PDF Operation Manual CAT Bucyrus CL210 Load Haul Dump - 1 MB
Master the operation of your CAT Bucyrus CL210 Load Haul Dump (LHD) with this official operation manual.
It covers all aspects of machine operation, safety protocols, and daily maintenance checks.
This guide is essential for all operators to ensure safe and efficient use of the equipment in demanding underground mining environments.
Adhering to the procedures in this manual will help maximize productivity and reduce the risk of accidents.
PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
PDF viewer loading area
Text Preview from This Manual
The text below was extracted from the visible preview pages to help you confirm the manual contents before download.
--- Page 1 ---
BI643728
Revision No 1
3 July 2014
Operation
Manual
CL210 Load Haul Dump
Bucyrus Serial Number 5004091 (Caterpillar Serial Number BA200542)
SAFETY.CAT.COM
--- Page 3 ---
BI643728
Operation Manual
Section 2
General Safety and Precautions
This section contains specific safety precautions that shall be followed whilst the machine is
being used by suitably qualified operators. This list is NOT all inclusive and a measure of
commonsense should always be applied together with established and ongoing site specific
risk assessment and safety procedures.
ONLY TRAINED AND AUTHORISED OPERATORS SHALL OPERATE THIS MACHINE
DO NOT use the machine for any purpose other than its intended use.
DO NOT for any reason exceed the indicated capacity of the machine.
DO NOT operate the machine unless all operator checks and scheduled servicing
have been performed. Report any damage or faulty operation immediately
and do not operate the machine until the fault has been corrected.
DO NOT tie down or tow equipment such that the chains or slings are not rated for
the capacity of the machine and equipment.
DO NOT operate the machine unless:
There are no tags attached stating otherwise.
All covers and guards are correctly installed.
Personal protective equipment is worn.
DO NOT start the machine unless:
There are no tags attached stating otherwise.
The area around the machine is clear.
The park brake is applied.
Transmission is in neutral.
All water and oil levels are checked.
All site specific checks are completed.
DO NOT leave the machine unless:
The machine is parked in a safe place.
The transmission is in neutral.
The park brake is applied and brake head pressure is zero.
The lift arms are lowered or any attachment is flat on the ground or
supported.
The engine is stopped.
DO NOT work on the machine in low ventilated areas while the engine is running.
ALWAYS sound the horn before starting the engine to alert anyone who may be
around the machine.
ALWAYS ensure that the operator’s compartment door is closed and made secure
before operating the machine.
Rev. 0 CL210 Load Haul Dump Serial No. 5004091 5
--- Page 4 ---
BI643728
Operation Manual
TRANSMISSION GEAR CONTROL LEVER
The transmission gear control lever has four positions, first, second, third and fourth.
Shifting from one range to another can be made at any time conditions permitting.
Momentarily decrease engine revs when selecting a higher gear. Momentarily increase
engine revs when selecting a lower gear.
The transmission in the machine is modulated. This prevents severe
shocks being transmitted through the drive train when the
transmission direction is changed.
TRANSMISSION DIRECTIONAL CONTROL LEVER
A directional control lever controls the transmission and direction of travel. This lever has
three positions, forward, neutral and reverse. The engine should be at low idle when the
transmission is shifted from the neutral position to either forward or reverse direction.
The transmission must be placed in the neutral position for the starter
motor to engage when starting the engine.
If the engine starts when the transmission is not in neutral, the
machine should be tagged out of service until the problem is rectified.
Transmission Gear
Control Lever
Transmission Directional
Control Lever
TRANSMISSION CONTROLS
Rev. 0 CL210 Load Haul Dump Serial No. 5004091 15
--- Page 5 ---
BI643728
Operation Manual
HORN BUTTON
Pushing this button sounds the air horn.
It is good operating procedure to sound the horn 2-3 seconds before
an engine start or whenever approaching blind intersection.
Horn Button
RIGHT HAND SIDE OPERATOR’S PANEL
ENGINE SERVICE HOUR METER
This electric meter is mounted on the off driver’s side at the rear of the machine. Use the
hour meter to determine servicing intervals.
ENGINE HOUR METER
Rev. 0 CL210 Load Haul Dump Serial No. 5004091 25
--- Page 6 ---
BI643728
Operation Manual
ELECTRICAL ISOLATION
1. Ensure the area is clear of any obstructions and area is fit for carrying out safe
operation and maintenance.
2. Lower the lift arms or any attachment, shutdown the engine, connect the articulation
lock and chock the wheels.
3. All electrical energy is isolated once the engine has stopped.
The electrical system installed on this machine is approved/certified
as explosion protected for use in underground coal mines and may
cause an atmospheric explosion if not maintained and used in its
approved state. Such equipment is to be inspected and maintained in
accordance with the relevant regulatory authorities rules and
regulations and the conditions for which the apparatus has been
approved.
If any fault or damage is detected to the electrical system it should be
reported to the service personnel.
Do not bypass shutdown conditions or devices.
Isolating the main air isolation valve or completely draining the
pneumatic system of air will render the machine unable to be started
until it is re-energised.
Rev. 1 CL210 Load Haul Dump Serial No. 5004091 35
--- Page 8 ---
BI643728
Operation Manual
Always use the specified lubricant for the application and the region’s
seasonal temperatures. (See Section 23).
Filler Cap
Sight Gauge
COOLANT EXPANSION TANK
FUEL WATER TRAP
Check the air cleaner (see Section 4):
1. Filter condition indicator.
2. Replace filter element if indicator is in the red area.
3. Check intake pipes and hoses for loose or damaged connections.
4. Check joints are secured.
Do not operate the machine with loose intake pipe connection, this
will allow particles of dust into engine and cause serious damage.
Rev. 1 CL210 Load Haul Dump Serial No. 5004091 45
--- Page 9 ---
BI643728
Operation Manual
Check the diesel control system operation:
1. Run the engine at high idle.
2. Press the shutdown test button and hold for ten seconds.
3. Machine should shutdown and the low oil pressure display should be on.
4. The engine should not restart until the on/off toggle switch is reset.
If the engine does not shutdown do not use the machine. Report it to
the service personnel for repairs.
Perform low exhaust water shutdown test:
1. Start diesel engine system and ensure all shutdown systems are operational, allow
engine to warm up and run for several minutes.
2. Shut make up tank ball valve and remove blanking plug from the low water shutdown
test point and open ball valve.
Main Isolation Valve
Low Water Shut Down
Test Point
Rev. 0 CL210 Load Haul Dump Serial No. 5004091 55
--- Page 10 ---
BI643728
Operation Manual
Section 13
Parking on a Ramp
Do not park on a ramp unless absolutely necessary.
1. Use the concept of engine braking to help slow down the machine by letting up on
the accelerator pedal.
2. Apply the brakes and bring the machine to a halt at the side of the road.
3. Turn the machine toward the rib.
4. If possible remove the load from the attachment.
5. Apply the park brake. Observe that the brake head pressure gauge and primary park
brake valve gauge are on zero.
6. Always chock the wheels.
7. Inform mine management of the position of machine.
When on steep grades (more than 1:4). Do not rely on the park brake
to hold the machine.
Always park with attachment into the rib and chock the wheels when
on grades of more than 1:4.
Rev. 0 CL210 Load Haul Dump Serial No. 5004091 65
--- Page 11 ---
BI643728
Operation Manual
Section 18
Air Venting the Fuel System
If the engine misfires or fails to start due to air in the fuel line, the system must be bled as
follows:
1. Ensure the governor control lever is in the shut off position.
2. Unscrew the knob on the priming pump sufficiently to release it, then pump in and out
until positive pressure is observed.
3. Tighten and secure the priming pump.
4. Start the engine. If it misfires or smokes with the engine running repeat the above.
Check the fuel tank contents gauge before venting the system.
Check the fuel water separation bowl before venting the system.
Manual Fuel Primer
FUEL PRIMING PUMP
Rev. 0 CL210 Load Haul Dump Serial No. 5004091 75
--- Page 12 ---
BI643728
Operation Manual
If methane concentration is over 1.25%, it should be reported
immediately!
Bypassing of the electrical safety system is not allowed under any
circumstance!
If the air pressure is below 240 kPa (35 psi), the power up pressure
switch will not close, and the DCS will not activate
The start sequence is the same if the methane monitor is not fitted.
Rev. 1 CL210 Load Haul Dump Serial No. 5004091 85
--- Page 13 ---
BI643728
Operation Manual
Side Shift
Fork Tine Pin Block
Fork Tine Heel
Hydraulic Supply from RAS Side Shift Cylinders Hydraulic Supply from RAS
Lock Cylinder Lines Lock Cylinder Lines
10000 KG SIDE SHIFT FORK ATTACHMENT
Rev. 1 CL210 Load Haul Dump Serial No. 5004091 95