PDF Operating Instruction Manual CAT Bucyrus RH 90C Hydraulic Excavator - 2 MB

This is the factory operating instruction manual for the CAT Bucyrus RH 90C Hydraulic Excavator.

It provides operators with critical information on safety, controls, and proper operating techniques.

Adhering to the guidelines within this manual is essential for maximizing productivity while maintaining a safe work environment.

It is a must-have resource for anyone operating this powerful piece of mining equipment.

PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
WAWhatsApp fFacebook 𝕏X TGTelegram βœ‰Email
PDF viewer loading area

Text Preview from This Manual

The text below was extracted from the visible preview pages to help you confirm the manual contents before download.

--- Page 1 ---
OPERATING INSTRUCTIONS RH 90C


                            Hydraulic Excavator
                            RH 90C             No.
                            Bucyrus HEX GmbH


BA RH90C(3 725 028.00)-EN

--- Page 3 ---
OPERATING INSTRUCTIONS RH90C
Introduction

1 INTRODUCTION

                   Operating instructions                    Target group

Part 1 INTRODUCTION                         Operating personnel
                                                  +
       FUNDAMENTAL                          Inspection and
       SAFETY INSTRUCTIONS                  servicing personnel
                                                  +
                                            Repair personnel
Part 2 OPERATION                            Operating personnel
                                            The operating personnel must have know-
                                            how relevant to the operation and the appli-
                                            cation of this or comparable machines.


Part 3 INSPECTION AND                       Inspection and servicing personnel
                                            The inspection and servicing personnel must
       SERVICING                            have know-how relevant to the inspection
                                            and servicing of this or comparable ma-
                                            chines.

Part 4 REPAIR WORK                          Repair personnel
                                            The repair personnel must have know-how
                                            and experience relevant to the repair of this
                                            or comparable machines.

Part 5 ANNEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel
Part 6 INDEX                                Operating personnel
                                                  +
                                            Inspection and servicing personnel
                                                  +
                                            Repair personnel


BA RH90C(3 725 028.00)-EN                                                                   1-1

--- Page 4 ---
OPERATING INSTRUCTIONS RH90C
Introduction

Gas, dust, steam and smoke                              Noise
Always start and operate the engine in a well-          During operation, all sound baffles of the machine
vented area;                                            must be closed.
If in an enclosed area, vent the exhaust to the out-    Always wear the prescribed ear protectors.
side;                                                   Oil, grease and other chemical sub-
Do not modify or tamper with the exhaust system         stances
Diesel engine exhaust and some of its constituents      When handling oil, grease or other chemical sub-
are known to cause cancer, birth defects, and           stances, observe the product-related safety regula-
other reproductive harm                                 tions (see safety specifications).
Operate fuel-operated heating systems only on           Be careful when handling hot consumables (risk of
adequately ventilated premises. Before starting the     burning or scalding).
machine on enclosed premises, make sure that
there is sufficient ventilation.
Observe the regulations in force at the respective      Ether
site.                                                   The machine can be equipped with pressure ves-
Carry out welding, flame-cutting and grinding work      sels for cold-starting fluid (ether) installed in the
on the machine only if this has been expressly          engine compartment. Ether is toxic and highly
authorized, as there may be a risk of explosion and     flammable; the vessels are under pressure. These
fire.                                                   pressure vessels can explode if exposed to high
                                                        temperatures (above 49Β°C / 120Β°F) or in the event
Before carrying out welding, flame-cutting and          of damage. Protect the vessels against damage
grinding operations, clean the machine and its          and high temperatures.
surroundings from dust and other inflammable
substances and make sure that the premises are          Do not store pressure vessels with cold-starting
adequately ventilated (risk of explosion).              fluid (ether) on the excavator.
                                                        Do not eat, drink or smoke when replacing pres-
CALIFORNIA Proposition 65 Warning
                                                        sure vessels with cold-starting fluid (ether). Ob-
Diesel fuel and Diesel engine exhaust and some of
                                                        serve the instructions on the pressure vessels.
its constituents are known to the State of California
                                                        Provide for sufficient ventilation (see also Part 3
to cause cancer, birth defects, and other reproduc-
                                                        "Inspection and servicing").
tive harm.
                                                        Do not open empty cold-starting fluid pressure
Hydraulic equipment                                     vessels (ether). Have the vessels disposed of
Check all lines, hoses and screwed connections          properly.
regularly for leaks and obvious damage. Repair          For further details please refer to the instructions
damage immediately. Splashed oil may cause              and safety data-sheets of the manufacturer / sup-
injury and fire.                                        plier of pressure vessels with cold starting fluid
Depressurize all system sections and pressure           (ether).
pipes (hydraulic system) to be removed in accor-
dance with the specific instructions for the unit
concerned before carrying out any repair work.
                                                        Transporting and recommissioning
                                                        The machine must be loaded and transported only
Hydraulic lines must be laid and fitted properly.
                                                        in accordance with the operating instructions.
Ensure that no connections are interchanged. The
fittings, lengths and quality of the hoses must com-    Use only appropriate means of transport and lifting
ply with the technical requirements.                    gear of adequate capacity.
                                                        The recommisioning procedure must be strictly in
                                                        accordance with the operating instructions.


BA RH90C(3 725 028.00)-EN                                                                               1-11

--- Page 5 ---
OPERATING INSTRUCTIONS RH90C
Operation

Excavator layout
                                                44 – Grease container of central lubricating sys-
Fig. 2-1:
                                                     tem
Undercarriage
                                                45 – Tool cabinet (optional)
1 - Track drive
                                                46 – Ladder
2 – Idler
                                                47 – Ladder
3 - Track roller
                                                48 - Counterweight
4 - support roller
5 - Crawler track                               Loading bucket
6 - Track tensioner                             51 – Boom
7 - Swing ring                                  52 - TriPower linkage
8 - Ladder                                      53 – Stick
                                                54 - Bottom-dump bucket
Superstructure
                                                55 - Boom cylinder
11 – Engine
                                                56 - Stick cylinder
12 - Radiator (engine cooling liquid)
                                                57 - Tipping cylinder
13 - Air-intake system
                                                58 - Bottom-dump cylinder
14 - Exhaust system
                                                64 - Control valves
15 - Fuel Tank
                                                65 - Quick-action valve
17 - Hydraulic oil reservoir
18 – Hydraulic oil cooler                       Backhoe bucket
20 – Pump transfer gearbox                      53 - Stick
21 - Working pump                               55 - Boom cylinder
22 – Cooling oil pump                           56 - Stick cylinder
23 - Servo system pump                          59 - Monoblock boom
27 – Swing pump                                 60 - Backhoe bucket
29 - Swing gear                                 61 - Backhoe cylinder
30 - Travel block and rotor                     62 - Toggle link
31 - Driver's cab                               63 - Toggle lever
32 - Control stand with BCS                     64 - Control valves
33 - Control-cabinet                            65 - Quick-action valve
34 - Air conditioner
35 - Fire-extinguisher
36 - Control-cabinet with battery main switch
37 – Batteries


BA RH90C(3 725 028.00)-EN                                                                       2-7

--- Page 6 ---
OPERATING INSTRUCTIONS RH90C
 Operation

Driver’s seat                                              Never adjust the seat while driving. Con-
                                                           centrate on the road to avoid accidents.
The driver’s seat (Fig. 2-24: and Fig. 2-25:) can be ad-
justed in several positions.                               Before carrying out any seat adjustments
                                                           stop the machine and set the control lev-
                                                           ers to "0"


Fig. 2-24:


BA RH90C(3 725 028.00)-EN                                                                         2-17

--- Page 7 ---
OPERATING INSTRUCTIONS RH90C
Operation

(Fig. 2-44:)


No.    Element                                Function                                       Symbol

  1    BCS              Electronic measur-    Collection and displaying of essential oper-
                        ing-data collection   ating data of the excavator.
                        and processing
                        system

  2    Monitor          BCS                   Displays the data collected.
                                              Gives warnings and provides help, if de-
                                              sired.

  3    UP button                              Selects the BCS program,
                                              Positions the Cursor.

  4    DOWN button                            Selects the BCS program,
                                              Positions the Cursor.

  5    ENTER button                           Confirms a program,
                                              Activates a desired program.

  6    BACK button                            Recalls the Service Menu.


  7    HOLD button                            Freezes actual service data.


  8    Print button                           Recalls the Print Menu.


  9    SERV. button                           Recalls the Service Menu.


  10   HELP button                            Recalls the Help Menu.


  11   BL + button                            Adjusts BCS monitor background lighting
                                              brighter.

  12   BL - button                            Adjusts BCS monitor background lighting
                                              darker.


BA RH90C(3 725 028.00)-EN                                                                       2-27

--- Page 8 ---
OPERATING INSTRUCTIONS RH90C
Operation

(Fig. 2-49:)

No.    Element                                 Function                                         Symbol

  51   Switch             Starting             Starts the engine.
                          (left engine 1)

  52   Switch             Stopping             Shuts off the engine.
                          (left engine 1)

  53   Switch             Idling               Shuts off the engine with 5 minutes after run.
                          (left engine 1)

  54   Switch                                  Not connected

  55   Switch             Diagnostic ON / OFF Not used on this machine.

  56   Speed adjustment   Potentiometer        Adjusting the engine speed -
                          (left engine 1)
                                               ο‚§   turn CCW to limit stop:    idling speed

                                               ο‚§   turn CW to limit stop:     full-load speed

  57   Switch             Diagnostic incre-    Not used on this machine.
                          ment / decrement


BA RH90C(3 725 028.00)-EN                                                                          2-37

--- Page 9 ---
OPERATING INSTRUCTIONS RH90C
Operation

(Fig. 2-54:)

No.   Element                                     Function                                       Symbol

101 Button               Counting dumper          Reset with switch (92).

102 Button               Stick floating posi-     If actuated, stick cylinders are pressurized
                         tion (only for load-     when retracted.
                         ing shovel equip-
                         ment)
                                                          Actuate button (102) only when
                                                          control lever (115) is in β€œ0β€œ posi-
                                                          tion.

103 Button               Boom floating posi-      If actuated, boom cylinders are pressurized
                         tion                     when retracted.

                                                          Actuate button (103) only when
                                                          control lever (116) is in β€œ0β€œ posi-
                                                          tion.

104 Button               Warning signal           Activates the horn.

105 Button inside seat Electronic excavator Switches the electronic excavator control on
                       control              and off.

111 Pedal                Bottom-dump bu-          Opens / closes the bottom-dump bucket.
                         cket
                         (only for loading
                         shovel equipment)
112 Pedal                Travelling, left track   Pedal onwards – travelling forwards,
                                                  Pedal rearwards – travelling backwards.

113 Pedal                Travelling, right        Pedal onwards – travelling forwards,
                         track                    Pedal rearwards – travelling backwards.

114 Foot rest

115 Control lever                                 Lifts and lowers the bucket / backhoe bucket
                                                  stick;
                                                  Swings and brakes the superstructure.

116 Control lever                                 Raises and lowers the boom;
                                                  Tipping and rearward tilting of bucket resp.
                                                  backhoe bucket.

117 Button               Bottom-dump              To the left – opens the bottom-dump bucket.
                         bucket (only for         To the right – closes the bottom-dump bu-
                         loading shovel           cket.
                         equipment
118 Button               By-pass for the          To the left – automatically stopped stick-
                         automatically            and/or backhoe cylinders can be driven
                         switch off for stick-    slowly to the limit stopps.
                         and /or backhoe
                                                  To the right – Not connected.
                         cylinders (Option)


BA RH90C(3 725 028.00)-EN                                                                            2-47

--- Page 10 ---
OPERATING INSTRUCTIONS RH90C
Operation

(Fig. 2-59:) (Options. Depending on the options ordered with the machine, the described elements can be
found on different positions on the control column).

No.    Element                                        Function                                   Symbol

 181   Control elements     Air conditioning          See chapter: β€œAIR CONDITIONER (OP-
                            system                    TION)” for mor information.

 191 Service gauge          Air filter (left engine   Indicates the vakuum in the air filter.
     (vakuum)               1, outside)               Underpressure must be less than 635 mm
                                                      water column.

 192 Service gauge          Air filter (left engine   Indicates the vakuum in the air filter.
     (vakuum)               1, inside)                Vakuum must be less than 635 mm water
                                                      column.

 193 Service gauge          Air filter (left engine   Indicates the vakuum in the air filter.
     (vakuum)               2, inside)                Vakuum must be less than 635 mm water
                                                      column.

 194 Service gauge          Air filter (left engine   Indicates the vakuum in the air filter.
     (vakuum)               2, outside)               Vakuum must be less than 635 mm water
                                                      column.


BA RH90C(3 725 028.00)-EN                                                                            2-57

--- Page 11 ---
OPERATING INSTRUCTIONS RH90C
 Operation


             Do not run engines at full load unless    Starting the engines at low tem-
             they have been allowed to run for at      peratures
             least 3 minutes at idling.
                                                       If the machine is used in low temperatures, the
                                                       engine may be equipped with a cold-starting de-
Repeat the starting procedure if one of the engines    vice.
does not fire. Repeat starting procedure not more      The pressure vessel containing the cold-starting
often than three to four times. Do not operate the     fluid (ether) can be installed in or near the engine
starter for more than 10 seconds.                      compartment.
If, after starting, the BCS or the engine monitoring   The vessel is screwed into an electro-mechanical
devices (Fig. 2-79:) indicates a fault                 metering valve. When the engine is started at
ο‚§ of the PMS                                           temperatures below 0Β°C (32Β°F), this valve is acti-
                                                       vated automatically by the engine electronics and
ο‚§    because of insufficient engine oil pressure
                                                       injects a precisely metered amount of cold-starting
ο‚§    of the alternator                                 fluid into the air intake duct of the engine.
stop the engine concerned immediately.                 Ether is toxic and highly inflammable. Safety in-
                                                       structions and information concerning the handling
Locate the cause of the fault and rectify before       of pressure vessels for cold-starting fluids (ether)
restarting the engine.                                 can be found in the following chapters: "Funda-
                                                       mental safety instructions", "Inspection and servic-
                                                       ing - Safety instructions", "Cold-starting fluid
                                                       (ether) - Replacing the pressure vessel".


Fig. 2-79:


BA RH90C(3 725 028.00)-EN                                                                             2-67

--- Page 12 ---
OPERATING INSTRUCTIONS RH90C
 Operation

Locking the superstructure                          Track parking brake
The excavator is equipped with two superstructure   The excavator is equipped with four track brakes
holding brakes integrated in the swing gearboxes.   integrated in the track drives.
The superstructure holding brakes are used to       The track brakes are parking brakes which relieve
block the superstructure and the undercarriage.     the hydro-static travel drives during working opera-
The superstructure holding brakes are parking       tion and which protect the excavator against rolling
brakes.                                             forwards and backwards.
οƒœ Switch the parking brakes on by means of          The brakes are controlled by means of the travel
    switch (82, Fig. 2-100:):                       pedals (112 and 113, Fig. 2-101:). In neutral posi-
                                                    tion of the pedals, the brakes are applied and the
ο‚§    when the excavator is parked,                  excavator is braked. During travelling, the brakes
ο‚§    when travelling over longer distances.         are released.


                                                    Fig. 2-101:

                                                    The track brakes can also be activated with switch
                                                    (72, Fig. 2-100:).
                                                    Depending on switch position, the brakes are per-
                                                    manently engaged or are automatically applied
                                                    after ca. 8 sec. each time the excavator stops.
Fig. 2-100:
                                                    With this switch position, the brakes are released
                                                    as soon as the "Travel" function is activated.


BA RH90C(3 725 028.00)-EN                                                                          2-77

--- Page 13 ---
OPERATING INSTRUCTIONS RH90C
Operation

                                                         Secure the machine as described below:
Securing the machine
                                                         ο‚§ before carrying out any fitting and modification
Risk of injury                                              work on the working equipment,
The machine must not be started by unauthorized          ο‚§   before carrying out any servicing and repair
persons.                                                     work on the machine.
Therefore, secure the machine.
                                                         οƒœ Park the machine on level and stable ground.
Observe the accident prevention regulations.
Protective shrouds of moving machine parts may           οƒœ Lock the superstructure.
only be opened or removed when the drive unit is
stationary and protected against inadvertent start-      οƒœ Stand the working equipment on the ground.
ing.
                                                         οƒœ Shut off the engines.
Before carrying out fitting works, the machine and
the equipment must be protected against inadver-         οƒœ Depressurize the hydraulic system.
tent starting by placing chocks under the tracks
and by standing the working equipment on the             οƒœ Withdraw the key from the key-switch.
ground.
Hydraulic and lubricating systems
Depressurize pipeline systems, on which work is to
be carried out, by appropriate measures.
Close all open bores, pipe and hose connections
with pressure-resistant plugs.
Refill collected hydraulic oil back into the hydraulic
system only through the return-flow filters. Dispose
of non re-usable oils without polluting the environ-
ment.
All components of Bucyrus HEX machines have
been carefully purpose-coordinated. Trouble-free
operation and a long service life can only be
achieved with original Bucyrus HEX spare parts.
Respect the sequence of working operations when
fitting or replacing the attachments. The sequence
has been determined and tested by qualified ex-
perts.


BA RH90C(3 725 028.00)-EN                                                                               2-87

--- Page 14 ---
OPERATING INSTRUCTIONS RH90C
Inspection and servicing

Handling batteries                                      Handling of cold-starting fluid (ether)
Battery Posts, terminals and related accessories        The engine compartment can be equipped with
contain lead and lead compounds, chemicals              pressure vessels containing cold-starting fluid
known to cause cancer and reproductive harm.            (ether).
Wash hands after handling.                              Ether is toxic and highly flammable; the vessels
Batteries give off explosive gases.                     are under pressure. These pressure vessels can
                                                        explode if exposed to high temperatures (above
Never handle batteries close to naked flames and        49Β°C / 120Β°F) or in the event of damage.
unshielded light sources, never smoke.                  Protect the pressure vessels against damage be-
Battery acid is toxic and corrosive.                    fore beginning to work in or close to the engine
                                                        compartment.
Avoid any contact with the skin, mouth, eyes and        Read and observe the instructions on the pressure
clothing. Avoid spilling battery acid or inhaling the   vessels.
vapours.
                                                        For further details please refer to the instructions
Wear gloves, firm protective clothing and goggles       and safety data-sheets of the manufacturer / sup-
when handling batteries.                                plier of pressure vessels with cold starting fluid
                                                        (ether).
If the skin is splashed with acid, rinse thoroughly
                                                        Provide for sufficient ventilation.
with running water and consult a doctor.
                                                        Do not eat, drink or smoke when replacing an
If the eyes are splashed with acid, rinse thor-         empty vessel.
oughly with running water and consult a doctor
                                                        Do not inhale the vapours of escaping cold-starting
immediately.
                                                        fluid.
Never set tools down on the battery. They may           In contact with the skin, ether can cause frostbites
induce a short circuit, causing irreparable damage      and irritations. Avoid skin contact.
to the battery and injuring persons.
                                                        Wear suitable protective gloves and goggles.
Never wear metal necklaces, bracelets or watch-         Even apparently empty pressure vessels can still
straps when working on the battery. The metal           contain rests of ether and therefore explode if they
parts may induce a short-circuit resulting in burns.    are damaged or heated up above 49Β°C. They must
                                                        therefore be handled in the same way as full pres-
Dispose of used batteries separately from other
                                                        sure vessels.
waste in the interests of environmental protection.
                                                        ο‚§ Do not keep them on the machine.
Before working on the electrical system                 ο‚§   Do not damage or open the vessels.
Before performing work on the electrical system         ο‚§   Do not expose the vessels to great heat or
where tools, spare parts, etc. can come into con-           direct sunlight.
tact with electrical conductors or contacts, the
battery must be disconnected.                           ο‚§   Do not dispose of in fire.

Disconnect first the negative and then the positive     ο‚§   Keep the vessels in a place inaccessible to
terminal.                                                   unauthorized persons.
                                                        ο‚§   Dispose of the vessels properly.
After the work:
Reconnect first the positive and then the negative
terminal.


BA RH90C(3 725 028.00)-EN                                                                                 3-7

--- Page 16 ---
OPERATING INSTRUCTIONS RH90C
Inspection and servicing

Plan T and W
Plan T - (Every 10 OH or every working shift
(whichever comes first)
Plan W - Every 60 OH or every working shift
(whichever comes first)
                                                                                            Page 1 of 2
Location                              Servicing work                          Quantity/   Plan   Plan
                                                                                No.        T      W
Engine                                Check oil level                            2               
Engine monitoring
(Board Control System)                Check monitoring display                                   
Cooling system
Cooling fluid level                   Check                                      2               
Radiator                              Check / clean                              2               
Fuel system
Fuel filter                           Drain off water                           2x1              
Water trap (optional)                 Drain off water                           2x1              
Fuel tank                             Drain off water and sediment                               
Air-intake system                     Check BCS – indication                     1                
Intake and clean-air lines            Check for tightness and leaks                               
Electrical system
Lighting                              Check operation                                            
Switchgear cabinet
- Breather filter
  - Dust trap                         Remove dust                                1                
- EMERGENCY OFF button                Check function                             4                
Monitoring, warning and control       Check function of monitoring, warning                      
elements                              and control elements
BCS                                   Check function                                             
Hydraulic system                      Check function of working and travel-                      
                                      ling movement
                                      Inspect visually for leaks                                  
Hydraulic oil reservoir               Check oil level                            1               
Oil cooler                            Check / clean                              2                
Fan wheel                             Check condition                            2               
Pump transfer gearbox                 Check oil level                            2                


BA RH90C(3 725 028.00)-EN                                                                         3-17

--- Page 17 ---
OPERATING INSTRUCTIONS RH90C
Inspection and servicing

Lubricating chart – Grease (legend)
 No. Greasing point                                      Number             Lubricant              Grease every
                                                                            properties        .... operating hours
     1   Central lubricating system – grease container      1                 V 15                      10
         Hydraulic ladder (optional)                        1                 V 15                       1000
     2   Monitoring, warning and control elements
         - Joystick                                      2 x 4 16              V 15                      1000
                                                                16
         - Pedal                                         3x2                                             1000

All other greasing points are supplied with grease by the central lubricating system.


Filling quantities - Grease
Greasing point                                                  Lubricant                     Filling quant. in
                                                                properties                    kg                lb
Central lubricating system – grease container                                            appr. 180 /      appr. 397 /
(different containers available)                                                         appr. 500        appr. 1102
Internal gearing – Roller-bearing swing ring                         V 15                appr. 100        appr. 220.5
Idler (permanent grease filling)                                                         2 x appr. 3,3      2 x appr.
                                                                                                               7.3
Track rollers (permanent grease filling)                        Tribol                   16 x appr. 2      16 x appr.
                                                         Bucyrus HEX part no.                                  4.4
                                                               2764564
Support rollers (permanent grease filling)                                               4 x appr. 1.3    4 x appr. 3


Lubricating chart – Grease / Backhoe bucket


15
     see: "LUBRICANTS" section.
16
     apply a thin layer of low temperature grease


BA RH90C(3 725 028.00)-EN                                                                                            3-27

--- Page 18 ---
OPERATING INSTRUCTIONS RH90C
 Inspection and servicing

V.          Greases for bearings and swing rings


Fig. 3-8:


BA RH90C(3 725 028.00)-EN                          3-37

--- Page 19 ---
OPERATING INSTRUCTIONS RH90C
 Inspection and servicing

Cooling liquid change                                 Draining off cooling liquid
                                                      οƒœ Shut off the engines.
             Risk of scalding from hot cooling liq-
             uid.                                     οƒœ Drain cooling liquid through express coupling
                                                        (2, Fig. 3-25:) for the lefthand engine.
             Shut off the engines and allow to cool
             down.                                    οƒœ Drain cooling liquid through express coupling

View the complete manual on HeyDownloads β†’