PDF Mechanical Maintenance Manual Cat Bucyrus 2570W Walking Dragline - 1 MB
Unlock the full potential of your Cat Bucyrus 2570W Walking Dragline with this in-depth mechanical maintenance manual.
It provides detailed procedures for servicing, repairing, and troubleshooting the complex mechanical systems of this massive machine.
This manual is designed for skilled technicians to ensure the dragline operates at peak performance and with maximum safety.
It's a critical resource for any mining operation.
PDF Viewer
Viewer loads when you scroll here
SHARE THIS MANUAL
Download the PDF Manual
PDF viewer loading area
Text Preview from This Manual
The text below was extracted from the visible preview pages to help you confirm the manual contents before download.
--- Page 1 ---
BI005545
© Bucyrus
All Rights Reserved
BUCYRUS R
Technical Manual
--- Page 28 ---
BI005545
~
~ ~~:~CASELOWEROIL
~ VERTICAL SHAFT LOWER
•. SLEEVE
t=o=f==I==1F==F=~=f==I==V=E==R==T=IC=A=L
=S=H=A=F=T=L=O=W=E::::R~
•• BEARING
- ),~I==O=t==F=j:=~=F=l==j:=S~W~IN~G~G~E=:A=::RC==A=-SE=-=C=A=jP.
1265 GAL.
EO: MOTOR SHAFT UPPER
~ BEARING
SWING MOTOR
• • MOTOR COUPLING
'SWING MOTOR BRAKE
( INT. SHAFT UPPER
BEARINGS
VERTICAL SHAFT LOWER
BEARINGS
- VERTICAL SHAFT LOWER
SLEEVE
SWING GEARCASE - CAP.
1265 GAL.
~ ~~:~CASE LOWER OIL
& _J
.Lr---------J.·
~ VERTICAL SHAFT LOWER
SLEEVE
t===t==F==j=~=l==j:=~S::=W:::I':=N:::;G=G::=::=EA=:=R;::C=::=:=A::::S::::E=-:::::::C=:=A==P:::j.
1265 GAL.
:J> :J> 0 0 0 (fJ • USE MPG FOR BRAKES EQUIPPED
C (j) Z I Z ~ WITH GREASE FITTINGS USE MPO FOR
~JJ()rn()
o m mom ;;: BRAKES WITHOUT GREASE FITTINGS
:s: 0 m A m :J>
» c < 0 < Z
::1 :D ~ l> ~ c
."
0 m -< r -< :J>
r 0 .f>,. -< (Xl o...,
~ CD I 0 C
mOO "'U JJ
"U I rn rn
~-l ~::t>G)::!
~ ~ JJ
(fJ
m :j m Z ;;:
;;: Z:J> Gl :J>
{j) Cl (j) I Z
C
I I 0
~
JJ
Orne
o C 0 JJ
...,"U JJ C (fJ
oZ (fJ
JJ
rn
:J> o
r
LUBRICATION
SWING MACHINERY (4 UNIT SWING)
FIGURE 112
120
--- Page 29 ---
BI005545
CENTER PINTLE
\~=4:=----------j '"
F=1==I===I=1=l===F=======j
~~
RACK AND SWING PINIONS
,
'/Y;- ~ 1~==f==1=I===f==1========1
/ / "0F=t=t=cF=f=~4==t=U=P=PE=R=A=N=D=L=O=W=E=R=R=AI=Ls==j
/
/~f==j=j==I==l==I=I=======j
n ~ ROLLER FRAME ROLLERS
o
'" CAM BEARING PINS
UPPER CAM FRAME
~
SLIDING SHOE
~ TRUNNION BEARING
I PROPEL LINK
~
LOWER CAM FRAME
~
LOWER CAM FRAME
~ TRUNNION BEARING
SLIDING SHOE
~ TRUNNION BEARING
SHOE PIN LINK
\ ~
. SYSTEMS AP AND AW ARE
ST ANDARD EOUIPMENT: B. C, H
AND K ARE OPTIONAL
in
,.~
Z
,.o
:Il
o
LUBRICATION
PROPEL MACHINERY (EARLIER MACHINES)
FIGURE 116 (CONT.)
© BUCYRUS-ERIE COMPANY, 1985 125
--- Page 30 ---
K LOWER DEFLECTION
BI005545
;'l TOWER BUSHING
K BOOM HOIST SHEAVE
;'l BUSHING
K SUSPENSION LINK
;'l BUSHING
K
;'l
SUSPENSION LINK PIN
K DEFLECTION SHEAVE
;'l BUSHING
K
;'l A-FRAME BACK LEG PIN
K LOWER DEFLECTION
;'l TOWER BUSHING
K DEFLECTION SHEAVE
;'l BUSHING
K MAST DEFLECTION
;'l SHEAVE BUSHING
K UPPER DEFLECTION
;'l TOWER BUSHING
K HOIST ROPE ROLLER
;'l BEARINGS
K
;'l
MAST CROSS TIE PIN
K BOOM HOIST SHEAVE
;'l BUSHING
K
;'l INT SUSP. LINK BUSHING
K UPPER MAIN SUSP LINK
;'l BUSHING
K
;'l INT. SUSP. LINK BUSHING
K LOWER MAIN SUSP LINK
;'l BUSHING
~ DUMP ROPE
K
;'l DUMP SHEAVE PIN
K
;'l
REAR SLEEVE BUSHING
K
;'l REAR THRUST WASHER
K
SWIVEL THRUST WASHER
i HOIST ROPES
K
;'l
FRONT SLEEVE BUSHING
K BOOM POINT SHEAVE
BEARING
INT. SUSP. BUSHINGS
> 0 0 0
z z
"i0 ~ ~ ~
~ ~ m m
< <
~ ffi m m
~
ii z ~
< <
r
c '"ffi i':
~ ~
'"< in~ ~ ~
'"m-< ~ ~
Z
~
Z
~ "0
" "0
I
I I
§ ~ ~
0
z
~
LUBRICATION
FRONT END EQUIPMENT (TRAPEZOIDAL BOOM)
FIGURE 120
130
--- Page 31 ---
BI005545
2. Empty drum. heater can be supplied for use at the control panels
3. Monitor broken supply lines and shut-off sys- and pumping stations, and thermostatically con-
tems if such should occur. trolled heating tape can be supplied which can be
wrapped around the lubrication lines.
4. A vent monitor in systems A and L which
gives warning if the system does not vent
properly. LUBRICANT DRUM HANDLING
The alarm system will be both visible and audible EQUIPMENT (OPTIONAL)
at the control panel and in the operator's cab. As optional equipment an electric hoist can be
COLD WEATHER EQUIPMENT supplied to lift lubricant drums from the ground
(OPTIONAL) onto the machinery deck. Also air operated eleva-
tor hoists can be supplied at each pumping station
As optional equipment for cold weather radiant to facilitate the changing of drums of lubricant.
136
--- Page 32 ---
BI005545
PROBLEM CAUSE CORRECTIVE ACTION
LUBRICATION SYSTEMS (continued)
13. Excessive lubricant Piston and plunger packings Replace packing.
output through worn.
injector.
14. Reduced pressure a. Diaphragm swollen or stiff. a. Replace diaphragm.
through air line
regulator. b. Inner valve disc dirty or worn, b. Clean and/or replace.
or seat scored.
c. Restricted air flow. c. Clean filter and open supply
valve.
15. Excessive pressure Dirty air filter cone. Clean.
drop through air line
filter.
16. Clogging of air line Over-lubrication. Reduce oil feed rate by turning
lubricator. knob to lower setting.
17. Restricted air flow Flattened or kinked lines. Bend or twist lines carefully to
through air lines. relieve restriction.
Make sure all plugs, sockets,
nipples and tees are free from
restrictive defects.
18. Power loss in Electrical failure. Examine all relays, timing units,
controls. disconnect switches and limit
switches; verify all electrical
connections and check wiring
insulation.
AIR SYSTEM - AIR COMPRESSOR
1. No air pressure. a. Leaks in system. a. Check for leaks and repair.
b. Defective compressor or b. Repair or replace.
switch.
c. Overload tripped. c. Inspect compressor and motor,
correct the cause, reset.
2. Frequent starting a. Leaks in system. a. Check for leaks and repair as
and stopping of necessary.
compressor.
b. Frozen lines. b. Clear frozen lines; make sure
anti-freezer is operating
correctly.
c. Switch set incorrectly. c. Check setting, adjust as
necessary. Check valve leak-
ing internally.
3. Compressor over- a. Pump running backwards. a. Check motor rotation and
heating. change connections if
necessary.
© BUCYRUS-ERIE COMPANY, 1985 141
--- Page 33 ---
BI005545
PROBLEM CAUSE CORRECTIVE ACTION
BOOM
1. Cracks in boom Overload. Consult Bucyrus-Erie Company
foot, chords, lacings, Service Department before unaer-
deflection sheave taking repair welding.
towers or boom
point.
2. Activation of pres- Crack in main longitudinal or Track air leak from chord with
surized warning apex chords. sonic detector and consult
system. Bucyrus-Erie Company Service
Department before undertaking
repair welding.
3. Deflection and boom Lubrication deficiency and part Check all manual and automatic
point sheaves do not failure. lubrication systems. Inspect all
rotate freely. bushings, bearings, shafts, and
spacers. Replace if necessary.
4. Broken or damaged Excessive loading. Replace. Be sure to apply SRWL
upper boom struc- to protect the coating on the sup-
tural strands or port or structural strands.
tower support If intermediate boom structural
structural strands. strands are replaced load them
with the take-up device. Refer to
Appendix for values.
5. Handrails, plat- Damaged welds or missing parts. Repair weld or replace parts.
forms, catwalks, or
stairways.
DRAGLINE BUCKET
1. Cracks in shroud, Overloads, shock. Preheat, torch, and repair weld.
clevis plates, side Refer to Appendix for repair
and bottom plates, welding information.
lip and arch.
2. Abrasion, cracking Excessive wear patterns. Hardsurface or replace.
or shearing of tooth
tips.
3. Worn tooth horns. Wear. Check sides and slopes of tooth
horn with template and rebuild if
necessary. Refer to Appendix for
repair welding information.
4. Severe wear or Overload. Use repair links.
breakage of chain
links in rigging.
5. Pivot and swivel Overload. Severe jerking and Restore mountings and lubricate
mountings on frictional rubbing. at periodic intervals.
rigging break.
146
--- Page 34 ---
BI005545
TURNOFTHENUTMETHOD (1) Tighten to values listed =+= 101PiI. The torque
values listed are calculated for 2Qi,\'(, X proof
WARNING: This tightening procedure is good load with lubricated threads and under the
only for bolt grades 5 and 8 with UNC head surfaces of the bolt and nut.
threads. For bolts with other than UNC
threads contact the Bucyrus Erie Service 2. The nuts and bolts should then be matched
Department. marked by center punching the bolt end and
Also, when using this procedure the bolt threads nut. On rod bolts match mark both rod ends
and the surfaces under the bolt head and nut must and nuts. The bolts and nuts should then be
be lubricated. tightened additionally by the applicable
This procedure is applicable only if the joint and amount of nut rotation as specified in Table 4.
under head surfaces for bolt and nut are machined It is not necessary to follow any particular bolt
for parallelism. to bolt sequence during this portion of the
"turn of the nut" tightening.
1. The bolts shall be brought to a "snug tight"
condition to insure that the parts of the joint NOTE: Nut rotation is read between punch
have good contact with each other. "Snug mark on the bolt and punch mark on the nut.
Tight" is defined as the tightness attained by For rod bolts, nut rotation is the cumulative
torquing a bolt to the value specified in Table 3 total rotation between punch marks on both
below. Snug tightening should progress sys- ends of the rod bolt.
tematically from the most rigid part of the
joint to its free edges, alternating from bolt to
bolt to assure gradual even pull up of the mat- TABLE 4
ing parts. After all bolts have been snugged, Part No. Nut Rotation Bolt Length (1)
the first bolts tightened at the most rigid part
of the joint should be rechecked for proper 747773-01 1/3 Turn of ± 10% Up to and
torque. If these bolts are loose due to pull up of including 4
the joint, the snug tightening sequence should diameters.
be repeated for all bolts in the connection. This 747773-02 1/2 Turn of± 10% Over 4 diame-
rechecking and re-torquing procedure should ters but not
be repeated as many times as is required until exceeding 8
the joint is completely pulled up and all bolts diameters
are at the specified "snug tight" torque. Tight-
ness of the mating surfaces of the joint should 747773-03 2/3 Turn ± 10% Over 8 diame-
then be verified by using feeler gauges. ters but not
exceeding 12
diameters
TABLE 3
"SNUG TIGHT" TORQUE VALUES (1) In case part number or nut rotation designa-
tion is not given, the nut rotation can be
Bolt Dia. Torque Values (1)
determined by the bolt length (Grip length +
In. Cm. Ft. Lbs. Nm.
1/2 bolt diameter). For bolt lengths exceeding
.500 1.27 15 20 diameters contact the Bucyrus-Erie Service
.625 1.58 30 40 Department.
.750 1.90 53 71
.875 2.22 86 116
1.000 2.54 128 173
1.250 3.17 224 303
1.500 3.81 390 528
1.750 4.44 457 619
2.000 5.08 688 932
2.250 5.71 1005 1362
2.500 6.35 1375 1864
2.750 6.98 1864 2527
3.000 7.62 2462 3337
4A
--- Page 35 ---
BI005545
APPENDIX A5 - MAINTENANCE WELDING
SECTION 1 - REPAIR WELDING OF BASE, REVOLVING
FRAME, A-FRAME, WALKING SHOES AND DRAG BUCKET
GENERAL part of the design can reduce fatigue strength
because of the change in geometry from the origi-
These recommendations for repair welding apply nal structure.
to the major structural members of the machine
including the base, revolving frame, A-frame walk- RECOMMENDED ELECTRODES
ing shoes, and drag bucket. AND PREHEAT
The high cyclic loading characteristics of the Effective repair welding ofcracked, broken or bent
walking dragline are considered in the design and structural members ofthe machine involves knowl-
material selected for the construction of the ma- edge of the types of steel used, proper welding
chine. However, due to unusual operational condi- electrodes and recognized good welding practice.
tions that may be encountered and to the great The chemical composition, mechanical properties
number of cyclic loadings that may be applied to and thickness of the steel determine the welding
the machine, fatigue cracks or other abnormali- electrode to be used and the preheat temperature
ties may occur. Early detection ofthese conditions required. Refer to Table 1 for types of steel used in
through regular machine inspection helps to avoid the structures and recommended electrode and
problems or emergency breakdowns. preheat.
Maintenance welding is applied to the repair of WELDING ELECTRODES
cracked, broken or bent structural components.
Reconditioning of failed members requires atten- With the exception of the boom and mast, weld
tion to a number of details and careful application repairs on the various structures of the machine
of the repair procedure. Only in certain cases is it made with two basic classifications of shielded
necessary to strengthen members by added rein- metal arc electrodes, namely E7018 and E8018-Cl.
forcement. Both are low hydrogen electrodes which deposit
weld metal having excellent properties at strength
WARNING: Such modifications should be levels with 70,000 to 80,000 pounds per square
made only upon recommendation by Bucyrus- inch, and impact properties from ·20 degrees Fah·
Erie Company. Improperly applied reinforce- renheit to -75 degrees Fahrenheit. These are all
ments can have an adverse effect on the per- position electrodes which produce high quality
formance and life of the structure. welds for repairing the structural components of
heavy machinery.
A broken member is best repaired by making a
complete penetration weld, preferably by welding NOTE: Although these electrodes are of
from both sides, using the correct welding elec- superior quality, care must be exercized in
trode and observing all precautions, such as pre- their application. Low hydrogen electrodes
heat, back-gouging, etc. The complete penetration are highly susceptible to moisture pick-up
groove weld should be ground flush with the base after removal from sealed containers. To
metal on both sides to remove all surface irregular- maintain low hydrogen, that is, crack res-
ities. An alternate procedure incorporates back-up istant properties, they must be stored in
bars to ensure sound, complete penetration welds electrode ovens at 250 degrees Fahrenheit
in the repair area. Be sure to follow all applicable up to the time of use. Small portable rod
safety measures and federal, state and local regu- ovens at the welder's side are ideal. Use of
lations. dry low hydrogen electrodes cannot be over-
emphasized.
The reason for favoring a complete penetration
weld repair conditioned by grinding, instead of Cracks caused by hydrogen are extremely fine and
adding reinforcement, is to maintain the original occur invisibly below the surface in the base metal
pattern of stress flow, designed into the structural heat affected zone, as shown in figure 125. There-
members. Addition of reinforcement which is not fore, they are not detectable at the timeofwelding.
© BUCYRUS-ERIE COMPANY, 1985 IIA
--- Page 36 ---
BI005545
pass to remove all slag before continuing. Grind to REPLACEMENT OF BUCKET LIP
remove any undercut or other defects which occur CENTER SHROUDS
during welding.
Maintain the preheat until arc gouging and weld- BLENDTOO ~
ing has been completed. Arc-air gouge to half
thickness. Prepare a V groove for welding. Weld ~~~~~ ~ ~
this half completely. Turn bucket over. Arc-air
gouge to completely remove the crack from the
~
second side and prepare a V groove for welding as
before.
STRESS RELIEVING
On major repairs, such as a broken lip or one
e
which has cracked through the thickness, thermal
stress relieving is recommended after welding.
Stress relieving is beneficial in removing residual
weld stresses, reducing hardness in the weld area,
restoring ductility and aids in removal of hydro-
gen from the metal.
Electrical resistance heating with thermocouple
temperature control is recommended. The area to
be heated should include several inches on either
side of the repair and should extend the full depth
of the lip from leading edge to the basket. Heating 1" 2"
elements, however, should not be placed over the
plate of the basket. Thermocouples should be
placed over the weld in the area of the thickest and
lo WE~BLEND TO 0
thinnest portions of the lip.
FIGURE 130
Rate of heating and cooling must be controlled to
avoid drastic temperature differences in the metal.
Up to 600 degrees Fahrenheit, the lip can be Install center shrouds according to welding details
heated at the maximum rate attainable with the to welding details shown in figure 130. Install
equipment. Over 600 degrees Fahrenheit, the rate corner shrouds and shroud plates according to
welding details shown in figure 131.
of heating should be restricted to 100 degrees Fah-