PDF Operating Instruction Manual Grove GMK 5110-1 / GMK 5130-2 Crane - 2 MB

This operating instruction manual is for the Grove GMK 5110-1 and GMK 5130-2 cranes, specifically covering the lattice extension.

It provides critical information on the safe assembly, configuration, and operation of the extension.

Crane operators must be familiar with the load charts and procedures in this manual to prevent accidents and ensure successful lifts.

Safety and precision are paramount when using crane attachments.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram ✉Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
Operating instructions
     lattice extension


                3 112 783 en
                  26.02.2011

--- Page 3 ---
Overview
                                                                         1.4 Notes about the lattice extension operating manual


              1.4                       Notes about the lattice extension operating manual


              1.4.1                     What do the symbols used mean?

                                        The signs and symbols used in this operating manual for especially impor-
                                        tant information are given in the GMK 5130-2/5110-1 operating manual
                                             Notes on the operating manual.


              1.4.2                     Deviations in case of figures

                                        This lattice extension operating manual is applicable for GMK 5130-2 and
                                        GMK 5110-1. The crane types are different from each other because
                                        GMK 5130-2 has one telescopic section more than GMK 5110-1.
                                        5130-2 is shown in the figures. If the difference is relevant for the operation,
                                        it is specified in the text or a type-relevant figure is provided.


              1.4.3

             Basic rule                 Directions always depend on whether the carrier or the superstructure is
                                        being operated.

                                        On the carrier
                                        The driver's cab is always at the front, which means that:

                                        1: Front             2: Right
                                        3:                   4: Left

                                        Forwards
                                        Backwards


                                                                                                                        s
26.02.2011


             Operating instructions lattice extension         3 112 783 en                                                1-5
             GMK 5130-2/5110-1

--- Page 4 ---
Basic safety instructions
                                                                                             2.4 Personnel qualifications


              2.4                       Personnel qualifications


             Requirements               These operating instructions are not a training manual for beginners.
                                        All descriptions are written explicitly for crane operators who have been
                                        trained to operate truck cranes.

                                        Personnel in training may only operate the truck crane under supervision.

                                        Only reliable personnel may operate or carry out work on the truck crane.

                                        The prerequisites which you, as crane operator, must fulfil are described in
                                        the GMK 5130-2/5110-1 operating manual and in the Safety manual.

                                        Only experienced personnel who are familiar with the valid accident pre-
                                        vention regulations are authorised to sling loads and instruct the crane
                                        operator.

                                        Only trained personnel may be used to maintain the truck crane.


             Training courses           Manitowoc Crane Group Germany GmbH conducts general and type-specific
                                        crane operator courses and technical courses; à Operating instructions
                                        GMK 5130-2/5110-1 Section Training information.
26.02.2011


             Operating instructions lattice extension        3 112 783 en                                            2-3
             GMK 5130-2/5110-1

--- Page 5 ---
For operations planning
                                                                                                     3.2 Swing-away lattice


              3.2.5                     Transport

                                        Observe the instructions regarding Transport and regarding Slinging points;
                                        à  p. 3 - 2.

                                                                     • Check whether all the required connections
                                                                           for transport condition are established;
                                                                           à   Transport condition with removed swing-
                                                                           away lattice, p. 4 - 39.
                                                                     • For transportation, place the lattice exten-
                                                                           sion on the skid (1) at the front and onto the
                                                                           lower connecting points (2) at the rear.
                                                                     • Always secure the lattice extension on the
                                                                           transport vehicle with belts to prevent slip-
                                                                           ping and overturning.
26.02.2011


             Operating instructions lattice extension       3 112 783 en                                              3-7
             GMK 5130-2/5110-1

--- Page 6 ---
4
             4            Swing-away lattice
             4.1          Validity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 -   1

             4.2          Short description of the operating elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 -                              3
             4.2.1          In the crane cab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 -           3
             4.2.2          Operating elements on the swing-away lattice . . . . . . . . . . . . . . . . . . . . . . . . . . 4 -                                 5
             4.2.3          Operating elements on the hand-held control . . . . . . . . . . . . . . . . . . . . . . . . . . 4 -                                  6
             4.3          Checklists for rigging work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 -                 7
             4.3.1          Overview of the required rigging work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 7
             4.3.2          CHECKLIST: Installing the 11/18 m (36/59 ft) swing-away lattice . . . . . . . . . . . . 4 - 8
             4.3.3          CHECKLIST: Removing the 11/18 m (36/59 ft) swing-away lattice . . . . . . . . . . . 4 - 11
             4.3.4          CHECKLIST: Rigging the 11 m (36 ft) swing-away lattice . . . . . . . . . . . . . . . . . . 4 - 15
             4.3.5          CHECKLIST: Rigging the 18 m (59 ft) swing-away lattice . . . . . . . . . . . . . . . . . . 4 - 21
             4.3.6          CHECKLIST: Unrigging 11 m (36 ft) swing-away lattice . . . . . . . . . . . . . . . . . . . 4 - 27
             4.3.7          CHECKLIST: Unrigging 18 m (59 ft) swing-away lattice . . . . . . . . . . . . . . . . . . . 4 - 31
             4.4          Description of rigging work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 37
             4.4.1          Swing-away lattice, securing with rope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 37
             4.4.2          Checking the transport condition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 38
             4.4.3          Checking the locking device on the hose drum . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 43
             4.4.4          Position of the hydraulic connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 44
             4.4.5          Establishing/disconnecting the hydraulic connection . . . . . . . . . . . . . . . . . . . . 4 - 45
             4.4.6          Folding the run-up rail out/in . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 46
             4.4.7          Connections when the swing-away lattice is folded up . . . . . . . . . . . . . . . . . . . 4 - 47
             4.4.8          Connections on the left and right of the main boom head . . . . . . . . . . . . . . . . . 4 - 60
             4.4.9          Swinging the swing-away lattice on to the main boom head . . . . . . . . . . . . . . 4 - 65
             4.4.10         Swinging the swing-away lattice when rigging . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 67
             4.4.11         Connections to the swing-away lattice, establishing/disconnecting . . . . . . . . . 4 - 71
             4.4.12         Electrical connections to the swing-away lattice . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 73
             4.4.13         Folding deflection sheave out/in . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 76
             4.4.14         Positioning/removing the hoist rope. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 78
             4.4.15         Installing/removing the lifting limit switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 80
             4.4.16         Installing/removing the anemometer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 83
             4.4.17         Air traffic control light – electrical connection . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 85
             4.4.18         Swing-away lattice, derricking. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 - 87


                                                                                                                                                            s
26.02.2011


             Operating instructions lattice extension                        3 112 783 en
             GMK 5130-2/5110-1

--- Page 7 ---
Swing-away lattice
                                                                                               4.3 Checklists for rigging work


                    G
                                         Risk of crushing due to swinging swing-away lattice
                                         Always secure the swing-away lattice against swinging with the guide
                                         ropes before you establish the hydraulic or electrical connection.
                                         This will prevent the swing-away lattice from swinging inadvertently to the
                                         side of the main boom and possibly crushing you.

                                          5. Establish the hydraulic connection;     à p. 4 - 45.


                                          6. Establish the electrical connection;    à p. 4 - 73.


                                          7. For further folding of:

                                             11 m (36 ft) swing-away         CHECKLIST: Unrigging 11 m (36 ft) swing-
                                             lattice:                        away lattice from point 8. à p. 4 - 28.

                                             18 m (59 ft) swing-away         CHECKLIST: Unrigging 18 m (59 ft) swing-
                                             lattice:                        away lattice from point 13. à p. 4 - 33.


                                          8. For further rigging of:

                                             11 m (36 ft) swing-away         CHECKLIST: Rigging the 11 m (36 ft) swing-
                                             lattice:                        away lattice from point 14. à p. 4 - 17.

                                             18 m (59 ft) swing-away         CHECKLIST: Rigging the 18 m (59 ft) swing-
                                             lattice:                        away lattice from point 15. à p. 4 - 23.
26.02.2011


             Operating instructions lattice extension         3 112 783 en                                               4-9
             GMK 5130-2/5110-1

--- Page 8 ---
Swing-away lattice
                                                                                              4.3 Checklists for rigging work


                                        24. Enter the current rigging mode with the rigged swing-away lattice;
                                             à Setting the SLI, p. 4 - 91.


                                        25. Enter current reeving;   à Setting the SLI, p. 4 - 91.

                                             Further steps with swing-away lattice:
                                              – Raise main boom;     à
                                                                   p. 4 - 93.
                                              – Telescope main boom;        à
                                                                         p. 4 - 94.
26.02.2011


             Operating instructions lattice extension        3 112 783 en                                              4 - 19
             GMK 5130-2/5110-1

--- Page 9 ---
Swing-away lattice
                                                                                             4.3 Checklists for rigging work


                                        12. Swing the lattice extension on to the side of the main boom with the
                                            guide rope; à   When unrigging – section 1, p. 4 - 68.


                                        13. Lower the swing-away lattice so that it is positioned on the run-up rail.


                                        14. Establish the connection in the Front area;   à Establishing a connection,
                                            p. 4 - 48.


                                        15. Disconnect the connection between section 1 and the main boom head
                                            at the right of the main boom head;  àRight-hand connection, p. 4 - 60.


                                        16. Swing the lattice extension on the run-up rail on to the main boom;
                                             à When unrigging – section 1, p. 4 - 68.


                                        17. If only Section 1 is installed:
                                              – In the Middle area, move the connection section A/main boom into
                                                                            à
                                                the position On-road driving;   p. 4 - 54.
                                              – Disconnect the connection between section 1 and the main boom in
                                                the Rear area;à    p. 4 - 57.
26.02.2011


                                              – See point 19.


                                                                                                                     s
             Operating instructions lattice extension       3 112 783 en                                              4 - 29
             GMK 5130-2/5110-1

--- Page 10 ---
Swing-away lattice
                                                                                                 4.4 Description of rigging work


             Transport condi-           The transport condition is established when all of the following connections
             tion with removed          have been made.
             swing-away lat-
             tice


                                        • Check the following connections and establish them if necessary.
                                           – In the Rear area, the connection (1) between section 1 and section 2 is
                                             established;   à  p. 4 - 59.
                                             The unneeded pins (2) are secured in the retaining sheet.
                                           – In the Middle area, the connection (3) is in the position Section 1/
                                             Section 2; à  p. 4 - 52.
                                           – The pins (4) on section 1 are secured with retaining pins.
                                           – In the Middle area, the connection (6) is established between section A
                                             and ISS,   à p. 4 - 54.
                                           – The roller lever (5) is folded in;   à p. 7 - 39.

                                                                                                                         s
26.02.2011


             Operating instructions lattice extension         3 112 783 en                                                4 - 39
             GMK 5130-2/5110-1

--- Page 11 ---
Swing-away lattice
                                                                                              4.4 Description of rigging work


                                        Releasing the connection
                                        • Check if section 1 is locked to the main boom head at the front right with
                                          both pins (1);   à p. 4 - 60.
                                        • Secure the lattice extension with a guide rope; à p. 4 - 37.


                                        • Fully raise the lattice extension; à p. 4 - 87.
                                        • The connection is released only when the holder (2) has fully moved out
                                          of the slewing axis (1).
                                          If the slewing axis is still partly in the holder, then you must pull it in as
                                          described below.


                    G
                                         Risk of accidents due to falling swing-away lattice
                                         Before releasing the connection, ensure that section 1 is pinned at the right
                                         of the main boom head.
                                         This will prevent the swing-away lattice from falling when the connection
                                         is removed and causing injury to you or other persons.


                    G
                                         Risk of accidents due to the swing-away lattice swinging of its own accord
                                         Always secure the lattice extension with a guide rope on the main boom
                                         before retracting the slewing axis.
                                         This will prevent the lattice extension from slipping off the run-up rail,
                                         swinging around and knocking you off the carrier or injuring other persons
                                         in the slewing range.


                                                                                                                      s
26.02.2011


             Operating instructions lattice extension          3 112 783 en                                            4 - 49
             GMK 5130-2/5110-1

--- Page 12 ---
Swing-away lattice
                                                                                                 4.4 Description of rigging work


                                                                      Establishing a connection
                                                                      • Pull the taper pin (4) and one other pin (2)
                                                                            from the holder (1).
                                                                      • Insert the pin (2) into the upper connecting
                                                                            point (3).
                                                                      • Insert the conical pin (4) into the lower con-
                                                                            necting point (5).
                                                                      • Secure the pins (2) and (4) using the retain-
                                                                            ing pins.


                                        Releasing the connection
                                        • Before releasing the connection, check that
                                           – the connection is established in the Front area;      à p. 4 - 48,
                                           – the connection in the Middle area is in the position Section 2/main boom;
                                              à  p. 4 - 53.
                                           – Release the connection between section 2 and the main boom in the
                                             Rear area; à  p. 4 - 57.


                    G
                                         Risk of accidents due to falling parts!
                                         Before undoing the connection, make sure all of the aforementioned con-
                                         nections have been established.
                                         In this way you will prevent either section 2 or section 1 or both falling
                                         down when the connection is released.


                                                                      • Pull the pins (2) out of the connecting
                                                                            points (3).
                                                                      • Insert the pins into the holder (1).
                                                                      • Secure the pins using the retaining pins.


                                                                                                                         s
26.02.2011


             Operating instructions lattice extension        3 112 783 en                                                 4 - 59
             GMK 5130-2/5110-1

--- Page 13 ---
Swing-away lattice
                                                                                           4.4 Description of rigging work


             When rigging –             When rigging the 18 m (59 ft) swing-away lattice you must also swing out
             section 2                  section 2 in front of section 1.


                    G
                                         Risk of accidents through section 2 swinging of its own accord
                                         Always secure section 2 with a guide rope before you release the connec-
                                         tion between section 1 and section 2 and only position the ladder on the left
                                         at section 1.
                                         In this way you prevent section 2 from swinging round of its own accord
                                         when the connection is released and knocking you off the ladder.


                                        • Fasten a guide rope to the front at section 2.
                                        • Secure section 2 against swinging round.
                                          Get a helper to hold the guide rope taut, or fasten it to the bottom of
                                          section 1.


                                        • In the Middle area, move the connection into the position Section 1;
                                          à p. 4 - 53.


                    G
                                         Risk of accidents through section 2 swinging round
                                         Make sure that there are no people or objects in the slewing range of the
                                         swing-away lattice and always swing out the swing-away lattice with a
                                         guide rope from the ground.


                                        • Swing section 2 in front of section 1 using the guide rope.
                                        • Secure section 2 against swinging round.
                                          Get a helper to hold the guide rope taut.


                                        • If you are working alone, secure section 2 from swinging round on the
                                          left-hand side at section 1 using a second guide rope (1).
                                        • Establish the left-hand connection between section 2 and section 1;
                                          à p. 4 - 71.

                                                                                                                   s
26.02.2011


             Operating instructions lattice extension        3 112 783 en                                           4 - 69
             GMK 5130-2/5110-1

--- Page 14 ---
Swing-away lattice
                                                                                               4.4 Description of rigging work


             Possible reeving
             methods on the
             swing-away lat-
             tice


                              1 sheave hook block
                              Max. lifting capacity of the hook block        20 t (44,000 lbs)
                              Max. lifting capacity with the
                              GMK 5130-2/5110-1:
                               A for 1 x reeving                             7.1 t (16,000 lbs)
                               B for 2 x reeving                            14.2 t (31,800 lbs)


                              Hook tackle
                              Max. lifting capacity of the hook tackle      8 t (17,600 lbs)
                              Max. lifting capacity with the
                              GMK 5130-2/5110-1:
                               A for 1 x reeving                            7.1 t (16,000 lbs)


                                        • With a 2 x reeving, fasten the rope end clamp to the attachment plate (1).
26.02.2011


             Operating instructions lattice extension        3 112 783 en                                               4 - 79
             GMK 5130-2/5110-1

--- Page 15 ---
Swing-away lattice
                                                                                            4.4 Description of rigging work


             During operation           Switching on the derricking gear
                                        All power units are switched off and the lamps in the corresponding buttons
                                        light up only dimly after the ignition is switched on.

                                        • Press the button (1) once.
                                           – The lamp in button (1) lights up brightly.
                                           – The symbol (2) is green if the derricking gear is switched on.
                                        If the control lever is assigned more than one function, all other power units
                                        which are assigned the same control lever operation are switched off.


                                        Raising and lowering
                                        You can adjust the sensitivity of the control levers to the operating condi-
                                        tions; à Operating instructions GMK 5130-2/5110-1.


                    G
                                         Risk of accidents due to unexpected crane movements!
                                         In the case of multiple configuration, check whether the control lever func-
                                         tion Derricking is switched on before you move the control lever for derrick-
                                         ing.
                                         This way, you avoid accidents due to unexpected crane movements.


                                        To lower:        Push the control lever to the right – the swing-away lattice
                                                         is lowered.
                                        To raise:        Push the control lever to the left – the swing-away lattice
                                                         is raised.


                                        The maximum derricking speed is automatically reduced as the system
                                        length is increased. If you now reduce the working radius (e.g. by retracting
                                        the telescoping), the derricking speed is automatically increased again.

                                        You can set the desired engine speed (idling speed) with the button (1);
                                        à  Operating instructions GMK 5130-2/5110-1.


                                        You can limit the maximum derricking speed; à Operating instructions
                                        GMK 5130-2/5110-1.


                                                                                                                    s
26.02.2011


             Operating instructions lattice extension        3 112 783 en                                            4 - 89
             GMK 5130-2/5110-1

--- Page 16 ---
Swing-away lattice
                                                                                          4.6 Tracing and eliminating malfunctions


              4.6                       Tracing and eliminating malfunctions


              Malfunction                               Cause                               Remedy

              Lifting limit switch switches             Lifting limit switch not con-       Connect the lifting limit
              off (lamp   N  lights up)                 nected                              switch;   à
                                                                                                      p. 4 - 80.

                                                        The connection for the lifting      Override the lifting limit
                                                        limit switch on the main boom       switch on the main boom
                                                        head is not overridden.             head;   à p. 4 - 80.
                                                        There is a second lifting limit
                                                        switch connected to the main
                                                        boom and it is not locked.
                                                        For 11 m (36 ft):                   Establish the electrical con-
                                                        Electrical connection between       nection;   à p. 4 - 73.
                                                        main boom head and
                                                        section 1 is not established.
                                                        The bridging plug is not            Change over the bridging
                                                        inserted in the socket to the       plug;  àp. 4 - 74.
                                                        front of section 1.
                                                        Electrical connection between       Establish electrical connec-
                                                        ISS and section A is not estab-     tion; à  p. 4 - 73.
                                                        lished.

                                                        For 18 m (59 ft):                   Establish the electrical con-
                                                        Electrical connection between       nection;   à p. 4 - 75.
                                                        main boom head and
                                                        section 1 is not established.
                                                        The connection for the lifting      Override the lifting limit
                                                        limit switch on the ISS is not      switch on the ISS;
                                                        overridden.                         à  p. 7 - 41.

                                                        Electrical connection between       Establish the electrical con-
                                                        section 1 and section 2 is not      nection;   à p. 4 - 75.
                                                        established.
                                                        Electrical connection between       Establish the electrical con-
                                                        ISS and section A is not estab-     nection;   à p. 4 - 73.
                                                        lished.

              The main boom cannot be tel-              The main boom is at an              Derrick the main boom to the
              escoped with the rigged lat-              impermissible angle                 required angle;    à
                                                                                                               p. 4 - 94.
              tice extension


                                                                                                                          s
26.02.2011


             Operating instructions lattice extension            3 112 783 en                                               4 - 99
             GMK 5130-2/5110-1

--- Page 18 ---
Boom extension
                                                                                                5.1 Checklists for rigging work


                                         5. Unreeve the hoist rope from the hook block and remove it from the lat-
                                            tice extension;    à
                                                               Positioning/removing the hoist rope, p. 5 - 23.


                                         6. Take off the hoist rope, and fold the deflection sheaves on to the swing-

View the complete manual on HeyDownloads →