PDF Operation & Maintenance Manual Cat Bucyrus Marion 8050 Walking Dragline - 1 MB
Master the operation and maintenance of the massive Cat Bucyrus Marion 8050 Walking Dragline with this comprehensive manual.
It covers everything from pre-start checks and operating controls to scheduled maintenance tasks.
This document is critical for ensuring the safe and productive operation of this large-scale mining equipment.
PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
PDF viewer loading area
Text Preview from This Manual
The text below was extracted from the visible preview pages to help you confirm the manual contents before download.
--- Page 1 ---
BI005619
© Bucyrus
All Rights Reserved
BUCYRUS R
Technical Manual
--- Page 3 ---
BI005619
when weld repaired while SMALL. Cold weather causes faster expansion and brittleness than •
warm weather. Early detection and quick repair prevents failure. A stretch, bend or defect
often shows up in condition of surface paint. A collection of dust along a line may indicate
a crack in the metal. Look closely at areas around openings where angles are cut out. Also
check gusset connections and points where thin and heavy metals join. The good crew
watches for loose bolts, nuts, cap screws, lock washers and other locking devices. Rod bolts
are important too. Signs of scuffed paint, worn or bright spots next to any part indicate
movement and becomes second nature to most personnel. Retighten ALL bolts shortly after
initial start-up. Grease and oil stains often indicate problems. Perhaps just poor housekeep-
ing, but at least something is wrong.
Replacement and maintenance schedules may conform to planned shutdowns. Lack of pro-
per lube, poor adjustments and abuse cause and speed up wear. These facts show up as the
MAIN reasons for breakdown. If any part shows wear or distortion beyond expected normal
wear, order replacement and quickly install. The cost of parts is nothing when compared to
breakdown cost and loss of man hours and production.
Production machines operating 24 hours, 7 days every week deserve an 8 hour inspection
and cleaning every 10 days. Cleaning before inspection eliminates dirt and dust falling into
machinery parts when inspection plates and covers are removed.
On the upper works, a solvent makes removal of the accumulation of grease around bearings,
gears, motors and the like easier. The dirt shield under the drag drum and the trough under
the open gears may require a number 3 coal shovel to get the job done.
Start up the machine and dig enough to warm up machinery, open the inspection cover over
gears and pinions. Look at gear teeth as machinery slowly goes thru its paces of hoist/lower-
ing and drag-in/pay-out. Broken teeth are easy to spot, but splayed or an unusual wear pat-
tern takes a closer look.
For a quick check, run a piece of soft wire thru the gear mesh at each side of the pinion.
Measure thickness of the two adjacent loops with micrometer. The sum of the two loops in-
dicates backlash. Comparing them gives an indication of misalignment. If excessive backlash
is suspected, measure with a dial indicator. There just isn't enough room between the gear
guard and the pinion to use a feeler gauge.
Slowly rotate the upper works several times in each direction. Look at condition of roller
circle, rail, gear and swing pinion. Sound here may indicate a flat or chipped roller or even
suggest burrs or damaged teeth on the rotating pinion.
While hoist operates, check condition of point sheaves groove and bearings. Test hold down
bolts on boom point end plate. While operating drag, check fairlead sheaves, grooves and
bearings. Look at fairlead swivel. Test ALL hold down bolts with impact wrench. Check
1-4
--- Page 4 ---
BI005619
NOTE: The brakes are holding brakes ONLY and are NOT intended to stop or retard the
rotating .of the motor armature and/or machine motion EXCEPT in emergency. See PLUG-
GING THE MOTION.
6. M-G Set Stop. When this push button is pressed, it will stop all M-G sets.
7. Excitation On. This green indicating light indicates that hoist, drag and swing controllers
are energized.
8. Emergency Stop. When this red mushroom type push button is pressed ALL brakes will
set and ALL controls will de-energize. A power failure has the same effects as pushing
this button.
9. Excitation Stop. This push button energizes the hoist, drag, swing controllers and the
solenoid circuits.
The air pressure gauge is located on right side of this panel. The operator should monitor
this gauge often. The gauge should read 95 to 115 psi while machine is in operation. When
pressure drops below 95 psi, shutdown the machine and investigate the problem.
The panel located on top drag stand (left hand) contains three lights, four push buttons and
three switches. They are:
10. Key operated switch used
10 to open the ground check
Q monitor circuit. This will
11 12 disconnect the machine from
@@
13 14
the powerline.
O@
15 16
11. Window Opener. This 3 posi-
tion switch, SEAL, DOWN
O@17 18
and UP operates front cab
window. Before opening
@@19 20
make sure bottom window
locks are open. Move switch
00 SLOWLY to UP position, the
window will retract into the
cab similar to a garage door
opening. To close window
move switch to DOWN posi-
tion. After window is in closed position move switch to SEAL position. This will allow
air, from air system to enter seal around window thru a magnet valve. Next lower hand
knobs at bottom of window and tighten them down.
2-6
--- Page 5 ---
BI005619
As bucket clears the ground the swing pedal, which corresponds to desired direction of
swing is slowly depressed. (This avoids excessive bucket and rope swing). Swing and hoist
bucket at same time so that dumping height is reached at same time bucket reaches spoil.
NOTE: When swinging, make sure the bucket has been raised to clear all obstructions and
rear of machine has clearance.
As dump point is reached, reverse swing pedals bringing swing to a smooth stop. When ma-
chine comes to rest, the pedal should be brought immediately to neutral position (no pres-
sure on pedals) or else the machine will start to swing in the opposite direction.
Now, release tension on drag ropes allowing bucket to dump. As bucket dumps the hoist
controller must be returned, moved forward to a point of less power. Do not allow exces-
sive amount of drag to run out.
DO NOT hold load longer than necessary to complete the dumping cycle. After material
clears bucket, slowly depress swing pedal (direction desired) to start return swing to pit and
at same time lower bucket into pit.
While operating, the operator should observe components in his vision and be alert for pins
coming out around bucket, support and running ropes for broken strands, fraying, etc. The
wire ropes are expendable items. Kinks cause permanent damage. Replace these ropes
promptly.
Also, note any uncommon feel or noise in the machine and notify maintenance of any
problems while they are still minor.
PROPE1. CONTROL - Electrically, the propel equipment consists of:
1. D.C. drive motors on each machine side
2. A drag propel contactor and
3. A control and timing system
The motor (s) one each side independently drive its propel machinery. The drag-propel con-
tactors electrically disconnects the drag motors from the drag generators and connects the
propel motors to these generators. Thus, the drag master switch controls the propel motors
when walking. Since the two sets of propel machinery are not connected mechanically, the
two shoes are electrically timed or synchronized. This is done using a selsyn system that
detects when one shoe is getting ahead of the other. The error signal from this system slows
down the fast shoe and speeds up the slow shoe. Limit switches, detecting shoe posi-
tion, slow the shoes during the step when shoes approach the ground and when the tub
2-16
--- Page 6 ---
BI005619
NOTE: Unusually dusty or dirty atmosphere, high humidity and extreme temperatures al-
ter the effective life of a lubricant. Therefore, it shall be the responsibility of the owner/op-
erator to determine the most effective lubricant interval according to existing environmental
conditions for all components, bearings (plain and anti-friction), gears, gear cases, etc.
WIRE ROPE PENDANT LUBRICATION dislodges with the movement of strand against
strand. This permits moisture to enter and causes deterioration of the rope. The area where
greatest deflection occurs is at or adjacent to the socket connection. Experience shows this
the most likely point of boom point support bridge strand rope failure. To avoid this condi-
tion and increase,.useful life expectancy of the bridge strand support rope apply wire rope
lube to the socket area using the hand spray.
CHECK LIST for initial lubrication start up and any inspection following:
Clean up spilled petroleum products immediately.
Remove promptly any petroleum product that gets on your skin.
Don't use gasoline, naphtha, turpentine, or similar solvents to remove oil or
grease from your skin.
Don't use dirty wipe cloths.
Avoid breathing oil mist or solvent vapors.
Don't wear oil-soaked garments.
Remove grease accumulation around bearing and gears.
All grease piping connected and filled.
Proper lube supply to all bearing and lube points.
Proper oil level in all gear cases.
Open and semi-enclosed gear teeth coated with lube.
Automatic lubrication system with adequate lube supply.
3-2
--- Page 7 ---
BI005619
NO. OF LUB. METHOD AND
NAME OF PART TYPE POINTS LOCATION SYM. FREQUENCY
LUBRICATION OF ROTATING MACHINERY (1 of 4).
Main Rotating Fill at Dip Stick GL 280 gal. capacity ~
Gear Case Check Weekly
Main Rotating Shaft Anti- From Gear Case
Top Bearings Friction
1
Intermediate Shaft Anti- From Gear Case
Bearings Friction
Motor Extension Anti- From Gear Case
Shaft Bearings Friction
Rotating Shaft Anti- 4 Bottom of Upper MPG Automatic
Bearing Bottom Friction Frame
Rotating Motor Plug in Coupler MPG 500 Hrs., As
Coupler Flange Required
Rotating Pinion 2 Drip On OGL Automatic
Main Rotating 1 Fitting at Top of MPG Hand, 500 Hrs.
Shaft Spline Swing Case
Rotating Motor Anti- 2 In Motor End EMG Hand, 500 Hrs.
Friction Bell
Rotating Bearing Anti- 1 Bottom of Shaft MPG Automatic
Friction in Upper Frame
LUBRICATION OF ROLLER CIRCLE
Roller Nylatron 120 In End of Spacer MPG Every 3 to 6
Months
Roller Thrust Nylatron
Washer
3-12
--- Page 8 ---
BI005619
STANDARD LUBRICATION INSTALLATION
TYPICAL PIPE MOUNTING
U-Bolt
Angle
Min. 18" /
1/8
/
1/8
Pipe U·Bolt
DO NOT BURN
,
TYPICAL HOSE MOUNTING
Stud or 5/16 Bolt
\ ~_ Hose
lEb~ Clip
~",~~t't=~~~" ~
Every 3 Feet or as
Required
For more than one Hose,
clip one, secure others to
it with Ty-Rap
3-22
--- Page 9 ---
BI005619
A matching rail is bolted to bottom of rotating frame and is the same as the tub rail except
for the space provided to remove the rollers.
Two HOOK SHOES lift the leading edge of tub during the walking step. Each hook shoe is
pinned to a support casting that is welded to the bottom of the rotating frame. Clearance of
3/8 inch exists between the hook rail on the tub and the wear plate on hook shoe when
machine weight rests evenly on all rollers. Adjust clearance by placing or removing shims
between the wear plate and hook shoe.
Disengage hook shoe by removing the rear pin and swing hook toward rear of machine and
replace pin in top hole to hold hook shoe.
Upper Frame
-"TT'"----+--------.....:.----,
Tub r·· I,
\ \
~~
\
,l..~\'\
,
,. II.. ,
\
\
\
\
,
\
H-== . l l
\
Shims ..... \.
, t\
I I \
I I \ '. Note: Make sure the
3/8"
Clearance ¢-.- - / /
,
,
I I
I
I 3/8" min. is all around
tub.
(Min.)
'...
,"
-,,/,'
,/
"
"
----~ ",
HOOK SHOE
4-4
--- Page 11 ---
BI005619
HOIST AND/OR DRAG DRUM assemblies consists of two self supporting rope lagging sec-
tions bolted together at center with rod bolts. Parts are interchangeable.
The drum end castings and gear hub are rod bolted to the lagging.
The split double helical drive gear halves are joined together and mounted on drum end
castings as described in Engineering Data Section.
NOTE: All bolts should be checked after first week of operation, thereafter, every 500
hours. Should any bolts appear loose, repeat tightening procedure.
The drum is supported by two large diameter spherical roller bearings. The bearings are
mounted in bearing housings that are bolted to gear case and pedestal. The bearing cones
are held in place on the stub shaft by a retainer plate. Be sure spacer ring is placed over stub
shaft before bearing cone is assembled on shaft. The bearing cup is held in housing by a
retainer plate and bearing cap with rod bolts. The gear end bearing cup is held snug between
cap and plate. The opposite bearing cap is allowed to float on the drag drum while the right
end of hoist drum is allowed to float. Hand pack bearings at assembly with MPG.
HOIST OR DRAG MACHINERY GEAR CASE motors and gearbox for hoist drum are lo-
cated at left of drum. The drag drum motors and gearbox are located at right of drum.
The motors drive the drum thru a gear train consisting of motor extension shafts and inter-
mediate shaft assemblies. The shaft assemblies are mounted in an oil tight case.
The motor extension is a shaft with integral pinion that is coupled directly to motor arma-
ture shaft by a flexible coupling. The shaft is supported in the gear case by two single row
cylindrical roller bearings. The bearings and flexible coupling allow limited end play so that
pinion can self align double helical gear mesh. Refer to eccentric cartridge mounting for
gear teeth alignment.
I
The motor coupling hub is attached to the tapered motor armature shaft by the procedure
described in Engineering Data Section under installation of shrink fit pinions.
The intermediate shaft assembly consists of a large double helical gear that meshes with the
motor extension shaft pinions. The gear is attached to the shaft and integral pinion by in-
volute splines. The shaft is supported by two single row, cylindrical, roller bearings. One
bearing is mounted in a boss of the gear case. The inside end of shaft is supported by a
bearing mounted in an outboard bearing housing, bolted to gear case structure.
Only the drive gear is inside oil tight gear case. The pinion that turns main drum shaft gear
is an open gear with suitable guard. A split oil seal on the shaft between gear and pinion is
4-24
--- Page 12 ---
BI005619
To RAISE BOOM, (Once Lowered), using drag machinery power raise mast until boom sup-
port ropes are in a tight position. Remove the cribbing that was used to support the mast.
Lift boom a few inches off cribbing and set brakes. If the brakes hold in this position, they
will hold the boom at any angle.
After testing brakes, SLOWLY and CAUTIOUSLY raise boom until the bores on the mast
link and gantry are aligned. Replace the mast link pins and all lube lines atop gantry.
If boom is raised to high to insert pins,
an easy way to control a slight lowering
is snap a brake magnet valve au ICK LY
off and on with a screwdriver.
Run a wire rope up front of gantry
and attach it t.o the drag rope near
socket. Attach other end to a dozer or
truck in a tight position. Remove the
pin holding the socket to gantry.
Remove the electrical jumper from the
hoist and drag brakes and readjust all
brakes. Replace all hoist and drag ropes
to the operating position.
While pulling wire rope, remove drag rope from both drums. Attach hoist winch line to end
of drag rope to keep rope from running after it has cleared hoist d-rum.
Before starting digging cycle recheck placement of pins, retainers, lube line, etc.
Two BOOM POINT SHEAVE assemblies mount at the boom point. A sheave assembly con-
sists of a sheave that turns on two tapered roller bearings. The bearings mount on a sleeve
carrier that is supported by a ball joint and spherical bushing. The ball joint allows sheaves
to oscillate in order to follow the fleet angle of the hoist rope.
Each sheave is returned to the normal or vertical position by a torsion bar. The live end of
the torsion bar is attached to the bearing housing and the dead end is anchored to a bulk-
head in the boom structure. With an aligning pin the male member and female member of
the ball joint limit the oscillation of the sheave to a plane parallel to center line of boom.
The fixed knobbed point shaft is held in place by two bearing caps rod bolted to the boom
structure and retainer plates bolted to shaft end.
4-34
--- Page 13 ---
BI005619
PROCEDURE FOR ASSEMBLING FAIRLEAD SWIVEL PINS INTO MOUNTING
BRACKET -
1. Assemble lower swivel pin (solid pin) into lower bracket.
A. Pack pin in dry ice for a minimum of 12 hours, circulate the air inside the box to
provide even cooling of the whole pin.
B. Locate bracket so that pin may be removed from cooling box and installed into
bracket in a minimum amount of time. Suggest a dry run before freezing pin to
practice handling.
C. After installing frozen pin, maintain pressure to hold pin against shoulder in
bracket while it warms to room temperature.
2.. Assemble upper swivel pin (hollow pin) into upper bracket.
A. Assemble bearing complete, bearing retainer and bearing retainer sleeve on shaft.
B. Pack pin in dry ice for a minimum of 6 hours, circulate the air.inside the box to
provide even cooling of whole pin.
C. Locate bracket so that pin may be removed from cooling box and installed into
bracket in a minimum of time. Suggest a dry run before freezing pin to practice
handling.
D. After installing frozen pin, maintain pressure to hold assembly against bracket
clamping the bearing and bearing retainer sleeve while it warms to room tem-
perature.
FAI RLEAD SNUBBERS (two used) consist of a two pieced friction band anchored to gan-
try and wrapped on a friction housing bolted to top of fairlead swivel bracket. A bolt and
heavy spring join the band halves. Adjust snubber, by turning connection bolt nuts, tight
enough to stop any swinging of fairlead bracket at start or stop of machine rotation.
4-44
--- Page 14 ---
BI005619
NOTE: Many small motors use sealed bearings requiring no lube for 2 or 3 years. Add lube
with units stopped and drain plug removed. After adding lube, run generator or motor with
bottom plug removed for about one full hour to allow ALL excess lube to flow out.
PLEASE REPLACE DRAIN PLUG. In most cases, the main hoist, drag and swing motors
have no plug to remove. Surplus grease flows out in the pocket beneath bearing housing.
On vertical and a few horizontal motors, remove the pl.ug same as with generators. As men-
tioned in the 250 hour lube procedure, these bottom plugs are removed before lubing to see
that excess lube escapes. Probing with a clean wire assures the old grease has not hardened
and blocked the passage. PLEASE REPLACE DRAIN PLUG.
About once a year, or after 7500 operating hours; purge bearings by pumping enough lube
thru bearing while running so new grease appears at shaft or bottom plug hole. As lube seeps
out along shaft, wipe away. This is important. Finally, after 15 or 20 minutes of operation,
thoroughly clean off shaft. New grease usually appears first at bottom hole, but it may be
seen first at the shaft. PLEASE DO NOT FORGET THE DRAIN PLUG.
Whenever possible, about once in 2 years, disassemble bearings and remove ALL old lube by
thoroughly cleaning with light lube oil or petroleum solvent. Each time the bottom plug is
removed, push a clean wire into the hole to check the lube is not hard and plugging the hole.
One measuring tablespoon equals approximately one ounce of grease. Use General Electric
Company ball bearing grease D6A2C5 for their equipment. Use Westinghouse Electric
grease 1449556 for their equipment.
CAUTION: DO NOT MIX GREASE NOT OF THE SAME BASE.
In cold weather, when machine shuts down long enough to cool off, run hoist, drag and
swing motors for warm up and allowing lube to flow before starting to dig. In extreme cold
weather, motor bearings may be warmed with a radiant heater. As each set of motors warms
up, run under light loads to maintain lube flow while the next set warms up.
FEEDER CABLE must contain a provision for a groundconnection. Especially where 2300
volts and above are used. The power line end must attach (see paragraph on ground circuits)
to a suitable permanent ground. The machine end must securely attach thru a bolted con-
nection to ground machine frame. This provides a constant ground for the machine and
electrical equipment. Failure to provide adequate ground endangers workers and equipment.
POWER LINE GROUNDING CIRCUIT ADEQUATE FOR THE MACHINE CANNOT BE
OVER EMPHASIZED. Without a good grounding system, high voltage exists between the
machine and ground. The portable cable and power lines supplying the machine must have
a ground wire ample in capacity running parallel to the main wires over the entire distance
from transformer to machine. A suitable grounding system must be used at the transformer.
Consult your electric supplier or MPSD for details.
5-4
--- Page 15 ---
BI005619
The COLLECTOR RINGS transmit incoming power from tub to rotating frame. ALWAYS
DISCONNECT this incoming power at the source when servicing. This assembly consists of
four rings stacked with ceramic insulators secured to tub center pin. Location is in space
over center journal below deck of rotating frame. The brushes attach to the outside case.
Clean and inspect every 30 days.
5-14
--- Page 19 ---
BI005619
ENGINEERING STANDARD 1101-2 for wire lock cap screws. This standard establishes
recommended method for these features. Use here is for designs where maximum locking
assurance is required and periodic visual inspection is not possible. Check classification
121 F for special fasteners with 1/8" holes for I~cking with 14 gauge soft annealed wire.
RECOMMENDED WIRING METHOD: The following procedures will exert a tightening
force on cap screws as the wire is twisted tight.
~LockWire ~
~ Lock Washer •• .... •
A
yplca ., "" ~
v L R ~
~ ~
Wired in Pairs: Establish left and right hand fasteners as viewed from center of bolt circle.
Insert left end of wire thru left hand fastener from inside to outside of bolt circle. Insert
right end of wire thru right hand fastener from outside to inside of bolt circle.
BE ALERT, STAY ALERT
, "
• I
!
..
to,
".
/,
7-16
--- Page 20 ---
BI005619
teeth across the face. Roll pinions
back and forth thru the mesh sever-
al times to trace contact pattern on
gear teeth. If motor power unavail-
able, use a torque arm and BUMP
teeth on BOTH sides as pinion is
rolled back and forth. This contact
pattern may be scattered, but shows
across at least 80 percent of the
gear face. (See following sketch).
TYPICAL CONTACT PATTERNS:
After a satisfactory pattern is estab-
lished for the initial position ofthe
gear, make the SAM E contact check
at three more points on gear, spaced
90 degrees apart. A minor adjust-
ment to pinion may be necessary to
produce the best average contact on
the gear. Single Helical Double Helical
INSPECTION: Dowel ALL bearing pedestals and RECHECK ALL bolts to secure gear set-
ting. INSPECT gear teeth and REMOVE ALL metal upsets and burrs that occurred in han-
dling or assembly. CLEAN gear teeth and enclosures thoroughly BEFORE enclosing gears.
AVOID MISALIGNMENT IN
PLANE OF CENTERS: If gears
are misaligned in plane of centers,
pattern develops as shown in
sketches at right. MOV E pedestals
to correct this condition and obtain
FULL contact across ENTIRE face
width of gear.
Single Helical Double Helical
I
AVOID MISALIGNMENT AT
RIGHT ANGLE TO PLANE OF
CENTERS: If gears are misaligned
at right angles to plane of centers,
pattern develops as shown in sketch-
es at left. To correct, MOVE ped-
estals until obtaining a FU LL con-
tact across ENTI RE face width of Single Helical Double Helical
gear.
I
7-26
--- Page 21 ---
BI005619
Intermittent bands applied to large diameter strands during manufacture minimize outer
wire displacement while handling. These bands should remain on the strand until after
installation.
After accurate measurement at the factory, a longitudinal strip is placed on the strand.
During installation, it is extremely important that this longitudinal stripe is kept in a straight
line and NOT permitted to spiral around the strand.
If rotating the strand to align socket pin hole is absolutely necessary; then its BEST to
rotate in a direction opposite to the strand lay. For example, right lay strand (outer wires
spiral to the right) may be turned in a counterclockwise direction. Left lay (outer wires
spiral to left) may be turned in a clockwise direction. It is IMPORTANT that the strand be
turned so as to tighten, rather than loosen the lay of the outer wires. Exception: only if
I
adjustment is very small.
Following installation, and periodically thereafter, lube the strands at socket base for a
minimum distance of three feet.
COILS, small enough for uncoiling by hand, require that one man hold the socket tagged,
FRONT END. The second man rolls the strand coil along a level and obstacle-free surface
away from the first man. This permits the strand to uncoil naturally without spiraling
or twisting.
Please DO NOT attempt to uncoil the strand in the manner often used to uncoil a garden
hose. (DO NOT lay coil on ground and carry one end away from it). This is wrong. This
method easily results incompletely ruining the strand. Besides its not great for hoses either.
When using a swift turntable for larger diameter strands shipped in coils, as recommended,
use also a drag-type brake to prevent any rapid rotating speed from exceeding the pulling
speed. This prevents kinking and looping. The pulling device attaches to the socket tagged,
FRONT END.
Needless to say, observe all the Common Precautions also. Remember the longitudinal
stripe and keep it aligned.
REELS need a shaft thru a center hole and enough height to clear ground and revolve
properly.
Use a simple timber brake against reel flange(s) to provide uniform unwinding and prevent
slack from developing in strand on reel.
7-36
--- Page 22 ---
BI005619
TABLE 2 (cont.)
BUCKET COMPONENT PART MATERIAL - MPSD SYMBOL
;
Runne~ FR4
Shrouds CL4B
Tooth Point CFE-S, CK-QS
Top Corner Casting
Tooth Wedge
CK-Q
CK-Q
I
Top Rail Casting CK-Q
Trunnion CL4B
Wear Shoes CFE
RIGGING COMPONENT PART MATERIAL - MPSD SYMBOL
Bushings K04, Manganese
Chain Links COl
(Build-up not recommended)
Dump Block, Frame F, FHL, FK
Sheave CC2A
Retainers F
Socket Casting & Ball KP3
Equalizer Block, Frame F
Sheave CC2A
~
Wear Blocks CB
4
Pins (Build-up not recommended) KOl Ind. Hardened
Rigging Casting Misc. CFE
~
Spreader Bar CN, F, FHL
THIS INFORMATION IS FROM MPSD CI-937
~
7-46
--- Page 23 ---
BI005619
DECIMAL
MODES OF FAILURE EOUIVALENTS
GENERAL
FAILURE CONDITION I
I
EXAMPLE