 1) BOLT AND NUT

  (1) Coarse thread
                                        8T                                 10T
     Bolt size
                           kgf·m                  lbf·ft       kgf·m                lbf·ft
   M 6 × 1.0             0.85 ~ 1.25           6.15 ~ 9.04   1.14 ~ 1.74          8.2 ~ 12.6
   M 8 × 1.25             2.0 ~ 3.0            14.5 ~ 21.7   2.73 ~ 4.12         19.7 ~ 29.8
   M10 × 1.5              4.0 ~ 6.0            28.9 ~ 43.4    5.5 ~ 8.3          39.8 ~ 60
   M12 × 1.75             7.4 ~ 11.2           53.5 ~ 79.5    9.8 ~ 15.8           71 ~ 114
   M14 × 2.0             12.2 ~ 16.6           88.2 ~ 120    16.7 ~ 22.5          121 ~ 167
   M16 × 2.0             18.6 ~ 25.2            135 ~ 182    25.2 ~ 34.2          182 ~ 247
   M18 × 2.5             25.8 ~ 35.0            187 ~ 253    35.1 ~ 47.5          254 ~ 343
   M20 × 2.5             36.2 ~ 49.0            262 ~ 354    49.2 ~ 66.6          356 ~ 482
   M22 × 2.5             48.3 ~ 63.3            350 ~ 457    65.8 ~ 98.0          476 ~ 709
   M24 × 3.0             62.5 ~ 84.5            452 ~ 611    85.0 ~ 115           615 ~ 832
   M30 × 3.5             124 ~ 168              898 ~ 1214   169 ~ 229           1223 ~ 1655
   M36 × 4.0             174 ~ 236             1261 ~ 1703   250 ~ 310           1808 ~ 2242


  (2) Fine thread
                                        8T                                 10T
     Bolt size
                         kgf·m                    lbf·ft       kgf·m                lbf·ft
   M 8 × 1.0             2.17 ~ 3.37           15.7 ~ 24.3   3.04 ~ 4.44         22.0 ~ 32.0
   M10 × 1.25            4.46 ~ 6.66           32.3 ~ 48.2   5.93 ~ 8.93         42.9 ~ 64.6
   M12 × 1.25            7.78 ~ 11.58          76.3 ~ 83.7   10.6 ~ 16.0         76.6 ~ 115
   M14 × 1.5             13.3 ~ 18.1           96.2 ~ 130    17.9 ~ 24.1          130 ~ 174
   M16 × 1.5             19.9 ~ 26.9            144 ~ 194    26.6 ~ 36.0          193 ~ 260
   M18 × 1.5             28.6 ~ 43.6            207 ~ 315    38.4 ~ 52.0          278 ~ 376
   M20 × 1.5             40.0 ~ 54.0            289 ~ 390    53.4 ~ 72.2          386 ~ 522
   M22 × 1.5             52.7 ~ 71.3            381 ~ 515    70.7 ~ 95.7          512 ~ 692
   M24 × 2.0             67.9 ~ 91.9            491 ~ 664    90.9 ~ 123           658 ~ 890
   M30 × 2.0             137 ~ 185              990 ~ 1338   182 ~ 248           1314 ~ 1795
   M36 × 3.0             192 ~ 260             1389 ~ 1879   262 ~ 354           1893 ~ 2561


                                                  1-10

--- Page 5 ---
2) INSTALLATION
 After assembling mast components totally without piping connections, install mast assembly to the
 equipment.
ö Installation procedure for each of mast component is the reverse of the removal procedure.
(1) Mast mounting pin
 Η Check the mast mounting pins for wear, then install pins into the mast support bracket.
 Θ Jack up the machine so that the front is raised and then using an overhead hoist assemble outer
    mast to frame.
 Ι Tighten mounting socket bolts to frame.
    ÂTightening torque : 35.1~47.5 kgf·m (254~344 lbf·ft)
(2) Tilt cylinder pin
    Hold the mast with a crane, operate the tilt control lever and align the holes, then knock the pin.
(3) Lift cylinder installation and adjustment
 Η Assemble the lift cylinder inside the outer
    mast, then tighten the stopper bolt. If the
    cylinder assembly has been replaced,
    adjust as follows so that the left and right
    cylinders are synchronized at the maxi-
    mum lifting height.
 ΘAssemble the cylinder rod to the inner
    mast, and check the left-to-right play of
    the mast at the maximum lifting height.
 ö If play is to LEFT, install adjustment shim
   to LEFT cylinder.
 öIf play is to RIGHT, install adjustment
                                                                                                  D503RE03
   shim to RIGHT cylinder.
   ÂShim thickness : 1.0 mm (0.04 in)


                                                   2-6

--- Page 6 ---
SECTION 3 POWER TRAIN SYSTEM

Group 1 Structure and operation ------------------------------------------------------------------------------------ 3-1
Group 2 Inspection and troubleshooting ------------------------------------------------------------------------ 3-13
Group 3 Disassembly and assembly ------------------------------------------------------------------------------ 3-21

--- Page 7 ---
5. DRIVE AXLE
 1) STRUCTURE


               1    2    3    4    5   6     7    8     9    10           11   12   13   14


                                                                                                    35D7ETA08


  1      Sun gear                      6    Hub assy                     11    Pinion shaft
  2      Planetary gear                7    Disk brake                   12    Spider
  3      Inner gear                    8    Drive shaft                  13    Differential pinion gear
  4      Inner gear carrier            9    Differential carrier assy    14    Differential side gear
  5      Tapered bearing               10   Ring gear


 2) OPERATION
      Drive axle which consists of differential carrier assembly (9), drive shaft (8) and hub assembly (6)
      transmits the drive force from transmission to drive wheel.
      Pinion shaft (11) is connected to transmission output shaft and spline.
      The power of transmission is transmitted to differential which consists of pinion shaft (11) and ring
      gear (10) and the differential rotates the drive shaft.
      The differential transmits the drive force from transmission to wheels and one wheel's rotation
      speed is differ from the other.
      The differential consists of 4 pinions (13) , 2 side gears (14) and spider and the engagement
      between 4 pinions (13) and side gear (14) makes a right angle.
      Side gear (14) and drive shaft (8) are connected with spline and the drive shaft (8) consists of
      planetary gear (2), inner gear (3), wheel hub (6) and drive wheels.


                                                      3-10

--- Page 8 ---
No           Condition                      Possible causes                           Correction

5    Drive wheels do not rotate   (1) Broken axle shaft.
                                    a. Loose wheel bearings.                Â Re-assemble wheel bearings.
                                    b. Axle shaft too short.                Â Replace drive shaft
                                    c. Loose flange studs or nuts.          Â Tighten studs or nuts
                                  (2) D r i ve g e a r t e e t h h ave b e e n  Exchange damaged drive gear
                                      damaged.                                set
                                  (3) Side gear on differential damaged.    Â Exchange damaged gear
                                  (4) Differential pinion shaft or spider   Â Exchange damaged gear
                                      broken


                                                    3-20

--- Page 9 ---
(2) Using different kinds of shims, adjust shim
    thickness as measured by previous
    equation.
    Place shims at the bearing place.
    Using a jig, assemble drive bearing so that
    the outer race contact with the bearing
    place.


                                                         35L7ADA03


(3) Heat the inner race of bearing to max
    100°C and then assemble it to the pinion
    shaft.
    Also inner race should contact with
    bearing place.


                                                         35L7ADA04


                                                  3-30

--- Page 10 ---
3. DISASSEMBLY OF TRANSMISSION
 1) Pull torque converter (1) straight forward
    and remove from the converter housing.                               1

   Remove six bolts (3) and flexible plate (1),
   plate (2) from the torque converter.


                                                                         2   3
                                                                                 35L7ADA22


 2) Remove six socket bolts (3) and then gear
    P.T.O input from the the torque converter.               4                     6


                                                         5
                                                                                 D357TM02


 3) Remove four bolts (9) and bolts (8),                             7
    washes, oil seal (10) from the housing
    converter (7).                                               10


                                                                 9


                                                                  8              35L7ADA23


 4) Remove plug (16) and o-ring, spring (18)
    and ball (17) from the bearing plate.
 5) Remove plug (13) and spring (12), valve
    (14).
 6) Remove plug (11).


                                                                                 35L7ADA24


                                                  3-40

--- Page 11 ---
11) Put clean transmission oil on each side of
   the clutch plates and clutch discs. Install
   four 2T clutch plates, three 4T clutch plates,
   five clutch discs and one bending plate in
   the cylinder with the following procedure.
 (1) Install a clutch plate first, that has guide
     shape on its outside diameter.
 (2) Next, install a clutch disc that has teeth on
     its inside diameter.
 (3) Follow steps a and b again until all of four
     the 2T clutch plates and discs are installed
     in the cylinder.
 (4) Install a 4T clutch plate, then install a
     bending plate. In following procedure,
     bending plate shape will be downward.
 (5) Finaly, install a 4T cluch plate.
12) Use a screwdriver and install snap ring (57)
    that check all of them in position in the                 35L7ADA36

    cylinder.
13) Install a three seal rings on the shaft.
ö Be carefully, Do not damage to the seal
    rings on the counter shaft.
14) For the other side of the counter shaft
    assembly, follow the procedure in steps 5
    through 8.
15) Put clean transmission oil on each side of
    the clutch plates and clutch discs. Install
    four 2T clutch plates, three 4T clutch plates,
    five clutch discs and one bending plate in
    the cylinder with the following procedure.
 (1) First, install a 4T cluch plate.
 (2) Install a 4T clutch plate, then install a
      bending plate. In following procedure,
      bending plate shape will be downward.
 (3) Follow steps a and b again until all of four
      the 2T clutch plates and discs are installed
      in the cylinder.
 (4) Next, install a clutch disc that has teeth on
      its inside diameter.
 (5) Finally, Install a clutch plate first, that has
      guide shape on its outside diameter.


                                                       3-50

--- Page 12 ---
4. INCHING PEDAL AND LINKAGE
   The brake pedal serves to actuate the hydraulic brakes on the front axle. At the beginning of the
   pedal stroke, the inching spool of the transmission control valve is actuated to shift the hydraulic
   clutch to neutral and turn off the driving force. By treading the pedal further, the brake is applied.


                                                                    e)
                                                                     k
                                                                 tro
                                                               gs
                                                           hin
                                                         Inc


                                                                             e)
                                                                            ok
                                                       m(


                                                                         str
                                                      4m


                                                                         e
                                                  ~2


                                                                      Idl
                                                 16


                                                                    m(
                                                                4m
                                                               2~            131~139mm(Pedal height)


                                             T/M control valve


                    Inching spool
                                                 33mm(Default)


                 Inching link assy


                                     Inching cable assy


                                                                                                       35D9SBS04


                                                   4-3

--- Page 14 ---
SECTION 5 STEERING SYSTEM
 GROUP 1 STRUCTURE AND FUNCTION

1. OUTLINE


                     Steering wheel

                                                                        Steering cylinder

     Steering unit                                                               Steering axle
                                       Priority valve
                           T
                                   L
                       P
                               R


                                           P


                                            Hyd
                                           pump


                                                                    Hydraulic tank


                                                                                                 35DS7SE01


The steering system for this machine is composed of steering wheel assembly, steering unit, priority
valve steering cylinder, steering axle and piping. The steering force given to the steering wheel enters
the steering unit through the steering column. The required oil flow is sensed by the function of the
control section of the unit, and pressurized oil delivered from the hydraulic pump is fed to the steering
cylinder. The force produced by the steering cylinder moves the knuckle of steering tires through the
intermediate link.
The axle body is unit structure having steering knuckles installed to its both ends by means of kingpins.
Hub and wheel are mounted through bearing to spindle of knuckle.


                                                         5-1

--- Page 15 ---
Problem                                 cause                                 Remedy
Steering wheel turns unstea-     ÂLockout loosening.                      ÂRetighten.
dily.                            ÂMetal spring deteriorated.              ÂReplace.
Steering system makes abn-       ÂGear backlash out of adjustment.        ÂAdjust.
ormal sound or vibration.        ÂLockout loosening.                      ÂRetighten.
                                 ÂAir in oil circuit.                     ÂBleed air.
Abnormal sound heard when        Valve
steering wheel is turned fully   ÂFaulty. (Valve fails to open.)          ÂAdjust valve set pressure and check
                                                                           for specified oil pressure.
                                 Piping
                                 ÂPipe (from pump to power steering       ÂRepair or replace.
                                   cylinder) dented or clogged.
Piping makes abnormal            Oil pump                                 
sounds.                          ÂLack of oil.                            ÂAdd oil.
                                 ÂOil inlet pipe sucks air.               ÂRepair.
                                 ÂInsufficient air bleeding.              ÂBleed air completely.
Valve or valve unit makes        Oil pump
abnormal sounds.                 ÂOil inlet pipe sucks air.               ÂRepair or replace.
                                 Valve
                                 ÂFaulty. (Unbalance oil pressure)        ÂAdjust valve set pressure and check
                                                                           specified oil pressure.
                                 Piping
                                 ÂPipe (from pump to power steering)      ÂRepair or replace.
                                   dented or clogged.
                                 ÂInsufficient air bleeding.              ÂBleed air completely.
Insufficient or variable oil flow. ÂFlow control valve orifice clogged.   ÂClean
Insufficient or variable dischar- Piping
ge pressure.                      ÂPipe (from tank to pipe) dented or     ÂRepair or replace.
                                    clogged.
Steering cylinder head           ÂPacking foreign material.               ÂReplace
leakage (Piston rod)             ÂPiston rod damage.                      ÂGrind surface with oil stone.
                                 ÂRod seal damage and distortion.         ÂReplace
                                 ÂChrome gilding damage.                  ÂGrind
Steering cylinder head thread ÂO-ring damage.                             ÂReplace
(A little bit leak is no problem)
Welding leakage                  ÂCylinder tube damage.                   ÂTube replace.
Rod                              ÂTube inside damage.                     ÂGrind surface with oil store.
                                 ÂPiston seal damage and distortion       ÂReplace
Piston rod bushing inner         ÂBushing wear.                           ÂReplace
diameter excessive gap


                                                        5-11

--- Page 16 ---
(5) Press the springs together and push the
    neutral position springs into place in the
    sleeve.


                                                        5-77(2)


(6) Line up the springs and center them.


                                                        5-77(3)


(7) Guide the ring down over the sleeve.
ö The ring should be able to rotate free of
    the springs.


                                                        5-77(4)


(8) Fit the cross pin into the spool / sleeve.


                                                        5-78(1)


                                                 5-21

--- Page 17 ---
2) DISASSEMBLY
ö Before disassembling steering cylinder, release oil in the cylinder first.
 (1) Put wooden blocks against the cylinder tube, then hold in & vice.
 (2) Remove the cover by hook a wrench in the notch of cylinder head and turn counter-clockwise.
 (3) Remove the cylinder rod and piston from the tube.
 (4) Check wear condition of the sealing parts (O-ring, oil seal, dust seal, U-packing, bush). If there
     are some damage, replace with new parts.
3) CHECK AND INSPECTION                                                                          mm (in)
                                                      Criteria
            Check item                                                                 Remedy
                                      Standard size              Repair limit
    Clearance between                   0.05~0.25                   0.4
                                                                                  Replace piston seal
    piston & cylinder tube            (0.002~0.01)                 (0.02)
    Clearance between                   0.05~0.18                    0.3
                                                                                   Replace bushing
    cylinder rod & bushing            (0.002~0.007)                (0.01)
    Seals, O-ring                                     Damage                           Replace
    Cylinder rod                                       Dents                           Replace
    Cylinder tube                                      Biting                          Replace


4) ASSEMBLY
(1) Install a new piston seal around the groove on the
    piston.
ö Be careful not to scratch the seal too much during
    installation or it could not be seated properly.


                                                                                                 D353SE27


 (2) Install the rod seal to the position in the gland
     applying a slight coat with grease prior to install.


                                                                                                 D353SE28


                                                   5-31

--- Page 18 ---
3) WHEN THE TILT CONTROL LEVER IS IN THE FORWARD POSITION


                                                        9                                   8


                                               12                  13


                                                                                 2   B1   A2 B2   A3 B3   A4 B4


                                                                             P                                      T

  Steering syetem


                                         LS        CF   EF
Steering return line
                                4
                                                             G


                                     P
     Brake syetem
                                         E/G T/M         1

  Brake return line                                                     11
                                               10


                                                                                                            35D7EHS04


       When the tilt control lever is pushed forward, the spool on the second block is moved to tilt forward
       position.
       The oil from hydraulic gear pump (1) flows into main control valve (2) through the priority valve (4)
       and then goes to the large chamber of tilt cylinder (8) by pushing the load check valve of the spool.
       The oil at the small chamber of tilt cylinder (8) returns to hydraulic tank at the same time.
       When this happens, the mast tilt forward.


                                                             6-4

--- Page 19 ---
4. LIFT CYLINDER


       9 10   8 14    13 12 11                            2       1   15   16    7     6 4, 5 3


                                                                                                  D357HS12


  1   Tube assy                     7    Retaining ring                     13       DU busing
  2   Rod                           8    Gland                              14       O-ring
  3   Piston                        9    Dust wiper                         15       Spacer
  4   Piston seal                   10   Rod seal                           16       O-ring
  5   Back up ring                  11   O-ring
  6   Wear ring                     12   Guide


5. TILT CYLINDER


      18 19   20, 21, 22   7, 8 3 11 12 5, 6 4 9, 10 2        1        13 16 14 15      17


                                                 23


                                                                                                  D357HS13

  1   Tube assy                     9    O-ring                            17    Nylon nut
  2   Rod                           10   Back up ring                      18    Rod eye
  3   Gland                         11   Lock washer                       19    DU bushing
  4   DU bushing                    12   O-ring                            20    Hexagon bolt
  5   Rod seal                      13   Piston                            21    Hexagon nut
  6   Back up ring                  14   Glyd ring                         22    Spring washer
  7   Dust wiper                    15   Wear ring                         23    O-ring
  8   Snap ring                     16   O-ring


                                                6-14

--- Page 20 ---
(17) Remove seals from both bearing blocks
     and discard.


                                                            PUMP 11


3) INSPECT PARTS FOR WEAR
(1) Clean and dry all parts thoroughly prior to
    inspection. It is not necessary to inspect
    the seals as they will be replaced as new
    items.
(2) Check drive shaft spline for twisted or
    broken teeth, check keyed drive shaft for
    broken or chipped keyway. No marks or
    grooves on shaft in seal area, some
    discoloration of shaft is allowable.
(3) Inspect both the drive gear shaft and idler
    gear shafts at the bearing points and seal
    area for rough surfaces and excessive
    wear.
                                                            PUMP 12


(4) Inspect gear face for scoring or excessive
    wear. If the face edge of gear teeth are
    sharp, they will mill into the bearing blocks.
    If wear has occurred, the parts are
    unusable.


                                                            PUMP 13


                                                     6-24

--- Page 21 ---
5. TILT CYLINDER
 1) STRUCTURE


                                                                                             12
                                                                                        11

                                                                               3

                                                                          5
                                                                     6
                                                                7
                                                        8


                                        2
                                                                                        24
       22
            23                                                                     24


                               21


         18                                                                         1
                 19
                      20

                                                                     17
                                                                16
                                                         15

                                                  13

                                        14                                     ÂI.DÝO.DÝstroke :
                                    4                                            90Ý102Ý220 mm
                           9                                                     (3.5Ý4.0Ý8.7 in)
                      10                                                       Â Rod O.D : 45 mm (1.8 in)

                                                                                                        35DS7HS16


  1   Tube assy                             9    O-ring                       17    Nylon nut
  2   Rod                                   10   Back up ring                 18    Rod eye
  3   Gland                                 11   Lock washer                  19    Spherical bearing
  4   DU bushing                            12   O-ring                       20    Retaining ring
  5   Rod seal                              13   Piston                       21    Hexagon bolt
  6   Back up ring                          14   Glyd ring                    22    Hexagon nut
  7   Dust wiper                            15   Wear ring                    23    Spring washer
  8   Snap ring                             16   O-ring                       24    O-ring


                                                       6-34

--- Page 22 ---
·ELECTRICAL
 ELECTRICAL CIRCUIT (3/4, FRAME 2 OF 2)


                                                  21FV-30030-00 3OF4


                                          7-5-3

--- Page 23 ---
GROUP 3 COMPONENT SPECIFICATION

No                  Part name   Qty                             Specification

                                      12VÝ96 AHÝ2 EA
 1   Battery                    2     RC : 130 min
                                      CCA : 630A
 2   Working lamp               1     24V, 70W
 3   License lamp               1     24V, 3WÝ2
                                      24V, 25/10W (Stop/Tail)
 4   Rear Combination lamp      2     24V, 21W    (Turn)
                                      24V, 10W    (Back Up)
 5   Head lamp                  2     24V, 70W
 6   Flasher lamp               2     24V, 25/10W
 7   Glow relay                 1     24V, 300A
 8   Relay (4P)                 3     24V, 20A
 9   Relay (5P)                 3     24V, 6A
10   Flasher Unit               1     85Ü10 CM, (21W + 21W) Ý 2 + 3W Ý2
11   Back buzzer                1     24V, 90Ü5 dB, 60Ü10 C/M
13   Horn                       1     24V, MAX1.5A, 100 ~ 115 dB

                                       Float indicator     E          1/2       F

14   Fuel level sender          1      Resistance (ɮ)     105        32.5       5
                                                            0                   0.5
                                       Tolerance (ɮ)                 Ü2.5
                                                            5                  0

15   Master switch              1     24V, 180A
                                      Direction 4.5A, Tail 5A
16   Combination switch         1
                                      Head 6A, Horn 4A
17   Brake switch               1     24V, 50W
18   Working lamp switch        1     24V, 8A
19   Hazard switch              1     24V, 8A
20   Start switch               1     24V, 30A


                                      7-14

--- Page 24 ---
GROUP 2 OPERATIONAL CHECKS AND TROUBLESHOOTING

1. OPERATIONAL CHECKS
 1) FORKS
  (1) Measure thickness of root of forks and
      check that it is more than specified value.
      EX : ˶=1200 mm (47 in)
                                                 mm (in)
 STD Fork assy Applicable model Standard Limit
  S173896-02          35D-9S          50 (2.0) 45 (1.7)                            Thickness

   F13710010          40D-9S          50 (2.0) 45 (1.7)
                                                                                                     D507FK01
   F18393603          45D-9S          50 (2.0) 45 (1.7)
   F14710011         50D-9SA          60 (2.4) 54 (2.1)


 2) Set forks in middle and measure out of
    parallel and difference in height at the top of
    forks.
                                             Height
       Model            Fork length        difference
 35D/40D/45D-9S         below 1500            3 mm
 50D-9SA                above 1500           6 mm
                                                                              Difference in height
                                                                              at tip of forks

                                                                                                     D255FK02


 3) Most force is concentrated at root of fork
    and at hook, so use crack detection method
    to check cracks.

 2. MAST
 1) Check for cracks at mast stay, tilt cylinder bracket, guide bar, fork carriage and roller shaft weld.
    Check visually or use crack detection method. Repair any abnormality.
 2) Set mast vertical, raise forks about 10cm from ground and check front-to-rear clearance and left-to-
    right clearance between inner mast and fork carriage, and between outer mast and inner mast.
    Use these figures to judge if there is any play at roller or rail.
    ÂFront-to-rear clearance : Within 2.0 mm (0.08 in)

View the complete manual on HeyDownloads →