PDF Operating Instructions Manual Cat Bucyrus RH200 Electric Hydraulic Excavator - 1 MB

Master the operation of the Cat Bucyrus RH200 Electric Hydraulic Excavator with this official operating instructions manual.

This document is the primary resource for machine operators, covering all controls, systems, and safety procedures.

Proper understanding and application of the information within this guide are crucial for maximizing productivity and ensuring a safe work environment in demanding mining operations.

It provides the foundation for efficient and correct machine handling.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
OPERATING INSTRUCTIONS RH200 Electric


                            Hydraulic Excavator
                            RH200 Electric No.
                            Bucyrus HEX GmbH


BA RH200(3 725 049.00)-EN

--- Page 3 ---
OPERATING INSTRUCTIONS RH200 Electric
Introduction

1 INTRODUCTION

                   Operating instructions                    Target group

Part 1 INTRODUCTION                         Operating personnel
                                                  +
       FUNDAMENTAL                          Inspection and
       SAFETY INSTRUCTIONS                  servicing personnel
                                                  +
                                            Repair personnel
Part 2 OPERATION                            Operating personnel
                                            The operating personnel must have know-
                                            how relevant to the operation and the appli-
                                            cation of this or comparable machines.


Part 3 INSPECTION AND                       Inspection and servicing personnel
                                            The inspection and servicing personnel must
       SERVICING                            have know-how relevant to the inspection
                                            and servicing of this or comparable ma-
                                            chines.

Part 4 REPAIR WORK                          Repair personnel
                                            The repair personnel must have know-how
                                            and experience relevant to the repair of this
                                            or comparable machines.

Part 5 ANNEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel
Part 6 INDEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel


BA RH200(3 725 049.00)-EN                                                                   1-1

--- Page 4 ---
OPERATING INSTRUCTIONS RH200 Electric
Introduction

machine on enclosed premises, make sure that           Noise
there is sufficient ventilation.
                                                       During operation, all sound baffles of the machine
Observe the regulations in force at the respective     must be closed.
site.
                                                       Always wear the prescribed ear protectors.
Carry out welding, flame-cutting and grinding work
on the machine only if this has been expressly au-
thorized, as there may be a risk of explosion and      Oil, grease and other chemical sub-
fire.                                                  stances
Before carrying out welding, flame-cutting and         When handling oil, grease or other chemical sub-
grinding operations, clean the machine and its sur-    stances, observe the product-related safety regula-
roundings from dust and other inflammable sub-         tions (see safety specifications).
stances and make sure that the premises are ade-
quately ventilated (risk of explosion).                Be careful when handling hot consumables (risk of
                                                       burning or scalding).

Hydraulic / pneumatc equipment
                                                       Transporting and recommissioning
Check all lines, hoses and screwed connections
regularly for leaks and obvious damage. Repair         The machine must be loaded and transported only
damage immediately. Splashed oil may cause injury      in accordance with the operating instructions.
and fire.                                              Use only appropriate means of transport and lifting
Depressurize all system sections and pressure          gear of adequate capacity.
pipes (hydraulic / pneumatic system) to be removed     The recommisioning procedure must be strictly in
in accordance with the specific instructions for the   accordance with the operating instructions.
unit concerned before carrying out any repair work.
Hydraulic- and pneumatic lines must be laid and
fitted properly. Ensure that no connections are in-
terchanged. The fittings, lengths and quality of the
hoses must comply with the technical requirements.


BA RH200(3 725 049.00)-EN                                                                            1-11

--- Page 5 ---
OPERATING INSTRUCTIONS RH200 Electric
OPeration

FIRE AND EXPLOSION HAZARD
Safety instructions

        Avoid smoking and open fire on, next
        to and below the machine.


Combustible and easily flammable substances or
liquids increase the fire and explosion hazard.
Do not store such substances on the excavator.
Clean the excavator thoroughly, if possible, with a
steam jet (rubber parts and electric components
with compressed air - refer to information label),
when, for example, oil, grease, fuel or cleaner was
spilled.
Such substances may spontaneously ignite if they
get into the vicinity of hot units.
Even battery gases can ignite in open flames or
fire.
Avoid parking the excavator in places where
– combustible substances such as coal dust or tar
  are present,
– open or smouldering fire may occur.
Remove the excavator from such an area where
combustible or easily flammable liquids have
spilled from the excavator onto the ground.
Flying sparks may cause fire on the ground that can
spread to the excavator.


BA RH200(3 725 049.00)-EN                             2-5

--- Page 6 ---
OPERATING INSTRUCTIONS RH200 Electric
 OPeration


Fig. 2-9:


BA RH200(3 725 049.00)-EN                2-15

--- Page 7 ---
OPERATING INSTRUCTIONS RH200 Electric
 OPeration

Machine number
The identification plate (Fig. 2-20:) with the machine
number is attached to the front side of the A-frame
(arrow, Fig. 2-19:).


                                                         Fig. 2-20:


Fig. 2-19:                                               Motor number
                                                         The serial number plates (Fig. 2-21:) for the electric
                                                         motor are located on the electric motor.


                                                         Fig. 2-21:


                                                         Component numbers
                                                         Other larger units also have identification plates
                                                         indicating, among other things, their serial number.
                                                         On steel components, the Bucyrus HEX part num-
                                                         ber or the serial number may be stamped into the
                                                         metal at a clearly visible place.


BA RH200(3 725 049.00)-EN                                                                                 2-25

--- Page 8 ---
OPERATING INSTRUCTIONS RH200 Electric
 OPeration


Fig. 2-47:


BA RH200(3 725 049.00)-EN                2-35

--- Page 9 ---
OPERATING INSTRUCTIONS RH200 Electric
OPeration

(Fig. 2-63)
No.    Element                          Function                                         Symbol
  30   Lamp                             Illuminates the front side of the control col-
                                        umn.

  31   Pushswitch       Emergency OFF   The entire electrical system is interrupted in
                                        all poles by the on-board circuit breaker.
                                                 Even after actuation of the
                                                 EMERGENCY STOP switch, me-
                                                 dium voltage (6.6 KV) is present
                                                 (primarily) from the transformer
                                                 station via drag cable and slip
                                                 ring assembly to the circuit brea-
                                                 ker.

  32   Key-switch                       Switches the low voltage system on and off.

  33   Buzzer                           Gives an acoustic warning signal if a fault
                                        is reported:
                                           Electric motor
                                            – winding temperature too high
                                            – bearing temperature too high

                                           bord transformer temperature too high

                                           Hydraulic oil level too low

                                           Distributor gearbox temperature too high

                                           Swing pump temperature (1 and / or 2;
                                            too high

                                           Swing gearbox temperature (1 and / or
                                            2) too high

                                           Fault in lubricating system


                                                 Lower the equipment to the
                                                 ground and switch off electric
                                                 motor immediately if the buzzer
                                                 (33) sounds and the BCS indi-
                                                 cates a fault. The buzzer (33) con-
                                                 tinues to sound until the fault has
                                                 been retified.


BA RH200(3 725 049.00)-EN                                                                   2-45

--- Page 10 ---
OPERATING INSTRUCTIONS RH200 Electric
OPeration

(Fig. 2-68:)

No.   Element                                Function                                       Symbol

 91   Switch            Emergency Operati- Actuate and hold if boom and stick must be
                        on Boom/Stick      lowered in an emergency.

 92   Button            Dumper count         RESET


 93   Switch                                 Activates boom cylinder limit switch (op-
                                             tional)

 94   Button                                 When switched it is possible to swing the
                                             uppercarriage and to drive the excavator
                                             even when the hydraulic ladder or the
                                             service station is in the lower position.
                                                        Risk of damaging the ladder or
                                                        the service station!
                                                        Be careful and swing the upper-
                                                        carriage and drive the excavator
                                                        very slowly and only a short
                                                        way.

 95   Switch            Lighting             Switches on the lighting for servicing work.


 96   Switch            Lighting             Switches the cab lighting on and off.


 97   Switch            Windscreen wiper     Activates permanent wiping.
                        rear window (op-
                        tional)

 98   Switch            Beacon (optional)    Switches the beacon on and off.


BA RH200(3 725 049.00)-EN                                                                       2-55

--- Page 11 ---
OPERATING INSTRUCTIONS RH200 Electric
 OPeration


 Assemblies resp. Measuring device               Remarks
 reservoirs
 Pump transfer        Dipstick (1, Fig. 2-74:)   Stop filling when the oil reaches the "max" mark on the
 gearbox                                         dipstick (see Part 3, chapter "Pump transfer gearbox -
                                                 Checking the gearbox oil level / Filling in oil").
 Hydraulic oil tank   BCS monitor (Fig. 2-77:), Checking the oil level:
                      Inspection glass (1, Fig. Extend the piston rods of stick and bucket cylinders
                      2-75:), signs (2, Fig. 2-75: halfway (see sign).
                      and Fig. 2-76:)
                                                   Stand working equipment on the ground.
                                                 Check oil level at an oil temperature of ca. 50 °C
                                                 (122°F), with the electric motor shut off.
                                                 Fill in oil when the oil level in the inspection glass has-
                                                 dropped below the "min" mark. Stop filling if the oil rea-
                                                 ches the "max" mark on the inspection glass or the
                                                 acoustic warning signal "Travel alarm" sounds (see
                                                 chapter "Hydraulic system - Checking the hydraulic oil
                                                 level / Refilling hydraulic oil").


Fig. 2-74:


                                                      Fig. 2-76:


Fig. 2-75:


BA RH200(3 725 049.00)-EN                                                                               2-65

--- Page 12 ---
OPERATING INSTRUCTIONS RH200 Electric
OPeration

Warm-up procedure for electric
excavators
Operator procedure during start up in
extreme cold weather
 After starting the electric motor check for any
  faults on the BCS display.
 Make sure the “SERVO” switch (74, Fig. 2-93:)
  is in the OFF position.
 Use the “Boom up” (116, Fig. 2-94: back-
  wards) or “Stick out” function (115, Fig. 2-94:
  forwards) to engage the hydraulic pumps.
  This will engage the pumps without moving the
  attachment.
 Do so until:
  - the hydraulic oil temperature reaches 10°C
  on the gauge and
  - the PTO temperature has reached 5°C.
 You can now turn ON the “SERVO” switch (74,        Fig. 2-93:
  Fig. 2-93:) and move the attachment in a slow
  function one at a time.
   Do not extend the cylinders fully.


Swing circuit warm-up before you start
digging
 Make sure the attachment or bucket is on the
  ground.
 Turn “Swing brake” switch OFF (82, Fig.
  2-93:).
 Turn “SERVO” switch ON (74).
 Use “Swing left” or “Swing right” function (115,
  Fig. 2-94:) slowly. This will heat the swing hy-
  draulic circuit quickly.                           Fig. 2-94:
 Once the swing temperature is warm you can
  lift the attachment and swing the excavator in a
  slow 360° left then right.


                                                     Fig. 2-95:


BA RH200(3 725 049.00)-EN                                         2-75

--- Page 13 ---
OPERATING INSTRUCTIONS RH200 Electric
 OPeration

Avoid extreme positions of the attach-
ment
              Parts of the attachment may damage
              the machine if they are moved into
              extreme positions (see illustrations
              Fig. 2-112: - Fig. 2-116:).
              Work carefully, avoiding extreme posi-
              tions of this kind.


                                                       Fig. 2-114:


Fig. 2-112:


                                                       Fig. 2-115:


Fig. 2-113:


                                                       Fig. 2-116:


BA RH200(3 725 049.00)-EN                                            2-85

--- Page 14 ---
OPERATING INSTRUCTIONS RH200 Electric
Inspection and servicing

3 INSPECTION AND SERVICING

                   Operating instructions                    Target group

Part 1 INTRODUCTION                         Operating personnel
                                                  +
       FUNDAMENTAL                          Inspection and
       SAFETY INSTRUCTIONS                  servicing personnel
                                                  +
                                            Repair personnel
Part 2 OPERATION                            Operating personnel
                                            The operating personnel must have know-
                                            how relevant to the operation and the appli-
                                            cation of this or comparable machines.


Part 3 INSPECTION AND                       Inspection and servicing personnel
                                            The inspection and servicing personnel must
       SERVICING                            have know-how relevant to the inspection
                                            and servicing of this or comparable ma-
                                            chines.

Part 4 REPAIR WORK                          Repair personnel
                                            The repair personnel must have know-how
                                            and experience relevant to the repair of this
                                            or comparable machines.

Part 5 ANNEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel
Part 6 INDEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel


BA RH200(3 725 049.00)-EN                                                                   3-1

--- Page 16 ---
OPERATING INSTRUCTIONS RH200 Electric
Inspection and servicing

FIRE AND EXPLOSION HAZARD
Safety Instructions
Avoid smoking and open fire on, next to and below
the machine.
Combustible and easily flammable substances or
liquids increase the fire and explosion hazard.
Do not store such substances on the excavator.
Clean the excavator thoroughly, if possible, with a
steam jet (rubber parts and electric components
with compressed air - refer to information label),
when, for example, oil, grease, fuel or cleaner was
spilled.
Such substances may spontaneously ignite if they
get into the vicinity of hot units.
Even battery gases can ignite in open flames or
fire.
Avoid parking the excavator in places where
 combustible substances such as coal dust or
   tar are present.
   open or smouldering fire may occur.
Remove the excavator from such an area where
combustible or easily flammable liquids have spil-
led from the excavator onto the ground.
Flying sparks may cause fire on the ground that
can spread to the excavator.


BA RH200(3 725 049.00)-EN                             3-11

--- Page 17 ---
OPERATING INSTRUCTIONS RH200 Electric
Inspection and servicing

Plan A – E

Plan A - after every 250 OH                               Plan B - after every 500 OH
(at 250, 750, 1250 ... OH)                                (at 500, 1500, 2500 ... OH)
Plan C - after every 1000 OH                              Plan D - after every 5000 OH
(at 1000, 2000, 3000, 4000 ... OH)                        (at 5000, 15000, 25000 ... OH)
Plan E - after every 10000 OH
(at 10000, 20000, 30000, ... OH)


                                                                                                Page 1 of 6
Location                           Servicing work                    Menge /   Plan Plan Plan Plan Plan
                                                                      No.       A       B   C   D     E
Servicing in acc.                                                                                 
with W or T
Monitoring, warning and
control elements
- Joysticks
    - Control spool,               Grease lightly                    2x45                           
      plate, cardan joint
- Pedals
    - Control spool                Grease lightly                    3x25                           
      (machine with loading
      shovel)
Electric motor                     Grease bearings                     2                            
                                   Check for vibration                                             
                                   Visual inspect interior of ma-                                   
                                   chine for degree of dirt depos-
                                   its
Rotor (inside and outside of       Visual inspect all accessible                                      
machine)                           places for rust
Terminals                          Check tightness                                                 
                                   Check for degree of dirt de-                                     
                                   posits
Coupling                           Check for alignment and re-                                        
                                   cord measurements
Screw connections                  Check condition and tightness                                     
                                   See Electric motor manufac-                                     
                                   turer´s servicing instructions
                                   for further details.


5
    apply a thin layer of low temperature grease


BA RH200(3 725 049.00)-EN                                                                             3-21

--- Page 18 ---
OPERATING INSTRUCTIONS RH200 Electric
Inspection and servicing

Inspection plan – Oil (legend)

 No. Location                               Number     Lubricant      Check oil level        Change oil
                                                      properties 14     every ... OH         every ... OH
     1   Hydraulic system                         1                          10                10000 15
                                                           II
     2   Pump transfer gearbox                    1                          60                  1000
     2   -Pre-chambers, expansion res-                                       10                  1000
         ervoir
                                                         III.a
     3   Swing gearbox                            4                          10                  1000
                                                         III.b
     4   Travel gearbox                           2                         500                  5000

         - Pre-chamber / spur gear sec-       2x1                           500                  5000
         tion (PN 2763214 only)
                                                         III.c
         - Brake-chambers                     2x2                           500                  5000

     5   On-board crane (optional)

         - Crane drive engine                     1                          10                 250 16
                                                           I
         - Hydraulic oil reservoir                1                          10                1000 17
                                                           II


14
     see "LUBRICANTS" section
15
  Change hydraulic oil every 5000 OH unless the oil is analyzed at regular intervals, but not later than every
3 years.
16
     Change oil at least once a year.
17
     Change hydraulic oil at least once a year.


BA RH200(3 725 049.00)-EN                                                                                 3-31

--- Page 19 ---
OPERATING INSTRUCTIONS RH200 Electric
Inspection and servicing

ELECTRIC MOTOR
Electric motor - Safety instruc-
tions
        Read and observe: "Inspection and
        Servicing – Safety Instructions" and
        the electric motor operating instruc-
        tions.


Secure the machine as described in the "Securing
the machine" section.
Wear protective gloves and firm working clothing.
 Switch off electric motor, to do so actuate
   switch (52, Fig. 3-17:).

 Set servicing switch (4, Fig. 3-18:) to locked
  position and secure in this position with a pad-
  lock.

                                                      Fig. 3-17:

Cleaning the electric motor
Clean the electric motor, the cooling fins, bearing
shields and ventilators from dust with compressed
air, brushes and clothes only.
Remove the fan guard before cleaning the ventila-
tor fan. Install it after cleaning.
Don't damage the protective coating while cleaning
the electric-motor.
For more information see the manufacturers man-
ual for the electric motor.
        It is not permissible to clean the elec-
        tric motor or any live excavator com-
        ponents with a steam cleaner and
        steam jet.


 After finishing work on the electric motor re-
  move the padlock from servicing switch (4, Fig.
  3-18:) and unlock.
                                                      Fig. 3-18:


BA RH200(3 725 049.00)-EN                                          3-41

--- Page 20 ---
OPERATING INSTRUCTIONS RH200 Electric
Inspection and servicing

Replacing a defective Xenon-lamp
                                           Read and observe the:
                                           „Floodlight projector, replacing the
                                           lamp, Safety instructions“.


                                    Switch off the projector, shut off the electric
                                     motor and cut out the battery main switch.

                                    Wait until the housing of the floodlight projector
                                     has cooled down.

                                    Withdraw the power supply connector from the
                                     projector.

                                    Remove four screws (1, Fig. 3-31) and with-
Fig. 3-31                            draw the reflector (2) from the projector hous-
                                     ing.
                                    Withdraw connector (Fig. 3-32) from Xenon
                                     lamp socket.
                                    Unscrew Xenon lamp holding clamp (Fig.
                                     3-33).
                                    Remove the defective Xenon lamp and replace
                                     by a new one. Do not touch the glass bulb of
                                     the lamp.
                                    Reinstall the new lamp. Screw lamp holding
                                     clamp back in place.
                                    Plug the power supply connector onto the
                                     lamp.
                                    Re-assemble the housing.
Fig. 3-32


Fig. 3-33


BA RH200(3 725 049.00)-EN                                                         3-51

--- Page 21 ---
OPERATING INSTRUCTIONS RH200 Electric
 Inspection and servicing

High-pressure filters for swing                         Checking/cleaning the filter element
                                                         Detach flange (4, Fig. 3-55:).
circuit
The excavator has three high-pressure filters (Fig.      Remove filter housings and pour out used oil.
3-54:) for the feeding circuits of the swing pumps.
                                                         Withdraw filter element (6) from filter housing
The filters are located in front of the hydraulic oil     (5).
reservoir.
             Read and observe: "Inspection and           Clean filter housings and sealing faces at filter
             servicing - Safety instructions".            head with white spirit or paraffin oil.

                                                         Insert new filter element into filter housing (5)
                                                          and refit to filter head with a new, lightly oiled
                                                          sealing ring (8).

                                                         Check the high-pressure filter for leaks after
                                                          putting it into operation.


Fig. 3-54:

Switch off the electric motor.
Risk of scalding from hot hydraulic oil.
The filter housings may also be hot.
Avoid skin contact.
Skin contact with hydraulic oil may cause skin in-
jury.
Wear protective gloves and firm protective cloth-
ing.
Collect escaping hydraulic oil and discard without      Fig. 3-55:
polluting the environment.
                                                        Replacing the filter elements
                                                         Detach the filter elements as described under
                                                          "Checking the filter elements".

                                                         Install new filter element (6, Fig. 3-55:) and re-
                                                          assemble with a new, lightly oiled sealing ring
                                                          (7).

                                                         Check the high-pressure filter for leaks after
                                                          putting it into operation.


BA RH200(3 725 049.00)-EN                                                                              3-61

--- Page 22 ---
OPERATING INSTRUCTIONS RH200 Electric
Inspection and servicing

Pump gearbox, pre-chambers                             Pump gearbox, venting
Checking oil level, topping up with oil                The gearbox is vented through the breather valve
                                                       (arrow, Fig. 3-72).
The oil level in the pre-chambers is visually at the
inspection glas (3, Fig. 3-71) in expansion reser-     Clean breather valve in accordance with servicing
voir (1).                                              plan.
The oil level should reach up at least to the middle    Unscrew breather filter, clean with white spirit
of the inspection glas (3). Top up with gearbox oil,       or paraffin oil and blow dry with compressed
if required.                                               air.

                                                        Screw breather filter back in place.


Fig. 3-71                                              Fig. 3-72


BA RH200(3 725 049.00)-EN                                                                           3-71

--- Page 23 ---
OPERATING INSTRUCTIONS RH200 Electric
 Inspection and servicing

Brake chambers - Changing oil                          Breather filters
Draining off oil                                        Unscrew breather filters (1 and 5, Fig. 3-91:)
                                                         and clean in white spirit or parafin.
 Place a collecting recipient for used oil under
  the brake-chambers.
  Choose the required capacity in accordance
  with the "Refilling quantities - Oil" table.
 Unscrew drain plugs (7, Fig. 3-91:) and drain
  off the oil completely.
  Slackening breather filter (5) allows the oil to
  run out more readily.
 Clean screw plugs (7).
 Screw screw plugs (7) back in place.


Filling in oil
Details for selecting the correct gearoil refer to
                                                       Fig. 3-92:
chapter “LUBRICANTS”.
 Unscrew screw plugs (6).
 Fill in oil through opening of breather filter (5)
  until it flows out of opening in plugs (6).
 Screw plugs (6) and breather filters (5) back in
  place.


Fig. 3-91:


BA RH200(3 725 049.00)-EN                                                                         3-81

--- Page 24 ---
OPERATING INSTRUCTIONS RH200 Electric
 Inspection and servicing

Checking the greasing pressure                        The necessary greasing pressure of 320 bar /
                                                      4641psi for the superstructure is generated by
Check every week, whether the oil pressure indi-      means of a pressure translator.
cated by pressure gauge (4, Fig. 3-111:) is 60 bars
/ 870psi (the pressure is dependind on tempera-       The greasing pressure is indicated by pressure
ture and viscosity of the oil and may vary).          gauge (9).
                                                      In the event of deviating pressure values, switch
                                                      off the electric motor and check the central greas-
                                                      ing system.
                                                      Lower oil pressure means that not all of the greas-
                                                      ing points are supplied with grease.
                                                               Higher oil pressure may cause
                                                               bursting of a greasing line.


                                                      Always refill the grease container in time to avoid
                                                      air from penetrating into the greasing system. Air in
                                                      the greasing may cause malfunctions.

Fig. 3-111:

This oil pressure is reduced so that the pressure
indicated by pressure gauge (2) is 47 – 50 bars
(681-725psi).


BA RH200(3 725 049.00)-EN                                                                             3-91

--- Page 25 ---
OPERATING INSTRUCTIONS RH200 Electric
 Inspection and servicing

Drive unit                                            Air-intake system
The drive unit comprises:                             Never start up the engine when the air filter is re-
                                                      moved.
    crane engine
                                                      Hydraulic system
    hydraulic system
                                                      See crane operating instructions.
Crane engine                                           Prior to each deployment, check the hydraulic
See operating instructions for the crane engine.        oil level at the inspection glass (12, Fig.
 Fill up fuel tank through filler (5, Fig. 3-129:)     3-129:); top up if necessary.
   after each deployment.

View the complete manual on HeyDownloads →