PDF Operating Instruction Manual Liebherr LR 1750 Crawler Crane - 1 MB

This operating instruction manual is the complete guide to the Liebherr LR 1750 crawler crane.

It provides exhaustive information on assembly, setup, control systems, and safe operation.

Due to the complexity of this massive crane, a thorough understanding of this manual is mandatory for all operators and assembly crews.

It is the key to safe and efficient project execution.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
LIEBHERR

 Crawler crane with lattice mast

                   LR 1750
                   LR 1750-010


        Operating instructions
               BAL-No.: 12821-01-02

                   Pages: 2059


Works-Number

Date


ORIGINAL OPERATING MANUAL

The operating manual is part of the crane!

It must always be available within reach!

The regulations for crane operation must be observed!


          Liebherr-Werk Ehingen GmbH
                   Postfach 1361
             D-89582 Ehingen / Donau
              : +49 (0) 7391 502–0
            Fax: +49 (0) 7391 502–3399
             : [email protected]
                 www.liebherr.com


                         1

--- Page 3 ---
Contents


                       1 Component overview S-pivot section                                            1533

                       2 Fastening points                                                              1533

                       3 Assembling the SLD/SD-boom                                                    1535

                       4 Operating the crane                                                           1609

                       5 Disassembling the SLD/SD-boom                                                 1611

                5.42 Auxiliary jib                                                                     1624

                       1 Component overview                                                            1625

                       2 Assembling the auxiliary jib                                                  1627

                       3 Operating the crane                                                           1641

                       4 Two hook operation                                                            1643

                       5 Disassembling the auxiliary jib                                               1645

                5.43 SLK boom                                                                          1646

                       1 Components                                                                    1647

                       2 Assembly                                                                      1653

                       3 Crane operation                                                               1675

                       4 Disassembly                                                                   1677

                5.61 Pulley cart                                                                       1690

                       1 Components of pulley cart                                                     1691

                       2 Installing / removing the roller cart from W-boom head                        1693

                       3 Installing / removing the pulley cart on the adapter for the auxiliary jib    1695


           6.00 Additional equipment                                                                   1699

                6.01 Heater / engine pre-heating                                                       1700

                       1 Heating the crane operator's cab                                              1701

                6.05 Emergency take-down                                                               1708

                       1 Emergency operation                                                           1709

                       2 Emergency operation with assembly plate Variation 1 (V1)                      1715

                       3 Emergency operation of slewing gear(s) with assembly plate Variation 1 (V1)   1721

                       4 Emergency operation with assembly plate(s) Variation 2 (V2)                   1725

                       5 Emergency operation slewing gear(s) with assembly plate(s) Variation 2 (V2)   1735

                       6 Emergency operation of winch 4 (W IV) on the LR1600/2 and LR1600/2-W          1739

                       7 Ending emergency operation                                                    1743

                6.08 Radio remote control                                                              1744

                       1 Radio transmitter                                                             1745


                                            LIEBHERR                                                    21

--- Page 4 ---
1.02 Product description                                                                                    027290-04


        1 Crawler travel gear

       1.1   Frame
             In-house manufactured, distortion-resistant welded structure made from high-strength, close-grained
             structural steel.
             The crawler carriers can be removed and can be installed / removed with the crane.

       1.2   Tracks
             Maintenance free, dirt protected crawler track with flat track pads.
             Pad width: 1.5 m
             Pad width: 2 m *
             Track width: 8.8 m

       1.3   Central ballast
             45 t, consisting of two ballast plates each with 10.0 t and two ballast plates with each 12.5 t.

       1.4   Drive
             Hydraulic travel drives with planetary gears.
             The crawler chains can be controlled independently and in the opposite direction.
             There is no preferred travel direction.

       1.5   Travel power
             Stepless speed from 0 km/h to 1.75 km/h.


        2 Crane superstructure
       2.1   Frame
             In-house manufactured, distortion-resistant welded structure made from high-strength, close-grained
             structural steel.
             Connection to crawler travel gear via 3-row roller rotary connection, slewable by 360°.

       2.2   Diesel engine
             –   Number of cylinders: 8
             –   Make: LIEBHERR
             –   Water cooled


             Note
              Depending on one of the respective crane configurations, one of the following engine types is
                installed on the crane, see also separate Diesel engine operating instructions!


   2.2.1     Engine type D 9508 A7
             Performance: 400 KW at 1800 rpm
             Maximum torque: 2546 Nm at 1500 rpm


   2.2.2     Engine type D 9508 A7 SCR
             Performance: 450 KW at 1800 rpm
             Maximum torque: 2671 Nm at 1500 rpm


1.02                                            LIEBHERR                                                          41

--- Page 5 ---
1.03 Technical data                                                  027294-06


   1.23      S-intermediate section 7.0 m, 2826.20
             See illustration 21


             Component                                    Weight   Width
             S-intermediate section complete              6.9 t    3.00 m
             S-intermediate section                       5.6 t
             S- and WA-bracket 2 guy rods                 1.3 t


   1.24      S-intermediate section 7.0 m, 2826.30
             See illustration 22


             Component                                    Weight   Width
             S-intermediate section complete              7.5 t    3.00 m
             S-intermediate section                       6.2 t
             S- and WA-bracket 2 guy rods                 1.3 t


   1.25      S-intermediate section 14.0 m, 2826.20
             See illustration 23


             Component                                    Weight   Width
             S-intermediate section complete              12.5 t   3.00 m
             S-intermediate section                       10.0 t
             S- and WA-bracket 2 guy rods                 2.5 t


   1.26      S-intermediate section 14.0 m, 2826.20 reinforced
             See illustration 24

             Note
              Reinforced version for flying assembly!


             Component                                    Weight   Width
             S-intermediate section complete              12.8 t   3.00 m
             S-intermediate section                       10.3 t
             S- and WA-bracket 2 guy rods                 2.5 t


1.03                                           LIEBHERR                     61

--- Page 6 ---
2.03 Job planning   2.00 Safety


                    LIEBHERR      81

--- Page 7 ---
2.04 General safety technical guidelines                 027297-16


                                           blank page!


2.04                                        LIEBHERR          101

--- Page 8 ---
2.04 General safety technical guidelines                                                                   027297-16


       15 Supporting

             DANGER
             The crane can topple over!
             When actuating the supports with attached load and / or at loaded derrick ballast guying, the incline
             and the force conditions of the entire boom system change!
             There is no shut off by the LICCON overload system!
             The crane can topple over!
             Personnel can be severely injured or killed!
              When a load is suspended, it is prohibited to actuate the support!
              When the derrick ballast guying is loaded, it is prohibited to actuate the support!

             It is absolutely essential that the crane be supported exactly in accordance with the load charts to
             ensure safe crane operation.
             The match of the sliding beams placement surfaces must be observed to ensure proper force transfer
             between the sliding beams.
             The crane may only be supported in these extension conditions.

             WARNING
             Danger of tipping over!
             If only the load side sliding beams are extended, the crane can tip over when turning or setting down
             the load!
              Move all 4 sliding beams and support cylinders out according to the data in the load chart!
              In intermediate positions between the support bases supporting is prohibited!
              Pin the sliding beams to support base according to the load chart!
              Fully insert and secure the pins!


             WARNING
             Risk of toppling the crane due to incorrect extension of the sliding beams!
             The load suspended on the hook causes tension and deformation of the hoist rope and telescopic
             boom. The same applies for operation with lattice jib and guy ropes. If the load is dropped from the
             fastening ropes or if the fastening or hoist rope breaks in this situation, a sudden relief occurs. The
             boom snaps back quickly. This can cause the crane to topple over.
             Despite previous assumption, it might become necessary to swing the load to the opposite side. This
             can cause the crane to topple over.
             The telescopic boom or counterweight momentum may cause the crane to topple when slewing from
             the longitudinal vehicle position.
              Move all 4 sliding beams and support cylinders out according to the data in the load chart!


   15.1      Aligning the crane
             In addition to the proper foundation for the supports, the horizontal alignment of the crane is of utmost
             importance for safe crane operation.

             DANGER
             The crane can topple over due to the incline position!
             If the crane is positioned at an incline and if the boom is turned towards the slope, then the boom
             radius is increased as a result!
             It is possible that the slewing gear can no longer hold the crane superstructure and, in extreme cases,
             the crane can topple over!
             Personnel can be severely injured or killed!
              Align the crane horizontally before starting crane operation!
             If the horizontal alignment of the crane has to be readjusted:
              Set the load down on the ground before readjusting the crane!


2.04                                           LIEBHERR                                                           121

--- Page 9 ---
2.04 General safety technical guidelines                                                                027297-16


             Place on hand on your head and hold the other arm on the side of the body.
             After this signal all other hand signals apply only for the main winch.

             Note
              If two or more main winches are present, then the signaller can show the number of the crane by
                pointing to it or signal with one finger.


  22.4.2     Lift with auxiliary winch


             Hold one forearm vertically with closed hand and touch the elbow of this arm with the other hand.
             After this signal all other hand signals apply only for the auxiliary winch.

  22.4.3     Lift the boom


             Hold one arm horizontally with thumb directed upward.

  22.4.4     Lower the boom


             Hold one arm horizontally with thumb directed downward.


2.04                                          LIEBHERR                                                           141

--- Page 10 ---
2.04 General safety technical guidelines                                                                      027297-16


                                       Sign   Explanation
                                              Objects, which are to be transported when accessing a ladder
                                              should not be heavy and easy to handle.


                                              Make sure that the linkages engage safely.


                                              Tighten the base extension (4 Nm to 5 Nm ).


                                              Adhere to a minimum overlap of the base extension of 120 mm .


                                              Fold the safety bridge open.


                                              The ladder must be hung on the vehicle.


             2.05 Signs on the crane


2.04                                                      LIEBHERR                                                 161

--- Page 11 ---
2.05 Signs on the crane                                                                                        029259-01


             CAUTION
             Property damage through oil change!
             If the oil specified in the operating instructions is not used during the oil change, it can lead to
             damage!
              See Crane operating instructions, chapter 7.07!


   1.56      979561108 - Counterweight


             WARNING
             Counterweight can fall down!
             If the auxiliary crane is removed on the counterweight before the counterweight is locked on both
             sides with the turntable, then the counterweight will fall down and can fatally injure assembly
             personnel!
              Do not remove the auxiliary crane until the counterweight is locked and secured on both sides with
                  the turntable! See Crane operating instructions, chapter 4.07.


   1.57      973974408 - Permissible transport weights of the components


   1.58      973974608 - Permissible transport weights of the components


2.05                                             LIEBHERR                                                           181

--- Page 12 ---
2.06 Antifall guards on the crane                                                                          028653-03


       5.2   Retaining ropes

    5.2.1    Retaining ropes on the S- and D-pivot section
             On the lattice sections, on the upper left and right hand side, are retaining ropes 1 assembled as fall
             arrest equipment.

             NOTICE
             Danger of damage!
             By hanging loads or other objects on the retaining ropes, they can be damaged and fail in case of an
             emergency!
              Never hang loads or objects on the retaining ropes 1!


             WARNING
             Risk of falling!
             During assembly / disassembly, inspection and maintenance work, personnel must be secured with
             appropriate aids to prevent them from falling!
             If this is not observed, assembly personnel can fall and suffer life-threatening or fatal injuries!
              Any work, where there is a danger of falling must be carried out with suitable aids (for example:
                  lifting platforms, scaffoldings, ladders, auxiliary crane)!
              If the work cannot be carried out with such aids nor from the ground, then the assembly personnel
                  must secure themselves with the fall arrest system 4 to avoid falling, see Crane operating
                  instructions chapter 2.04!
              The assembly personnel must hook themselves for all installation / removal work, maintenance
                  and inspection work on the lattice mast boom with approved fall arrest systems 4 on the retaining
                  ropes 1 on the left and right hand side with both snap hooks 2 and secure themselves to prevent
                  them from falling (For example: Fall arrester with self-actuating blocking function and an automatic
                  tension and pull in device for the connectors)!
              The connector must be set to a length as short as possible so that is it impossible to hit the ground
                  in case of a fall!
              Fall absorbers may not be used, because they stretch too much in case of a fall!
              On the retaining ropes 1 on the left and right hand side, no more than maximum two
                  persons may hook themselves with the snap hooks 2 and secure themselves to prevent falls, see
                  sign 5!
              Changing the snap hooks 2 over is only permissible on the connecting points from lattice section
                  to lattice section!
              When changing the snap hook 2 from lattice section to lattice section, one snap hook 2 must
                  always be hooked on one retaining rope 1!
              Never release both snap hooks 2 simultaneously from the retaining ropes 1!
              Before any assembly / disassembly work, maintenance and inspection work it must be ensured
                  that all obstacles below the work place have been removed and that there is sufficient clearance in
                  case of a fall!
              During all assembly / disassembly work, maintenance work and inspections, travel or crane
                  operation is prohibited!


2.06                                           LIEBHERR                                                           201

--- Page 13 ---
2.20 Wind influences for crane operation                                                                028802-02


             Note
              The maximum permissible wind speed (vmax) and the maximum permissible wind speed according
                to the load chart (vmax_TAB) always refers to the 3 second wind gust speed, which is present in the
                maximum hoist height.
              Instead of the 3 second wind gust speed, weather information services often report a wind speed,
                which is averaged within a time period of 10 minutes (socalled 10 minute average). It refers to the
                wind force on the Beaufort scale, normally to the medium value of the wind speed, which is
                determined within a time from of 10 minutes at a height of 10 m above ground or above sea level.
              The determining factor for the calculation of the 3 second wind gust speed in maximum height is
                significantly higher than the medium value of the wind speed, which is determined over a time of
                10 minutes at a height of 10 m above ground!

             Crane operation is generally permissible up to the maximum wind speed (vmax_TAB) specified in the
             respective load chart for the current boom length.
             Prerequisite for that is:
             – The wind exposure surface (AW) of the hoist load is not more than 1.2 m2/t


             DANGER
             Danger of tipping and overload of load carrying components!
              The maximum permissible wind speed according to the load chart (vmax_TAB) may not be
                exceeded, even if the wind exposure surfaces (AW) of the hoist load is smaller than 1.2 m2/t!
              If the wind exposure surface (AW) of the hoist load is more than 1.2 m2/t, then the maximum
                permissible wind speed (vmax) must be redetermined for the load case!


   1.3.1     Determination of maximum permissible wind speed
             The maximum permissible wind speed can be determined with the following methods:
              1.) Calculation with formula
              2.) Determination with wind force diagrams


   1.3.2     Calculation of maximum permissible wind speed with formula


                       Formula for the calculation of the maximum permissible wind speed
             The following data is required for the calculation:
             – Maximum permissible wind speed according to load chart (vmax_TAB)
             – Hoist load (mH)
             – Projection surface of hoist load (AP)
             – Wind resistance coefficient (cW)
             Description of procedure:
              1.) Calculation of wind exposure surface (AW = AP x cW)
              2.) Check if the wind exposure surface AW exceeds the limit value of 1.2 m2/t
              3.) Calculation of maximum permissible wind speed (vmax)

             Example for the calculation of the maximum permissible wind speed
             Data for calculation of load case:
             vmax_TAB = 9.0 m/s
             mH = 50.0 t
             AP = 70.0 m2
             cW = 1.4


2.20                                          LIEBHERR                                                           221

--- Page 14 ---
3.01 Crawler carrier assembly                                                                               028650-00


       3.3   Installing the assembly supports
              Attach the tackle on the four attachment brackets A.
              Lift the crawler center section 3 with the auxiliary crane and set it onto the support 28.

             The swinging out and locking procedure of the assembly support is the same for all four assembly
             supports and is therefore described only once.
              Release the transport retainer support beam: Remove the spring retainer 22 and unpin the pin 23,
                point D.

             WARNING
             Swinging out assembly support!
             If any personnel is within the swing range of the assembly support, they can be severely injured or
             killed!
              Make sure that no persons are within the swing range of the assembly support!

              Swing the support beam 3 out.
              Remove the brace 33 from the transport position P: Remove the spring retainer 39 on both sides
               and unpin the pins 40.
              Pin the strut 33 on the crawler center section 3 and on the support beam 37: Insert pins 34 on
               points E and secure with spring retainers 35.

             WARNING
             Risk of accidents due to improper support!
             If the support plates are not properly supported from below, they can sink into the ground and
             severely injure personnel!
              The supporting base must be able to safely take on the weight of the crawler center section, the
                  turntable and the crawler carrier!
              The supporting base must be made large enough for the ground conditions, with solid materials,
                  such as wood, steel or concrete slabs, see Crane operating instructions, chapter 2.04!

              Take the support plates 36 from the transport retainer B and place them on the supporting
               bases 24.
              Align the support plates 36 to the hydraulic cylinders 18.


3.01                                           LIEBHERR                                                            241

--- Page 15 ---
3.01 Crawler carrier assembly                                                                           028650-00


             Note
              For function assignment of hand levers to move the support cylinders in / out, see section “Lifting
                the crawler center section”!


             Note
              For disassembly on supports, the SA-frame must be positioned vertically!

             Make sure that the following prerequisites are met:
             – The crane must be aligned horizontally.
             – The placement location must be level and have adequate load-bearing capacity.
             – Suitable material must be available for the supporting base of the assembly supports.
             – The support plates are installed.
             – The crane engine is running.
             – The set up button D is pressed: The assembly icon 11 appears in the LICCON monitor.
             – The key button “Crawler assembly” 115 is actuated: The indicator light “Crawler
               assembly” 114 lights up.


3.01                                          LIEBHERR                                                          261

--- Page 16 ---
3.01 Crawler carrier assembly                                                                            028650-00


             Make sure that the following prerequisites are met:
             – The crane must be aligned horizontally.
             – The placement location must be level and have adequate load-bearing capacity.
             – The maximum height of the transport vehicle 4 may not exceed 1000 mm and a maximum width of
               3000 mm, see illustration 44.
             – Suitable material must be available for the supporting base of the assembly supports.
             – The support plates are installed.


   5.2.1     Removing the first crawler carrier
             See illustration 45.
             Make sure that the following prerequisites are met:
             – The crane engine is running.
             – The set up button D is pressed: The assembly icon 11 appears in the LICCON monitor.
             – The key button “Crawler assembly” 115 is actuated: The indicator light “Crawler
                assembly” 114 lights up.

             Preparing the crawler carrier for disassembly


             NOTICE
             Damage to the crawler carrier!
             If the track pads are not secured with the transport retainers to prevent them from sagging, the crawler
             carrier can be severely damaged!
              Secure the track pads 12 before assembly of the crawler carrier 9 with the chains 10 to prevent
                  them from sagging!

              Hang the chains 10 with the bars 11 on the track pads 12, see illustration 44.


             Note
              The lugs 8 must be swung between the track pads 12, “upward”!

                Swing the lugs 8 “up”.
                Pin the fastening ropes 7 on the assembly device 31 and secure.
                Luff the SA-frame 29 up until the assembly cylinder 30 is centered above the crawler carrier 9.
                Move the assembly cylinder 30 out: Actuate master switch 2.
                Pin the fastening ropes 7 on the lugs 8 and secure.
                Make sure that the pins 15 are completely unpinned on both sides on the crawler carrier.


3.01                                           LIEBHERR                                                            281

--- Page 17 ---
3.02 Turntable assembly                                                                                    025307-01


       2.1   Lifting the turntable from the flatbed trailer
             Make sure that the following prerequisite is met:
             – The brackets 20 are pinned on the receptacle points for the pivot section, points P1.
              Attach the tackle on the receptacle points, points P1 and points P2.
              Bring the tackle to “tension”.
              Release and remove the transport retainers on the turntable.

             WARNING
             Falling components!
             When lifting the turntable from the flatbed trailer, components or the turntable can fall down!
             Personnel can be severely injured or killed!
              Make sure that there are no persons within the danger zone!

              Lift the turntable with the auxiliary crane from the flatbed trailer.


3.02                                            LIEBHERR                                                        301

--- Page 18 ---
3.03 Central ballast                                                                                      028130-00


       4 Installing the central ballast

             WARNING
             Danger of slipping / falling during assembly / disassembly work!
             During assembly and disassembly work, personnel must be secured with appropriate antifall guards
             to prevent them from falling!
             Weather influences, such as wetness, wind, snow, frost increase the slipping / falling danger!
             Personnel can be severely injured or killed!
              All assembly / disassembly work must be carried out using suitable aids (lifting platforms,
                 scaffolding, ladders, auxiliary crane, etc.)!
              If work cannot be carried out on the ground or using such aids, then assembly personnel must be
                 secured with the personal fall arrest system (see Crane operating instructions, chapter 2.04) to
                 protect against falling!
              Hang in the personal antifall system in the corresponding attachment points on the crane (see
                 Crane operating instructions, chapter 2.06)!
              If railings are present on the components, then they must be brought into the corresponding
                 position and secured for assembly / disassembly work!
              Step on aids and fall arresters only with clean shoes!
              Keep aids and fall arresters clean and free from snow and ice!


             WARNING
             Falling components and central ballast plates!
             At assembly / disassembly, the components and central ballast plates can fall down!
             Personnel can be severely injured or killed!
              Make sure that no persons or objects are within the danger zone!


             WARNING
             Incorrect handling of the attachment equipment!
             If attachment equipment cannot be attached correctly and if it is not secured sufficiently to prevent it
             from loosening up, loads can fall down! Personnel can be severely injured or killed!
              Make sure that the attachment equipment is correctly attached on the attachment points and that it
                  is secured sufficiently to prevent it from loosening up!


             WARNING
             Danger of impact / crushing!
             If anyone remains within the assembly / disassembly area of the ballast, they would be exposed to a
             danger of impact / crushing!
             Personnel can be severely injured or killed!
              Make sure that there are no persons between the components which are to be assembled /
                 disassembled on the components and the crawler travel gear!


             Note
              The assembly procedure varies, depending in the equipment configuration!

             The following three equipment configurations are possible and they differ in assembly steps:
             – Crane operation on crawler carriers 5, see illustration 1
             – Crane operation on crane support 6 installed on crawler carriers 5, see illustration 2
             – Crane operation on crane support 6 installed on crawler center section 1, see illustration 3


3.03                                           LIEBHERR                                                          321

--- Page 19 ---
3.03 Central ballast                                                                                       028130-00


             Before the receptacle stud 16 is guided into the central ballast plates 2 Variation V1, it must be
             ensured that the insertion length a of the receptacle stud 16 is set correctly.
             The insertion length a of the receptacle stud 16 for central ballast plates 2 Variation V1 can be
             adjusted by hand.
              If the insertion length a of the receptacle stud 16 is to be adjusted:
                Release and unpin the pins 16.1.
              Adjust the insertion length a by moving the guide sleeve 16.2 to the desired insertion length a,
                observe the stages in illustration 4.
              Insert and secure the pin 16.1.
             Result:
             – The receptacle stud 16 is adjusted.


             Note
              The receptacle stud 16 in illustration 4 is set to 5 t!

              Attach the receptacle stud 16 on the auxiliary crane and guide it into the central ballast plate(s) 2.
              Pull up the lever 16.3 and fold it down.
              Turn the receptacle stud 16 with the lever 16.3 by 60° until it points to the symbol “Locked” 2.1 of
               the central ballast plate 2, see illustration 6.


             Note
              The receptacle stud 16 is locked by lifting the central ballast plate(s) 2.

              Lift the central ballast plate(s) 2 with the receptacle stud 16 from the base plate 3 and place them
                on a suitable storage location.
              When the central ballast plate(s) 2 are placed down:
                Turn the receptacle stud 16 with the lever 16.3 by 60° to the stop in direction of the symbol
                “unlocked” 2.2, see illustration 7.
             Result:
             – The receptacle stud 16 is unlocked.

              Carefully pull the receptacle stud 16 from the central ballast plate.


3.03                                            LIEBHERR                                                          341

--- Page 20 ---
3.05 Crane support                                               025204-01


        1 Component overview Crane support
                  1 Support beams
                  2 Support cylinder
                  3 Support plates
                  4 Swing unit
                4.1 Swing cylinder
                4.2 Guide tube
                4.3 Scale for support base
                  6 Pinning top
                  7 Pinning bottom
                  8 Eyehooks
                  9 Rigging eyehooks for