PDF Operating Instruction Manual Cat Bucyrus RH120E Electric Hydraulic Shovel - 816 KB

Master the operation of the powerful Cat Bucyrus RH120E Electric Hydraulic Shovel with this official operating instruction manual.

It covers all aspects of the machine's functions, from start-up to shutdown, including critical safety protocols.

This guide is essential for training operators and ensuring the massive shovel is used productively and safely in demanding mining environments.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram βœ‰Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
OPERATING INSTRUCTIONS RH120E Electric


                             Hydraulic Excavator
                             RH120E Electric No.
                             Bucyrus HEX GmbH


BA RH120E(3 725 055.01)-EN

--- Page 3 ---
OPERATING INSTRUCTIONS RH120E Electric
Introduction

1 INTRODUCTION

                   Operating instructions                    Target group

Part 1 INTRODUCTION                         Operating personnel
                                                  +
       FUNDAMENTAL                          Inspection and
       SAFETY INSTRUCTIONS                  servicing personnel
                                                  +
                                            Repair personnel
Part 2 OPERATION                            Operating personnel
                                            The operating personnel must have know-
                                            how relevant to the operation and the appli-
                                            cation of this or comparable machines.


Part 3 INSPECTION AND                       Inspection and servicing personnel
                                            The inspection and servicing personnel must
       SERVICING                            have know-how relevant to the inspection
                                            and servicing of this or comparable ma-
                                            chines.

Part 4 REPAIR WORK                          Repair personnel
                                            The repair personnel must have know-how
                                            and experience relevant to the repair of this
                                            or comparable machines.

Part 5 ANNEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel
Part 6 INDEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel


BA RH120E(3 725 055.01)-EN                                                                  1-1

--- Page 4 ---
OPERATING INSTRUCTIONS RH120E Electric
Introduction

Gas, dust, steam and smoke                              Noise
Always start and operate the engine in a well-          During operation, all sound baffles of the machine
vented area;                                            must be closed.
If in an enclosed area, vent the exhaust to the out-    Always wear the prescribed ear protectors.
side;
Do not modify or tamper with the exhaust system
                                                        Oil, grease and other chemical sub-
Diesel engine exhaust and some of its constituents      stances
are known to cause cancer, birth defects, and
other reproductive harm                                 When handling oil, grease or other chemical sub-
                                                        stances, observe the product-related safety regula-
Operate fuel-operated heating systems only on
                                                        tions (see safety specifications).
adequately ventilated premises. Before starting the
machine on enclosed premises, make sure that            Be careful when handling hot consumables (risk of
there is sufficient ventilation.                        burning or scalding).
Observe the regulations in force at the respective
site.
                                                        Transporting and recommission-
Carry out welding, flame-cutting and grinding work
on the machine only if this has been expressly          ing
authorized, as there may be a risk of explosion and     The machine must be loaded and transported only
fire.                                                   in accordance with the operating instructions.
Before carrying out welding, flame-cutting and          Use only appropriate means of transport and lifting
grinding operations, clean the machine and its          gear of adequate capacity.
surroundings from dust and other inflammable            The recommisioning procedure must be strictly in
substances and make sure that the premises are          accordance with the operating instructions.
adequately ventilated (risk of explosion).


Hydraulic equipment
Check all lines, hoses and screwed connections
regularly for leaks and obvious damage. Repair
damage immediately. Splashed oil may cause
injury and fire.
Depressurize all system sections and pressure
pipes to be removed in accordance with the spe-
cific instructions for the unit concerned before car-
rying out any repair work.
Hydraulic lines must be laid and fitted properly.
Ensure that no connections are interchanged. The
fittings, lengths and quality of the hoses must com-
ply with the technical requirements.


BA RH120E(3 725 055.01)-EN                                                                             1-9

--- Page 5 ---
OPERATING INSTRUCTIONS RH120E Electric
Operation

                                                        Place suitable fire guardings (fire barriers) if open
FIRE AND EXPLOSION HAZARD                               fire or flying sparks cannot be avoided during re-
         Safety instructions                            pair work.
         Prior to commencing work, obtain               Apply special protection to cables, cable ducts as
         information on the national and corpo-         well as to hose and pipe lines.
         rate rules for the prevention of acci-         If necessary, also cover the ground with fire-
         dents.                                         protective blankets.
         Pay particular attention to hazards            Ensure sufficient ventilation.
         caused by combustible and easily               Clean the excavator before starting a job.
         flammable substances.on the safe               Do not keep any fire extinguishers that are not
         handling of the fire extinguishers to          suitable or have not been tested.
         be used.
                                                        Do not extinguish flammable liquids with water.
                                                        Use:
Avoid smoking and open fire on, next to and below       ο‚§ dry-powder,
the excavator.
                                                        ο‚§   carbon-dioxide or
Combustible and easily flammable substances or
liquids increase the fire and explosion hazard.         ο‚§   foam extinguishing compounds.
Do not store or handle any flammable substances         When getting into contact with burning substances,
during operation.                                       the fire-fighting water would abruptly evaporate
Clean the excavator thoroughly, if possible, with a     and distribute the substance such as burning oil
steam jet (rubber parts and electric components         over a wide area. Water causes short-circuits in
with compressed air - refer to information label),      the electrical system thus possibly entailing new
when, for example, oil, grease, solvent or cleaner      hazards.
was spilled.                                                             DANGER TO LIFE
Such substances may spontaneously ignite if they        Call the fire brigade.
get into the vicinity of hot units or objects.          Have all your welding, flame cutting and grinding
Even battery gases can ignite in open flames or         work approved.
fire.
Avoid parking the excavator in places where
ο‚§ combustible substances such as coal dust or
   tar are present.
ο‚§   open or smouldering fire may occur.
Remove the excavator from such an area where
combustible or easily flammable liquids have
spilled from the excavator onto the ground.
Flying sparks (caused by welding, flame cutting,
grinding, electrical short-circuit) may cause fire on
the ground that can spread to the excavator.


BA RH120E(3 725 055.01)-EN                                                                               2-5

--- Page 6 ---
OPERATING INSTRUCTIONS RH120E Electric
 Operation

Swinging ladder                                       Lowering the swinging ladder (from the upper
                                                      carriage)
Raising resp. lowering the swinging ladder (Fig.      οƒœ Start electric motor.
2-12:).
                                                      οƒœ Push lever (1, Fig. 2-13:) on control valve (2)
                                                        downwards to position β€œ II β€œ.
                                                        The swinging ladder is lowered (Fig. 2-12:).

                                                      The swinging ladder can also be lowered when the
                                                      electric motor ist stopped.


Fig. 2-12:

Raising the swinging ladder (from the upper
carriage)
οƒœ Start electric motor.

οƒœ Pull lever (1, , Fig. 2-13:) on control valve (2)
                                                      Fig. 2-14:
  upwards to position β€œ I β€œ.
  The swinging ladder is raised (Fig. 2-14:).         Lowering the swinging ladder (from the bottom)
                                                      οƒœ Pull down rope (3, Fig. 2-15:).
                                                         The swinging ladder is lowered (Fig. 2-12:).


Fig. 2-13:

             The upper carriage can only be swung
             when the folding ladder is raised        Fig. 2-15:
             completely (Fig. 2-14:).


BA RH120E(3 725 055.01)-EN                                                                           2-15

--- Page 7 ---
OPERATING INSTRUCTIONS RH120E Electric
 Operation

Emergency escape device (op-
tional)
Elements of the harness
(Fig. 2-36:- Fig. 2-38:)
  Pos. Designation
    1     Back support
    2     Shoulder belt
    3     Shoulder belt
    4     Loop (chest belt)
    5     Loop (chest belt)
    6     Loop (back support)
   11 Holding device
   12 Fall arrester
   13 Guidance line
                                Fig. 2-37:
   14 Hanging up line
   15 Handbag with harness
   16 Snap hook
   17 Hook safety device


                                Fig. 2-38:


                                             See Description of the supplier.
Fig. 2-36:


                                Important hints
                                Before using operator shall have received adequate
                                training.
                                The harness must be used by one person only.
                                He is responsible for the appropriate use and main-
                                tenance.
                                Visual inspection is recommended prior to each
                                use; if necessary it must be checked by an expert.
                                Harness must be checked annualy (every 12
                                month) by an expert.


BA RH120E(3 725 055.01)-EN                                                      2-25

--- Page 8 ---
OPERATING INSTRUCTIONS RH120E Electric
Operation

(Fig. 2-50:)

No.    Element                                 Function                                      Symbol

  41   Indicator lamp   Medium voltage         Lamp is lit up when the circuit breaker is
                                               switched on. Medium voltage 6.3 kV applied.

  42   Indicator lamp   Rotary field monito-   Lamp is lit up when the rotary field (phas-
                        ring                   ing) is correct.

  51   Button           Electric motor ON      Switches on the electric motor.


  52   Button           Electric motor OFF     Switches off the electric motor.


BA RH120E(3 725 055.01)-EN                                                                       2-35

--- Page 9 ---
OPERATING INSTRUCTIONS RH120E Electric
Operation

(Fig. 2-55:) Optional equipment
No.   Element                                  Function                                         Symbol

121 Rotary switch         Fan                  Selects the intensity level of the blower (3
                                               levels).
122 Rotary switch         Mode                 Selects the desired control function (heating,
                                               cooling, ventilation, defrosting).
123 Knob                  Thermostat           Sets the desired temperature inside the cab.

125   Control             Additional heating   Controlling the additional heating device via
                          (optional equip-     touch screen, see Back-up heating manufac-
                          ment)                turers manual.

126   Momentary switch                         Switches additional heating control OFF.

127   Momentary switch                         Switches additional heating control ON.

128   Momentary switch                         Not used on this machine.

129   Momentary switch                         Not used on this machine.

130   Momentary switch                         Reset fault monitoring.


BA RH120E(3 725 055.01)-EN                                                                          2-45

--- Page 10 ---
OPERATING INSTRUCTIONS RH120E Electric
Operation

Switching the electric motor on
and off
Before switching on the electric motor
         Before switching on the electric mo-
         tor, check that nobody is working on
         the electrical system or on the excava-
         tor itself.
         Switch on the electric motor only
         when all these work on the excavator
         is finished and all persons leave the
         danger area.


οƒœ Switch on battery main switch (see: "Battery
  main switch, switching on and off").

οƒœ Switch on electrical system (24V) (see: "Elec-
  trical system (24V), switching on and off").
                                                        Fig. 2-66:
οƒœ Check telltales (14 and 16, Fig. 2-66:), they
  must lit up in green colour.
  If so, electric motor can be switched on (see:
  "Switching the electric motor on").

If telltales didn`t lit up in green colour, BCS has
detected critical operating conditions or faults
which prohibit starting the electric motor. BCS indi-
cates this case with telltales (for instance 15, Fig.
2-66:) as well as by displaying corresponding text.
Switching the electric motor on
οƒœ Actuate switch-key (51, Fig. 2-67:), the electric
  motor is switched on.

During starting period the electric motor heavily
warm up. Therefore it is not allowed to switch it on
and off at will. By means of an electronical time-out
circuit (PLC) the electric motor can be switched on
only three times a hour (time-out period is 30 min-
utes).

                                                        Fig. 2-67:


BA RH120E(3 725 055.01)-EN                                           2-55

--- Page 11 ---
OPERATING INSTRUCTIONS RH120E Electric
 Operation

Travelling                                              Travelling forwards/backwards
                                                        οƒœ Travelling forwards:
Superstructure basic position                             depress pedals (112 and 113) forwards.
                                                          The excavator travels in the direction of the
Travel direction and sense of actuation of pedals         idler (2, Fig. 2-83:).
(112 and 113, Fig. 2-84:) are identical only when
the excavator is in its BASIC POSITION (Fig.            οƒœ Travelling backwards:
2-83:).                                                   depress pedals (112 and 113, Fig. 2-84:) back-
                                                          wards.
                                                          The excavator travels in the direction of the
                                                          drive sprocket (4,Fig. 2-83:).

                                                        During travelling, an acoustic warning signal
                                                        sounds (Travel Alarm).


Fig. 2-83:

             If the superstructure is slewed out of
             its basic position by more than 90Β°
             (Fig. 2-85:), the excavator moves in a
             direction opposite to that expected        Fig. 2-85:
             when pedals (112 and 113, Fig. 2-84:)
             are depressed.
                                                        The pedals return automatically to their "0" posi-
                                                        tions when released.
                                                        Reverse the excavator only over short distances
                                                        and with the assistance of marshallers because of
                                                        restricted rear-view conditions.
                                                        Do not travel across slopes.
                                                                     When travelling uphill or downhill, the
                                                                     travel gears must always be at the
                                                                     rear. Travel only in the basic position
                                                                     of the excavator and only forwards.
                                                                     Be extremely careful on slippery and
                                                                     greasy ground.


                                                        All instructions with regard to travelling speed
Fig. 2-84:                                              regulation and travel direction control are applica-
                                                        ble only as long as the crawler tracks have suffi-
If the operator is not completely sure of the posi-     cient grip and do not slip.
tion of the superstructure with regard to the under-
carriage, pedals (112 and 113) should be de-
pressed slightly in order to find out which way the
excavator moves before initiating the full travelling
movement.


BA RH120E(3 725 055.01)-EN                                                                               2-65

--- Page 12 ---
OPERATING INSTRUCTIONS RH120E Electric
 Operation

WORKING OPERATION
Before starting work                                    Swinging the superstructure
                                                        The superstructure can only be swung if the su-
             Prior to initial commissioning and         perstructure holding brake is released.
             after repairs on the central lubricating   οƒœ To swing the superstructure to the right:
             system or the hydraulic cylinders,             shift control lever (115) to the right.
             move the unloaded equipment for abt.
             5 minutes.                                 οƒœ To swing the superstructure to the left:
             This is required to ensure an adequate       shift control lever (115) to the left.
             supply of grease to the cylinder bear-
             ings when the work starts.                 After releasing, the control lever returns automati-
                                                        cally to position "0". But the superstructures mo-
Warming up                                              tion will not be braked automatically then. To bring
                                                        the superstructure to standstill, shift control lever
At low outside temperatures it is necessary to run
                                                        (115) into the opposite direction of superstructures
the hydraulic system up to operating temperature.
                                                        motion (countering).
The temperatures at which warming up is neces-
sary depend on the type of hydraulic oil used; see
also "Oils for hydraulic systems".
                                                        Braking the superstructure
οƒœ Switch on the electric motor and start to per-
    form no-load working movements for abt. 10          After releasing, the control lever returns automati-
    minutes with the excavator.                         cally to position "0". But the superstructures mo-
                                                        tion will not be braked automatically then.
                                                        The superstructure is braked only by setting con-
                                                        trol lever (115) into the opposite direction (counter-
                                                        ing).
                                                                      In an emergency apply parking brake
                                                                      with switch (82, Fig. 2-100:)


Fig. 2-99:

Switching on the electronic excavator
control
You can only move the working equipment after
the electronic excavator control is switched on via
switch (74, Fig. 2-99:) and the switch inside the
driver’s seat (105).
Electronic excavator control activated - operator is
sitting on his seat.
Electronic excavator control deactivated - driver's
seat is empty.
                                                        Fig. 2-100:


BA RH120E(3 725 055.01)-EN                                                                               2-75

--- Page 13 ---
OPERATING INSTRUCTIONS RH120E Electric
Inspection and servicing

SAFETY INSTRUCTIONS FOR
EXCAVATORS WITH ELECTRIC                                             Connect the earthing kit (8) to the
                                                                     earthing points (2, 3 and 4) only by
MOTOR                                                                means of extension (5).
Maintenance and inspection work on electrical
                                                                     The earthing points may still carry
systems may only be performed by qualified elec-
                                                                     residual voltages.
tricians or by workshops employing such person-
nel.

A qualified electrician for the purpose of this regu-
lation is a person who has the corresponding tech-
nical training, know-how and experience as well as
knowledge of the pertinent prescriptions and who
is therefore in a position to judge the work en-
trusted to him and the potential dangers in connec-
tion therewith.
Before carrying out any maintenance and inspec-
tion work on the electrical system, the following
precautions must be taken:
In the transformer station
οƒœ Cut out the supply voltage.
οƒœ Secure against switching on; apply a warning           Fig. 3-1:
  sign.
οƒœ Check that the electrical system is off circuit.
οƒœ Connect to earth and short-circuit.
οƒœ Protect adjacent and live parts against acci-
  dental contact.
On the excavator
οƒœ Cut out the switch-disconnector
  (see the " Switching off the circuit breaker "
  chapter in part 2 of the present operating in-
  structions)
οƒœ Secure the circuit breaker against switching
  on, e.g. seal in the actuating lever in a cabinet.
οƒœ Apply a warning sign.
                                                         Fig. 3-2:
οƒœ Remove the cover (1, Fig. 3-1:).
οƒœ Check that the electrical system is off circuit
  and dead.
ο‚§   Connect to earth and short-circuit:
    (connect the earthing and short-circuiting line
    (8, Fig. 3-2:) in the following order to points (1
    – 4):
    first to the fixed point (1), then
    one after another to the earthing points (2, 3
    and 4).
οƒœ Slide partition (6, Fig. 3-3:) into guide (7).


                                                         Fig. 3-3:


BA RH120E(3 725 055.01)-EN                                                                                  3-3

--- Page 15 ---
OPERATING INSTRUCTIONS RH120E Electric
Inspection and servicing

INSPECTION AND SERVICING                            Oils / Greases
PLANS - INSTRUCTIONS                                For the specification of oils and greases to be used
                                                    refer to the "Lubricants" section.
Intervals                                           The numerals mentioned in the "Oil / Grease" col-
The inspection and Servicing plan lists all jobs    umn in the inspection and Servicing plans have the
which have to be done on the machine at regular     following meaning:
intervals.                                                   I     Oils for combustion engines and
The individual inspection and Servicing plans are                  compressors
marked with letters providing a link between the             II    Oils for hydraulic systems
operating hours (OH) recorded by the hours-run          IIIa, b, c Oils for gearboxes
meter of the machine and the inspection and sSer-           V      Greases for bearings and slewing
vicing plans.                                                      rings

Plan Do all jobs ....
 V ...once prior to initial commissioning.
                                                    Cleaning jobs
 N ...after initial commissioning and du-           Cleaning jobs, especially on cooling systems, must
       ring the running-in period (after 100OH).    be done at shorter intervals if the machine is ex-
 T ...every 10 OH or every working shift 1)         posed to severe dust build-up.
                                2
 W ...every 60 OH or weekly .
 B ...after every 500 OH.
 C ...after every 1000 OH.
                                                    Components
 D ...after every 5000 OH.                          The maintenance intervals for components, e.g.
 E ...after every 10000 OH.                         electric motor and gearboxes, are listed in the fol-
OH = Bh = Operating hours                           lowing Bucyrus HEX maintenance schedules.
                                                    It is possible that the manufacturer's documenta-
                                                    tion for these components states intervals deviat-
                                                    ing from the above-mentioned intervals.
                                                    In such case, only the maintenance intervals speci-
                                                    fied by Bucyrus HEX shall apply.


2
    Whichever comes first.


BA RH120E(3 725 055.01)-EN                                                                         3-13

--- Page 16 ---
OPERATING INSTRUCTIONS RH120E Electric
Inspection and servicing

Plan A - after every 250 OH
(at 250, 750, 1250 ... OH)
Plan B - after every 500 OH                                   Plan C - after every 1000 OH
(at 500, 1500, 2500 ... OH)                                   (at 1000, 2000, 3000, 4000 ... OH)
Plan D - after every 5000 OH                                  Plan E - after every 10000 OH
(at 5000, 15000, 25000 ... OH)                                (at 10000, 20000, 30000, ... OH)
                                                                                                       Page 3 of 5
Location                               Servicing work                  Menge /    Plan Plan Plan Plan Plan
                                                                        No.        A    B    C    D    E
Hydraulic system                       Check pressure (cf. Technical                                 
                                       handbook)
Oil cooler
- Bearing
  - Fastening screw                    Check for tightness                                                 
  - Rubber bearing                     Check condition                                                     
Return-flow filter                     Replace                             7                               
Return-flow filter (cooling            Replace                             2                               
circuit)
Bypass valve                           Check / clean filter sieve          4                               
Bypass valve (cooling circuit)         Check / clean filter sieve          1                               
Magnetic rod                           Check / clean                       1                              
High-pressure filter                   Check / clean                       4                               
                                       Replace                             4                                
High-pressure filter (control          Check / clean                       1                               
circuit)
                                       Replace                             1                                
High-pressure filter (auxiliary        Check / clean                       1                               
control circuit)
                                       Replace                             1                                
High-pressure filter (slewing          Check / clean                       2                               
circuit)
                                       Replace                             2                                
High-pressure filter (feeding          Check / clean                       2                               
circuit)
                                       Replace                             2                                
Breather filter                        Replace                             4                               
Hydraulic oil reservoir                Carry out oil analysis              1                              
                                       Change oil                        167                                 
Pressure accumulator                   Check pressure (cf. Technical      1                                  
                                       handbook)
Cylinder (seals and guide              Replace                                                               
rings)


6
    cf. β€œRefilling quantities – Oilβ€œ table
7
  Unless it is regulary analyzed, the hydraulic oil must be changed every 5000 OH or after 3 years at the
latest


BA RH120E(3 725 055.01)-EN                                                                                   3-23

--- Page 17 ---
OPERATING INSTRUCTIONS RH120E Electric
 Inspection and servicing


III.a Oils for pump gearbox


Fig. 3-10:


BA RH120E(3 725 055.01)-EN                3-33

--- Page 18 ---
OPERATING INSTRUCTIONS RH120E Electric
 Inspection and servicing

Charging the batteries                               Switchgear cabinet
The batteries are charged by the battery charger (
Fig. 3-23:) only if the electrical system with the   Breather filter
circuit breaker is switched on.                      In the switchgear cabinet
The battery main switch (Fig. 3-24:) must be in      ο‚§ For the 6.3 kV power supply (2, Fig. 3-25:),
position I "ON".                                     ο‚§    For the 400 V system (1, Fig. 3-25:),
                                                     ο‚§    For the 24 V system (3, Fig. 3-26:).
                                                     The air is drawn in and cleaned by a ventilator with
                                                     filter.


Fig. 3-23:


                                                     Fig. 3-25:


Fig. 3-24:


                                                     Fig. 3-26:


BA RH120E(3 725 055.01)-EN                                                                          3-43

--- Page 19 ---
OPERATING INSTRUCTIONS RH120E Electric
Inspection and servicing

οƒœ Loosen screws (13, Fig. 3-47:) and take off       If metal filings are detected, locate cause and rec-
  spring clip (14) and disk (15).                   tify.
                                                    Contact the Bucyrus HEX Service, if required.
οƒœ Remove basket (12) and clean in paraffin oil.

οƒœ Install basket (12).

οƒœ Insert filter element (9) together with sealing
  ring (11) and cap (8) with sealing ring (10).

οƒœ Refit cover (3).

οƒœ Clean the magnetic rod
  The magnetic rod is located under cap (19).


                                                    Fig. 3-47:


BA RH120E(3 725 055.01)-EN                                                                          3-53

--- Page 20 ---
OPERATING INSTRUCTIONS RH120E Electric
 Inspection and servicing

Drawing off hydaulic oil                              Cleaning the hydraulic oil reservoir
The hydraulic oil can also be drawn off through the                Explosion hazard.
service station (Fig. 3-64:).
οƒœ Bring hydraulic oil to operating temperature                     Do not use white spirit, paraffin oil or
    (ca. 50Β° C / 122Β°F).                                           other solvents for cleaning.
                                                                   Use diesel fuel or a special flushing
οƒœ Retract hydraulic cylinders as far as possible                   oil.
  and stand working equipment on the ground.
                                                                   Read and observe the "Inspection and
οƒœ Switch off the electric motor.                                   servicing - Safety instructions" chap-
                                                                   ter.
οƒœ Unscrew cap of express coupling (10).

οƒœ Connect hose line of the service vehicle.           Switch off the electric motor.
                                                      Skin contact with hydraulic oil may cause skin in-
The hose line and its use are described in the
                                                      jury.
"Hose line for oil change" section.
οƒœ Remove hose line. The coupling closes auto-         Avoid skin contact.
   matically.                                         Wear protective gloves and firm working clothing.
                                                      Dispose of contaminated hydraulic oil without pol-
οƒœ Screw on protective cap.
                                                      luting the environment and separately from other
                                                      waste.
                                                      οƒœ Drain off hydraulic oil as described under
                                                           "Draining off the hydraulic oil".

                                                      οƒœ Remove cap (3, Fig. 3-65:).

                                                      οƒœ Detach the return-flow filter.


Fig. 3-64:

View the complete manual on HeyDownloads β†’